CRILLY, TULLYLINN, PETTIGOE DONEGAL PO
Donegal County Council2661665Registered 8 Sept 2026
Application registered
VARIATION OF CONDITION NO. 4 OF PERMISSION GRANTED FOR CRILLY WIND FARM (PLANNING REF. NO. 13/51404…
Planning by development type
Wind farms, turbines and related wind-energy planning applications across Ireland.
3 currently active in Donegal · 488 identified in total
Filter by local authority.
Latest activity
Donegal County Council2661665Registered 8 Sept 2026
Application registered
VARIATION OF CONDITION NO. 4 OF PERMISSION GRANTED FOR CRILLY WIND FARM (PLANNING REF. NO. 13/51404…
Donegal County Council2661202Registered 30 Jun 2026
Invalid or incomplete
PROPOSED WORKS TO FACILITATE THE DELIVERY OF TURBINE COMPONENTS TO THE PERMITTED OWENINNY WIND FARM PHASE 3 (REF.
Donegal County Council2660905Registered 20 May 2026
Application registered
(1) ERECTION OF THREE 4.5 MEGAWATTS (MW) WIND TURBINES WITH A BLADE TIP HEIGHT OF 150M CONSISTING OF A ROTOR DIAMETER OF…
Donegal County Council2660788Registered 1 May 2026
CONDITIONAL
DEVELOPMENT ON LANDS WITHIN AND ADJOINING THE PERMITTED LETTERGULL WIND FARM (PLANNING REF. NO. 18/50156…
Latest activity
Final grant · 2 Sept 2026
Donegal County Council2562117Registered 2 Dec 2025
CONDITIONAL
A 10-YEAR PLANNING PERMISSION FOR THE CONSTRUCTION OF TWO WIND TURBINES WITHIN THE LANDHOLDING OF THE CROCKAHENNY…
Latest activity
Final grant · 8 Apr 2026
Donegal County Council2561856Registered 24 Oct 2025
Invalid or incomplete
A 10-YEAR PLANNING PERMISSION FOR THE CONSTRUCTION OF TWO WIND TURBINES WITHIN THE LANDHOLDING OF THE CROCKAHENNY…
Donegal County Council2561652Registered 24 Sept 2025
Withdrawn
10 YEAR PLANNING PERMISSION AND A 30 YEAR OPERATIONAL LIFE FOR THE DEVELOPMENT.
Latest activity
Withdrawn · 10 Dec 2025
Donegal County Council2560337Registered 11 Mar 2025
CONDITIONAL
CONSTRUCTION OF TWO WIND TURBINES WITHIN THE LANDHOLDING OF THE CROCKAHENNY WIND FARM.
Latest activity
Final grant · 4 Jun 2025
Donegal County Council2560056Registered 21 Jan 2025
CONDITIONAL
CONSTRUCTION AND OPERATION OF 2 NO. WIND TURBINES COMPRISING OF A STEEL TOWER, NACELLES…
Latest activity
Final grant · 9 Apr 2025
Donegal County Council2461480Registered 19 Sept 2024
CONDITIONAL
ELEMENTS OF WIND FARM INFRASTRUCTURE AND RECTIFICATION OF ASSOCIATED RED LINE BOUNDARY
Latest activity
Final grant · 18 Jun 2025
Donegal County Council2460857Registered 7 Jun 2024
Invalid or incomplete
10 YEAR PLANNING PERMISSION FOR WORKS RELATING TO BRADÁN WIND FARM WHICH WILL CONSIST OF (1) THE UPGRADE OF…
Donegal County Council2351609Registered 23 Oct 2023
CONDITIONAL
Construction commenced
(1) INSTALLATION OF A GRID TRANSFORMER IN THE PREVIOUSLY CONSENTED…
Latest activity
Final grant · 24 Jan 2024
Donegal County Council2351543Registered 11 Oct 2023
UNCONDITIONAL
GRANT OF A 10 YEAR PLANNING PERMISSION FOR DEVELOPMENT OF A 14 TURBINE WIND FARM ON A SITE IN THE TOWNLAND OF AUGHT…
Latest activity
Decision · 30 Nov 2023
Donegal County Council2351240Registered 21 Aug 2023
Refuse Permission
(A) CONSTRUCTION OF ONE ENERCON E138 WIND TURBINE ON A 99M TOWER WITH AN ELECTRICAL RATING OF 4.2MW…
Latest activity
Appeal decision · 10 Jun 2025
Donegal County Council2351218Registered 17 Aug 2023
REFUSED
CONSTRUCTION OF TWO WIND TURBINES COMPRISING A STEEL TOWER, NACELLES AND COMPOSITE FIBRE ROTOR BLADES…
Latest activity
Decision · 5 Oct 2023
Donegal County Council2350892Registered 23 Jun 2023
CONDITIONAL
(1) A 38KV UNDERGROUND CABLE GRID CONNECTION APPROXIMATELY 9KM IN LENGTH FROM THE CONSENTED DERRYKILLEW COMMUNITY WIND…
Latest activity
Final grant · 24 Apr 2024
Donegal County Council2251568Registered 20 Sept 2022
UNCONDITIONAL
ERECTION OF A SINGLE ELECTRICITY GENERATING WIND TURBINE OF HUB HEIGHT UP TO 45M AND ROTOR DIAMETER UP TO 44M…
Latest activity
Decision · 27 Oct 2022
Donegal County Council2251393Registered 19 Aug 2022
Refuse Permission
A TEN YEAR PLANNING PERMISSION FOR A RENEWABLE ENERGY DEVELOPMENT WITH A 40-YEAR OPERATIONAL LIFE FROM THE DATE OF…
Latest activity
Appeal decision · 18 Sept 2023
Donegal County Council2251214Registered 15 Jul 2022
Grant Permissions with Conditions
(1) CONSTRUCTION OF (A) ONE ENERCON E138 WIND TURBINE ON AN 81M TOWER WITH AN ELECTRICAL RATING OF 4.2MW…
Latest activity
Appeal decision · 27 Oct 2023
Donegal County Council2251213Registered 14 Jul 2022
Refuse Permission
CONSTRUCTION OF A WIND TURBINE WITH AN OPERATIONAL LIFESPAN OF 30 YEARS FROM COMMISSIONING…
Latest activity
Appeal decision · 23 Oct 2023
Donegal County Council2251037Registered 15 Jun 2022
CONDITIONAL
ONE LATTICE TYPE METEOROLOGICAL MAST NOT EXCEEDING 74 METRES IN HEIGHT…
Latest activity
Final grant · 8 Sept 2022
Donegal County Council2250813Registered 11 May 2022
CONDITIONAL
(1) REMOVAL OF THE EXISTING 8 NO. 600 AND 660 KILOWATT (KW) TURBINES AND REPLACEMENT…
Latest activity
Final grant · 17 May 2023
Donegal County Council2250566Registered 4 Apr 2022
Withdrawn
ERECTION OF A SINGLE ELECTRICITY GENERATING WIND TURBINE OF HUB HEIGHT UP TO 45M AND ROTOR DIAMETER UP TO 44M…
Donegal County Council2151990Registered 7 Oct 2021
Under appeal
A 10 YEAR PERMISSION FOR AN AMENDED WIND FARM DEVELOPMENT, WITH AN OPERATIONAL LIFE OF 30 YEARS FROM THE DATE OF THE…
Latest activity
Appeal lodged · 4 Jun 2025
Donegal County Council2151978Registered 6 Oct 2021
Invalid or incomplete
10 YEAR PERMISSION FOR AN AMENDED WIND FARM DEVELOPMENT, WITH AN OPERATIONAL LIFE OF 30 YEARS FROM THE DATE OF THE FIRST…