Planning application 2251393

A TEN YEAR PLANNING PERMISSION FOR A RENEWABLE ENERGY DEVELOPMENT WITH A 40-YEAR OPERATIONAL LIFE FROM THE DATE OF…

MASSLOUGHDERRYDUFF LACKAGHATERMON, ARDARA, DONEGAL PO

Appeal decision

Refused

Council status: APPLICATION FINALISED

Latest milestone · Appeal decision: Refuse Permission

18 Sept 2023

Council record

This application has reached a completed planning stage. New email alerts are no longer available. Existing subscribers can review their saved alerts. My alerts

Planning data and alerts may be delayed or incomplete. Verify important updates and deadlines with the council. Data limitations.

Application timeline

Council and An Coimisiún Pleanála milestones.

  1. Application received

  2. Decision: REFUSED

  3. Appeal lodged with An Coimisiún Pleanála

    Official An Coimisiún Pleanála dataView appeal case
  4. Appeal decision: Refuse Permission

    Official An Coimisiún Pleanála dataView appeal case

Application details

Planning reference
2251393
Council
Donegal County Council
Proposal description
A TEN YEAR PLANNING PERMISSION FOR A RENEWABLE ENERGY DEVELOPMENT WITH A 40-YEAR OPERATIONAL LIFE FROM THE DATE OF COMMISSIONING. THE DEVELOPMENT WILL CONSISTS OF (1) CONSTRUCTION OF 3 WIND TURBINE GENERATORS AND ASSOCIATED HARDSTANDS AREAS WITHIN THE FOLLOWING PARAMETERS (A) A TOTAL TIP HEIGHT IN THE RANGE OF 145 METRES MINIMUM TO 150 METRES MAXIMUM (B) HUB HEIGHT IN THE RANGE OF 82 METRES MINIMUM TO 87 METRES MAXIMUM (C) ROTOR DIAMETER IN THE RANGE OF 121 METRES MINIMUM TO 126 METRES MAXIMUM (2) UPGRADING OF EXISTING SITE ACCESS TRACKS AND ROADS AND PROVISION OF NEW SITE ACCESS TRACK AND ROADS (3) WIDENING OF 3 NO. EXISTING SITE ENTRANCES AND PROVISION OF A NEW SITE ENTRANCE (4) WIDENING OF 4 NO. BENDS AND 1 NO. JUNCTION ALONG THE PUBLIC ROAD L2563 (5) CONSTRUCTION OF (A) A CONTROL BUILDING / SUBSTATION WITH A FENCED COMPOUND PREVIOUSLY PERMITTED UNDER PLANNING REFERENCE 14/50553 AND EXTENDED UNDER PLANNING APPLICATION REFERENCE 19/51227 (B) A NEW TEMPORARY SITE COMPOUND FOR USE DURING CONSTRUCTION (6) SITE DRAINAGE NETWORK (7) INSTALLATION OF INTERNAL WIND FARM UNDERGROUND POWER AND COMMUNICATIONS CABLING (7) ALL ASSOCIATED SITE DEVELOPMENT AND ANCILLARY WORKS. A ENVIRONMENTAL IMPACT ACCESSMENT REPORT (EIAR) AND NATURA IMPACT STATEMENT ACCOMPANY THIS APPLICATION
Location / address
MASSLOUGHDERRYDUFF LACKAGHATERMON, ARDARA, DONEGAL PO
Application type
PERMISSION
Received / registered
19 Aug 2022
Council status
APPLICATION FINALISED
Council decision
REFUSED
Council decision date
13 Oct 2022
Appeal lodged
9 Nov 2022
Appeal decision
Refuse Permission
Appeal decision date
18 Sept 2023