MANORLAND MARKET
See recent sold property prices, pricing trends and sales activity for Manorland.
This page summarises recorded Property Price Register transactions in Manorland, helping you compare recent sale prices and wider local market trends.
Sales activity
Limited data
Last 12 months vs Previous 12 months
0 vs 0 recorded sales
Median price
—
Across last 12 months
Price change
Limited data
Not enough recent sales for a reliable price comparison
Last sale
—
Market prices
Use these signals to compare local property prices, price change and recent market activity in Manorland against nearby parts of Meath.
Market activity
Limited activity data
0 sales in the last 12 months.
Not enough recent sales for a reliable activity comparison.
Recent register entries
Development activity
Recent applications matched by the area name in the published application address. This does not imply a link to any sold property shown above.
26137
15 May 2026
the phase 2 stage of development will consist of the construction of a single and two storey sports facility building with solar roof panels and a ancillary outdoor sports arena comprising of 200m 6 lane running track, a 6 lane 100m sprint track, a 500m perimeter running and walking trial, including long jump, high jump, javelin and shot putt facilities with track and field lighting, car parking and set down area, bicycle parking and the erection of secure boundary perimeter fence with vehicular and pedestrian entrance gates around the site and including connection to existing services where required together with all ancillary site development works. This stage 2 development includes revisions to previously granted phase 1 stage of the development (Planning Ref: 24/84)
Manorland (1st Division) , Trim , Co. Meath
2660278
9 Mar 2026
A Large Scale Residential Develepment - LRD - amendments to Strategic Housing Development (SHD) approved under An Coimisiún Pleanála Ref. ABP-307507-20 (as extended by Meath County Council planning reference Reg. Ref. 25/145) comprising: (i) omission of 8 no. three-storey duplex blocks (accommodating 64 no. duplex apartments – 32 no. two-bedroom & 32 no. three-bedroom) and removal of associated vehicular parking areas, bicycle stores, communal amenity areas, hard/soft landscaping and circulation areas; (ii) provision of 43 no. two-storey houses (5 no. semi-detached three-bedroom units & 38 no. terraced three-bedroom units) each served by private amenity space to the rear and 2 no. on-curtilage car parking spaces; and, (iii) all ancillary works necessary to facilitate the development inclusive of revised road/footpath layout, revised open space layout, landscaping, boundary treatments and SuDS drainage. On foot of the proposed amendment, the scheme will comprise a mix of 10 no. two- bedroom houses, 148 no. three-bedroom houses, 20 no. four-bedroom houses, 11 no. studio apartments, 30 no. one-bedroom apartments, 71 no. two-bedroom apartments and 8 no. three- bedroom apartments for a total of 298 no. residential units in lieu of the 319 no. residential units approved under An Coimisiún Pleanála Ref. ABP-307507-20
Charterschooland and Manorlands 2nd Division , Trim , Co. Meath
2660227
27 Feb 2026
A Large Scale Residential Develepment - LRD - Amendments to Strategic Housing Development (SHD) approved under An Coimisiún Pleanála Ref. ABP-307507-20 (as extended by Meath County Council planning reference Reg. Ref. 25/145) comprising: (i) omission of 8 no. three-storey duplex blocks (accommodating 64 no. duplex apartments – 32 no. two-bedroom & 32 no. three-bedroom) and removal of associated vehicular parking areas, bicycle stores, communal amenity areas, hard/soft landscaping and circulation areas; (ii) provision of 43 no. two-storey houses (5 no. semi-detached three-bedroom units & 38 no. terraced three-bedroom units) each served by private amenity space to the rear and 2 no. on-curtilage car parking spaces; and, (iii) all ancillary works necessary to facilitate the development inclusive of revised road/footpath layout, revised open space layout, landscaping, boundary treatments and SuDS drainage. On foot of the proposed amendment, the scheme will comprise a mix of 10 no. two- bedroom houses, 148 no. three-bedroom houses, 20 no. four-bedroom houses, 11 no. studio apartments, 30 no. one-bedroom apartments, 71 no. two-bedroom apartments and 8 no. three- bedroom apartments for a total of 298 no. residential units in lieu of the 319 no. residential units approved under An Coimisiún Pleanála Ref. ABP-307507-20.
Charterschool Land , Manorlands 2nd Division & Commons Td 7th Division , Trim Co. Meath
25265
17 Dec 2025
The phase 2 stage of development will consist of the construction of a single and two storey sports facility building with solar roof panels and a ancillary outdoor sports arena comprising of 200m 6 lane running track, a 6 lane 100m sprint track, a 500m perimeter running and walking trial, including long jump, high jump, javelin and shot put facilities with track and field lighting, car parking and set down area, bicycle parking and the erection of secure boundary perimeter fence with vehicular and pedestrian entrance gates around the site and including connection to existing services where required together with all ancillary site development works. This stage 2 development includes revisions to previously granted phase 1 stage of the development (Planning Ref: 24/84).
Manorland (1st Division) , Trim , Co. Meath