Planning in Ireland

Leitrim planning applications

Search the latest year of Leitrim County Council planning applications by location, reference, development, applicant or status.

Sold prices in Leitrim
Clear

Matching applications

18 planning applications match the selected filters.

Clear filters

These records do not include usable map coordinates.

2660125

14 May 2026

Status: FURTHER INFORMATION

2660105

27 Apr 2026

Status: FURTHER INFORMATION

2660031

4 Feb 2026

Status: DECISION MADE

2560295

1 Dec 2025

Status: APPLICATION FINALISED

The proposal includes 3 elements: 1. Retention of existing single-storey, ground floor, extension on the front (roadside) elevation of the cottage (outlined blue on drawings): a. The extension is a mixed concrete and block wall construction with a single-pitch roof comprising timber rafters, battens and slates. A portion of this extension was built prior to the Local Government (Planning and Development) Act, 1963. The area of the extension which was deemed to be constructed sometime after the introduction of the planning legislation comprised 6.2m2 of gross floor area and is outlined in orange on the drawings submitted with this application. 2. Removal of leaking small flat roof and recover by extending adjacent new pitched roof (outlined green on drawings): a. The flat roof is approx. 2.5m x 3.5m and is not visible from the public road due to outbuildings on front. b. Existing adjacent pitched slate roof is being recovered with a standing seam system, matching the existing slate colour, suitable for the 15 deg pitch which will be maintained. The current slates are in need of replacement, and the pitch is not suitable for slates. This treatment will be extended to cover the removed flat roof area. c. The proposed replacement roof works, in my opinion, would not materially affect the external appearance of the structures in question so as to render its appearance inconsistent with the character of the structure itself or of the neighbouring structures as per the provisions of Section 4(1)(h) of the Planning and Development Act 2000, i.e. would meet the threshold for exempted development. 3. Construct a ground floor extension to the rear of the property (outlined green on drawings): a. The extension will serve as a small bathroom, with waste piped to the existing septic tank system. The extension is ground floor only and the total ground footprint area is 6.1m2. Internal floor area is 4.5m2. b. In my opinion, this extension is in accordance with the conditions and limitations prescribed in Schedule 2, Part 1, Class 1 of the Planning and Development Regulations 2001, i.e. would meet the threshold for exempted development.

Leitrim County Council

Mullanaskeagh , Dromahair , Co. Leitrim

Application type: RETENTIONDecision: CONDITIONAL
View application details

2560280

12 Nov 2025

Status: APPLICATION FINALISED

2560234

10 Sept 2025

Status: APPLICATION FINALISED

Applications by area

Top Leitrim localities in the imported the latest year.

Dromahair17
Dromahaire1

Monthly registrations

Recent application volume by registration month.

Aug 20251
Sept 20252
Oct 20251
Nov 20253
Dec 20253
Jan 20261
Feb 20261
Mar 20261
Apr 20261
May 20262
Jun 20262

Areas in Jun 2026

Localities with the most applications in the latest registration month.

Dromahair2

Status in Jun 2026

Current status mix for applications registered in the latest month.

FURTHER INFORMATION1
NEW APPLICATION1

Types in Jun 2026

Most common application types registered in the latest month.

PERMISSION1
RETENTION1

Planning activity and trends

Based on the latest 12 months of imported planning data for this council.

Applications

18

Latest registered

24 Jun 2026

Most active area

Dromahair

Most common type

PERMISSION

Latest month apps

2

Month change

0

Monthly trend

Jun 2026

0

01223Aug 25Jan 26Jun 26

Area overview

Dromahair accounts for 94%

Dromahair94%
Dromahaire6%

Status mix

APPLICATION FINALISED accounts for 61%

APPLICATION FINALISED61%
FURTHER INFORMATION22%
DECISION MADE11%
NEW APPLICATION6%

Application types

PERMISSION accounts for 67%

PERMISSION67%
RETENTION22%
EXTENSION OF DURATION11%