Residential development
3 shownMontrose Residential Development, Donnybrook – 511 Units
Cairn Homes Montrose Limited intendsto apply for Permission for a Large-Scale Residential Development (LRD) at this site, which previously formed part of the overall RTÉ Campus at Montrose, Donnybrook, Dublin 4. The site is located within the Simmonscourt Townland. The site is bounded by the Stillorgan Road (R138), 4A Stillorgan Road, ‘Belville Mews’, ‘Belville Lodge’, ‘Belville House’ to the west and south-west; RTE Campus to the south-east and east; Ailesbury Close and ‘Belville’ to the north-west; and ‘Danesfield’ and ‘Danesfield Lodge’, Seaview Terrace, ‘Ailesbury Court’, and properties along Ailesbury Road to the north and north-east. Mount Errol, a designated protected structure (RPS 7846), is located within the site. The proposed development will amend permitted Large Scale Residential Development (LRD) DCC Ref LRD 6003/22- S3 / ACP Reg. Ref.: 315488-23 (as amended by DCC Reg. Ref. WEBLRD6081/25-S3), which is currently under construction. The proposed amendments will increase the total number of residential units by 1 to 511 no. units. The revised residential mix will now comprise 8 no. studios (no change); 125 no. 1-bed apartments (no change); 328 no. 2-bed apartments (increase by 2 no.) and 50 no. 3-bed apartments (decrease by 1 no.). - Alterations to the external elevation materials, balconies/ terraces, windows, and inclusion of pergolas on Blocks 1 to 4. - Inclusion of a new entrance to Block 4. - Alteration to the unit mix of Block 1 to increase the number of units by 1 (from 20 no. to 21 no. units (20 no. 2 beds and 1 no. 3 bed). - Reduction in size of the permitted ESB Substation and switch room at ground floor of Block 1 and inclusion of a storeroom. - Inclusion of a new substation at ground level between Blocks 7 and 8. All associated works to accommodate the proposed changes, including minor internal amendments to the permitted apartments, and associated ancillary works/ landscaping including widened pedestrian entrance from the Stillorgan Road are included in this application. There is no change to the proposed building height or general scale, footprint and massing of permitted Blocks 1 – 4. The remainder of the permitted development will be delivered as permitted under DCC Ref LRD 6003/22-S3 / ACP Reg. Ref.: 315488-23 (as amended by DCC Reg. Ref. WEBLRD6081/25-S3).
ActiveApplication registeredA site which previously formed part of the overall RTE Campus at Montrose, Donnybrook, Dublin 4 · 25 Sept 2026
Conversion of Airfield House to 13 Apartments
SHEC: The change of use of the existing building from office to 13 no. residential apartments to include: (1) Part demolition of internal walls / internal alterations to the existing building and construction works associated with the subdivision of the building to form 13 no. apartments (8 no. 1 bed, 3 no. 2 bed and 2 no. 3 bed apartments) and associated circulation and storage areas (2) Alteration and extension of the existing roof (1.8 m increase in ridge height) to form additional living space at 2nd floor level including 3 no. external terraces (3) Minor alterations to external window / door openings (4) New external / internal platform lifts and new lift to provide wheelchair access to all apartments (5) Construction of a new designated bin / cycle store (6) all other associated works including resurfacing of access road, footpaths, car parking, landscaping and boundary treatments.
ActiveUnder assessmentAirfield House, Airfield Court, Dublin 4 · 24 Sept 2026
Shelbourne Court Apartment Extension, Ballsbridge
October Management Ltd. intend to apply for permission for development on a site of c. 0.0437 ha, comprising an extension to the existing apartment building from 4th floor level at Shelbourne Court, Shelbourne Lane, Ballsbridge, Dublin 4. The development comprises the following: A) The extension of the existing apartment block at Shelbourne Court from 5 storeys over basement level to 7 storeys over basement level; and B) The provision of 4 no. additional apartment units, with private amenity space in the form of balconies, with access from the existing stair and lift cores servicing Shelbourne Court. The proposed units comprise 2 no. 2 bedroom units, and 2 no. 3 bedroom units. Increased bicycle parking will be provided to service the proposed additional units. C) The proposal also includes all site development works necessary to facilitate the proposed extension and development of the building, including minor façade alterations to the building to accommodate the proposed additional storeys. The total number of apartments within the development will be increased from 17 no. units to 21 no. units. There are no changes proposed to the living accommodation of the existing residential units, to communal open space, parking facilities, or the entrance access arrangements within the Shelbourne Court development.
ActiveUnder appealShelbourne Court, Shelbourne Lane, Ballsbridge, Dublin 4 · 7 Apr 2026
