Planning in Ireland

Galway City planning applications

Search the latest year of Galway City Council planning applications by location, reference, development, applicant or status.

Sold prices in Galway
Clear

Matching applications

8 planning applications match the selected filters.

Clear filters

These records do not include usable map coordinates.

2660244

8 Jul 2026

Status: NEW APPLICATION

2660124

13 Apr 2026

Status: APPLICATION FINALISED

2660116

3 Apr 2026

Status: APPLICATION FINALISED

2660067

5 Mar 2026

Status: INCOMPLETED APPLICATION

2560319

16 Oct 2025

Status: APPLICATION FINALISED

RED III Permission for development which consists of: the construction and operation of a development consisting of an energy centre building, heat network pipeline, landscaping works, roof mounted solar PV and all other associated ancillary infrastructure at the Merlin Park Industrial Estate and Doughiska Road, within the townland of Doughiska, Galway, Co. Galway. The Galway City East Energy Centre building will integrate multiple low carbon energy technologies. The development will include the installation of 2no. Air Source Heat Pumps (ASHPs) each with a 1.5MW capacity, 2 no. electric boilers, each with a 1.5MW capacity to handle peak loads and temperatures, and 2 no. gas boilers, each with a 1.5MW capacity for emergency back up support. The proposed energy centre building will have a building height of 6.2m, with solar PV panels mounted on the building rooftop. The adjacent building to the east (Smurfit Westrock), will have solar PV panels mounted on the building rooftop. The building to the north (Value Centre), will also have roof mounted solar panels. The proposed development will also include a heat pipeline network consisting of 2no. pipes, with a maximum diameter of 450mm each, spanning a distance of circa. 2390m in an underground trench, from the proposed energy centre building to Doughiska Road, along the length of Doughiska Road, crossing Monivea Road to the north, terminating outside the Clayton Hotel, and crossing Old Dublin Road to the south, terminating outside the Castlegar GAA Club, linking the proposed Galway City East Energy Centre building to future heat customer buildings in the area. Ancillary development will consist of security fencing, access and parking, drainage infrastructure, and landscaping works at the proposed energy centre building. Site preparation will involve foundation works, and construction of essential access facilities to support overall functionality for the purpose of generating renewable heat energy and transmitting it to future heat customer buildings within the townland of Doughiska, Galway Co. Galway (the Proposed Development). Permission is sought for a ten year construction period.

Galway City Council

Merlin Park Industrial Estate and Doughiska Road , Townland of Doughiska , Galway Co. Galway

Application type: PERMISSIONDecision: CONDITIONAL
View application details

2560298

23 Sept 2025

Status: WITHDRAWN

The development will consist of the construction and operation of a development consisting of an energy centre building, heat pipeline network, landscaping works, roof mounted solar PV and all other associated ancillary infrastructure at the Merlin Park Industrial Estate and Doughiska Road, within the townland of Doughiska, Galway, Co. Galway. The Galway City East Energy Centre building will integrate multiple low carbon energy technologies. The development will include the installation of 2no. Air Source Heat Pumps (ASHPs) each with a 1.5MW capacity, 2 no. electric boilers, each with a 1.5MW capacity to handle peak loads and temperatures, and 2 no. gas boilers, each with a 1.5MW capacity for emergency back up support. The proposed energy centre building will have a building height of 6m, with solar PV panels mounted on the building rooftop. The adjacent building to the east (Smurfit Kappa), will have solar PV panels mounted on the building rooftop. The building to the north (Value Centre), will also have roof mounted solar panels. The proposed development will also include a heat pipeline network consisting of 2no. pipes, with a maximum diameter of 400mm each, spanning a distance of circa. 2390m in an underground trench, from the proposed energy centre building to Doughiska Road, along the length of Doughiska Road, crossing Monivea Road to the north, terminating outside the Clayton Hotel, and crossing Old Dublin Road to the south, terminating outside the Castlegar GAA Club, linking the proposed Galway City East Energy Centre building to future heat customer buildings in the area. Ancillary development will consist of security fencing, access and parking, drainage infrastructure, and landscaping works at the proposed energy centre building. Site preparation will involve foundation works, and construction of essential access facilities to support overall functionality for the purpose of generating renewable heat energy and transmitting it to future heat customer buildings within the townland of Doughiska, Galway Co. Galway (the Proposed Development).

Galway City Council

Merlin Park Industrial Estate and Doughiska Road , Townland of Doughiska , Galway Co. Galway

Application type: PERMISSIONDecision: N/A
View application details

Applications by area

Top Galway City localities in the imported the latest year.

Galway City3
Doughiska2
Galway2
Old Dublin Road1

Monthly registrations

Recent application volume by registration month.

Aug 20251
Sept 20251
Oct 20251
Mar 20261
Apr 20263
Jul 20261

Areas in Jul 2026

Localities with the most applications in the latest registration month.

Galway City1

Status in Jul 2026

Current status mix for applications registered in the latest month.

NEW APPLICATION1

Types in Jul 2026

Most common application types registered in the latest month.

PERMISSION1

Planning activity and trends

Based on the latest 12 months of imported planning data for this council.

Applications

8

Latest registered

8 Jul 2026

Most active area

Galway City

Most common type

PERMISSION

Latest month apps

1

Month change

+1

Monthly trend

Jul 2026

-2

01223Aug 25Mar 26Jul 26

Area overview

Galway City accounts for 38%

Galway City38%
Doughiska25%
Galway25%
Old Dublin Road13%

Status mix

APPLICATION FINALISED accounts for 50%

APPLICATION FINALISED50%
DECISION MADE13%
INCOMPLETED APPLICATION13%
NEW APPLICATION13%

Application types

PERMISSION accounts for 63%

PERMISSION63%
RETENTION38%