OpenList search

Search property intelligence

Search an address, area, Eircode or planning reference across sold-price and planning information.

16 results shown for “Summerhill

Places

Properties / addresses

No matching property addresses found.

Planning applications

2660930

24 Jul 2026

the development will consist of the reinstatement of the existing quarry at Ballynamona, by importing 223,000 tonnes per annum of soil and stone over a 14-year period, with the final profiling and landscaping completed in the following year. The annual soil and stone intake will comprise approximately 128,000 tonnes of non-waste materials notified as by-product under the Article 27 By Product Regulation and up to a maximum of 95,000 tonnes of inert soil and stone classified as waste. The quantity of non-waste material may vary from year to year, while the volume of waste material shall not exceed 95,000 tonnes in any calendar year. The total annual intake of soil and stone will not exceed 223,000 tonnes in any given year. The proposed development also allows for the provision of an additional wheel-wash, two weighbridges, site/weighbridge office and welfare facilities (c. 52sq. m), a waste acceptance quarantine area and a proprietary sanitary wastewater treatment system, and all associated works within an overall application area of 23.8 ha. The reinstatement will require a Soil Recovery Licence issued by the Environmental Protection Agency (EPA). The planning application is accompanied by an Environmental Impact Assessment Report

Ballynamona , Summerhill , County Meath

2660923

22 Jul 2026

the development will consist of single storey house, proprietary effluent treatment system & percolation area, private well, landscaping, new vehicular entrance, & all ancillary site works

Dangan Td. , Summerhill , Co. Meath

2660539

21 Jul 2026

ground floor extension to the existing cottage comprising a dining & family room, conversion of the attic to provide two ensuite bedrooms, construction of a new patio area along with all associated site works

Summerhill , Ballycarnane Tramore , Co. Waterford

2660886

15 Jul 2026

the development will consist of: A part single-storey, part two-storey extension to the rear of the existing bungalow dwelling. A total extension area of 128.6sqm comprising of a first floor (40.9sqm) Master bedroom, wardrobe and bathroom together with a ground floor (87.7sqm) extension including Living room and bootroom areas. Replacement of existing septic tank with a proposed new Waste Water Treatment System and associated percolation area. As well as all associated internal and external alterations and site development works

Springvalley , Summerhill , Co.Meath

REF10126

10 Jul 2026

No extension or exterior changes. As per survey…

Raven Lodge, 17 Summerhill Road, Dún Laoghaire, Dublin, A96VX65 (A Protected Structure)

2660474

26 Jun 2026

indefinite retention of the construction of a garden studio incorporating a home gym, study and games room along with all associated site

Summerhill , Ballycarnane Tramore , Co. Waterford

2660786

25 Jun 2026

(1) Removal of existing overground walled silage pits, (2) Construction of replacement walled silage pits, (3) Installation of effluent collection tank, (4) Completion of all ancillary site works and associated site structures

Summerhill Upper , Drumconrath , Navan Co. Meath

2660756

17 Jun 2026

The development will consist of: the construction of an Integrated Retirement and Assisted Care Development comprising a 2 No. storey nursing home (4,710 sq m) with 95 No. bedspaces; a 2 No. storey staff accommodation building (648 sq m) comprising 12 No. units (8 No. studio units, 2 No. one bed units and 2 No. two bed units); 25 No. 1 No. storey later living / assisted living units (9 No. one bed units and 16 No. two bed units); 15 No. part 1 No. – part 2 No. storey three bed retirement homes; and 3 No. part 1 No. – part 2 No. storey three bed respite care homes. The development will also consist of: the modification and upgrade of the existing vehicular access / egress at New Road (R156); the provision of a footpath along part of the site boundary on New Road (R156) and pedestrian crossing thereat; internal roads and footpaths; 105 No. car parking spaces; a setdown area; bicycle parking; bin storage; a wastewater pumping station; solar panels; hard and soft landscaping; ancillary allotments; boundary treatments; public lighting; signage; and all other associated site and development works above and below ground.

4.14 Ha site fronting New Road (R156) Summerhill Co. Meath. , The site is generally bound to the north by New Road (R156) to the south by greenfield lands , to the east by properties fronting New Road (R156) and greenfield lands and to the west by Kn