Planning in Ireland

Galway City planning applications

Search the latest year of Galway City Council planning applications by location, reference, development, applicant or status.

Sold prices in Galway
Clear

Matching applications

9 planning applications match the selected filters.

Clear filters

These records do not include usable map coordinates.

2660242

6 Jul 2026

Status: NEW APPLICATION

Permission for development which consists of: We DRA Community Development Company CLG intend to apply for permission for development at this Site (1.57ha) at townland, Doughiska, Galway. The development will consist of: 1. Removal / demolition of five no. single storey prefabricated classrooms, hard landscaped courtyard area along with bicycle shelter. 2. The construction of a new Community Centre Building (GFA 1,221.15dqm) comprising of two levels, ground floor level of entrance foyer, sports hall, changing rooms, kitchenette, (GFA 927.60sqm), first floor level consisting of viewing gallery/gym/multi-purpose room, 2 no. meeting rooms / studios and meeting room / community room (GFA 293.55sqm) and all associated ancillary accommodation including plant room, circulation areas, kitchenette, storage areas, and welfare facilities. 3. The construction of a new Preschool Building (GFA 569.69 sqm) comprising of a single level with secure access lobby with reception area, five no. classrooms each with dedicated toilet facilities and two with nappy-changing facilities, all associated ancillary accommodation including sleep rooms, staff room, staff toilets, storage rooms, kitchen facility and universal access toilet. Externally a secure enclosed outdoor amenity space provided with a covered walkway which connects to external facilities, storage areas and toilet facilities with the main building. New bicycle shelter and bin store enclosure provided to the front of the building. 4. The installation of a new Synthetic All Weather Playing Pitch (GFA 6,055.97 sqm) enclosed with a 4m high anti climb black welded mesh fence and equipped with six LED floodlights enabling year-round use. 5. The development will also include retaining the existing vehicular entrance along “Fearann Ri” road, the provision of 50 no. car parking spaces (including 4 no. accessible spaces), with 56 no. covered bicycle spaces to serve both the community centre and synthetic all weather playing pitch, 13 no. car parking spaces (including 2. No accessible spaces), 24 no. covered bicycle spaces with a set-down area provided for preschool. 6. The provision of a fixed roof access ladder, roof plant to community centre building, PV panels to both buildings (128 sqm). 7. All associated lighting, signage, boundary treatments, hard and soft landscaping, site development enabling works and all associated site services.

Galway City Council

Doughiska Road , Doughiska , Galway

Application type: PERMISSIONDecision: N/A
View application details

2660121

9 Apr 2026

Status: APPLICATION FINALISED

2660064

4 Mar 2026

Status: APPLICATION FINALISED

2560319

16 Oct 2025

Status: APPLICATION FINALISED

RED III Permission for development which consists of: the construction and operation of a development consisting of an energy centre building, heat network pipeline, landscaping works, roof mounted solar PV and all other associated ancillary infrastructure at the Merlin Park Industrial Estate and Doughiska Road, within the townland of Doughiska, Galway, Co. Galway. The Galway City East Energy Centre building will integrate multiple low carbon energy technologies. The development will include the installation of 2no. Air Source Heat Pumps (ASHPs) each with a 1.5MW capacity, 2 no. electric boilers, each with a 1.5MW capacity to handle peak loads and temperatures, and 2 no. gas boilers, each with a 1.5MW capacity for emergency back up support. The proposed energy centre building will have a building height of 6.2m, with solar PV panels mounted on the building rooftop. The adjacent building to the east (Smurfit Westrock), will have solar PV panels mounted on the building rooftop. The building to the north (Value Centre), will also have roof mounted solar panels. The proposed development will also include a heat pipeline network consisting of 2no. pipes, with a maximum diameter of 450mm each, spanning a distance of circa. 2390m in an underground trench, from the proposed energy centre building to Doughiska Road, along the length of Doughiska Road, crossing Monivea Road to the north, terminating outside the Clayton Hotel, and crossing Old Dublin Road to the south, terminating outside the Castlegar GAA Club, linking the proposed Galway City East Energy Centre building to future heat customer buildings in the area. Ancillary development will consist of security fencing, access and parking, drainage infrastructure, and landscaping works at the proposed energy centre building. Site preparation will involve foundation works, and construction of essential access facilities to support overall functionality for the purpose of generating renewable heat energy and transmitting it to future heat customer buildings within the townland of Doughiska, Galway Co. Galway (the Proposed Development). Permission is sought for a ten year construction period.

Galway City Council

Merlin Park Industrial Estate and Doughiska Road , Townland of Doughiska , Galway Co. Galway

Application type: PERMISSIONDecision: CONDITIONAL
View application details

2560298

23 Sept 2025

Status: WITHDRAWN

The development will consist of the construction and operation of a development consisting of an energy centre building, heat pipeline network, landscaping works, roof mounted solar PV and all other associated ancillary infrastructure at the Merlin Park Industrial Estate and Doughiska Road, within the townland of Doughiska, Galway, Co. Galway. The Galway City East Energy Centre building will integrate multiple low carbon energy technologies. The development will include the installation of 2no. Air Source Heat Pumps (ASHPs) each with a 1.5MW capacity, 2 no. electric boilers, each with a 1.5MW capacity to handle peak loads and temperatures, and 2 no. gas boilers, each with a 1.5MW capacity for emergency back up support. The proposed energy centre building will have a building height of 6m, with solar PV panels mounted on the building rooftop. The adjacent building to the east (Smurfit Kappa), will have solar PV panels mounted on the building rooftop. The building to the north (Value Centre), will also have roof mounted solar panels. The proposed development will also include a heat pipeline network consisting of 2no. pipes, with a maximum diameter of 400mm each, spanning a distance of circa. 2390m in an underground trench, from the proposed energy centre building to Doughiska Road, along the length of Doughiska Road, crossing Monivea Road to the north, terminating outside the Clayton Hotel, and crossing Old Dublin Road to the south, terminating outside the Castlegar GAA Club, linking the proposed Galway City East Energy Centre building to future heat customer buildings in the area. Ancillary development will consist of security fencing, access and parking, drainage infrastructure, and landscaping works at the proposed energy centre building. Site preparation will involve foundation works, and construction of essential access facilities to support overall functionality for the purpose of generating renewable heat energy and transmitting it to future heat customer buildings within the townland of Doughiska, Galway Co. Galway (the Proposed Development).

Galway City Council

Merlin Park Industrial Estate and Doughiska Road , Townland of Doughiska , Galway Co. Galway

Application type: PERMISSIONDecision: N/A
View application details

Applications by area

Top Galway City localities in the imported the latest year.

Doughiska5
Doughiska Road2
Galway2

Monthly registrations

Recent application volume by registration month.

Aug 20252
Sept 20251
Oct 20251
Feb 20261
Mar 20261
Apr 20262
Jul 20261

Areas in Jul 2026

Localities with the most applications in the latest registration month.

Doughiska1

Status in Jul 2026

Current status mix for applications registered in the latest month.

NEW APPLICATION1

Types in Jul 2026

Most common application types registered in the latest month.

PERMISSION1

Planning activity and trends

Based on the latest 12 months of imported planning data for this council.

Applications

9

Latest registered

6 Jul 2026

Most active area

Doughiska

Most common type

PERMISSION

Latest month apps

1

Month change

+1

Monthly trend

Jul 2026

-1

01122Aug 25Feb 26Jul 26

Area overview

Doughiska accounts for 56%

Doughiska56%
Doughiska Road22%
Galway22%

Status mix

APPLICATION FINALISED accounts for 67%

APPLICATION FINALISED67%
DECISION MADE11%
NEW APPLICATION11%
WITHDRAWN11%

Application types

PERMISSION accounts for 78%

PERMISSION78%
RETENTION22%