2660212

3 Jul 2026

and permission for construction and completion of replacement dwelling, detached domestic garage, entrance, boundary walls, piers and fencing, proprietary wastewater treatment unit and percolation area and all ancillary site works

Gaigue , Ballinamuck , Co. Longford

2660199

26 Jun 2026

proposed renovations to existing ground floor of an existing two storey type dwelling house together with the proposed construction of a single storey extension to the rear and side of same and all ancillary site works

No. 1 St. Patrick's Court , Ballinamuck , Co. Longford

2660127

20 Apr 2026

(A) The proposed renovations of an existing derelict cottage type dwelling house together with an extension to same. (B) Construction of a detached domestic garage. (C) Demolition of existing outhouses. (D) Installation of a suitable on-site treatment system with polishing filter to service the cottage type dwelling house. (E) Formation of new entrance and all associated ancillary site works

Edenmore , Ballinamuck , Co. Longford

2660104

1 Apr 2026

the proposed construction of a two storey extension to the front of existing office/showroom/workshop building and all ancillary site works

Gaigue , Ballinamuck , Co. Longford

2660084

13 Mar 2026

the proposed construction of a two storey type extension to the side & rear of existing two storey type dwelling house and all ancillary site works

No. 1 St. Patrick's Court , Ballinamuck , Co. Longford

2660061

24 Feb 2026

RED III application for a 10 Year Planning Permission for a solar farm with a total area of circa 11 hectares. The solar farm will consist of solar panels on ground mounted frames, 14 no. electrical inverter stations and 1 no. single storey electrical LV/MV transformer station, 2 no. single storey spare parts containers, 1 no. Ring Main Units, 1 no. MV substation, underground electrical ducting and cabling within the development site, security fencing, CCTV, access tracks, temporary construction compounds, landscaping and all associated ancillary development and drainage works. The proposed development will connect into the existing 20kV overhead electricity line that crosses the site. Construction and operational vehicle access will be via 1 no. new entrance from the L-10193 public road. The operational lifespan of the solar farm will be 40 years and planning permission is requested for this duration. This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413) and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act 2000, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply

in the townland of Shanmullagh , Ballinamuck , Co Longford

2660041

12 Feb 2026

the proposed erection of a tributary sculpture together with associative landscaping, pedestrian access, seating and all ancillary works

Gaigue , Ballinamuck , Co. Longford

2660037

6 Feb 2026

a 10 Year Planning Permission for a solar farm with a total area of circa 11 hectares. The solar farm will consist of solar panels on ground mounted frames, 14 no. single storey electrical inverter stations and 1 no. single storey electrical LV/MV transformer station, 2 no. single storey spare parts containers, 1 no. Ring Main Units, 1 no. MV substation, underground electrical ducting and cabling within the development site, security fencing, CCTV, access tracks, temporary construction compounds, landscaping and all associated ancillary development and drainage works. The proposed development will connect into the existing 20kV overhead electricity line that crosses the site. Construction and operational vehicle access will be via 1 no. new entrance from the L-10193 public road. The operational lifespan of the solar farm will be 40 years and planning permission is requested for this duration. This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413)

in the townland of Shanmullagh , Ballinamuck , County Longford