2 Jul 2026
53 CARROWMORE MEADOWS, KNOCK, CO MAYO
KNOCK, Mayo
Sold price
€170,000
KNOCK MARKET
See recent sold property prices, pricing trends and sales activity for Knock.
This page summarises recorded Property Price Register transactions in Knock, helping you compare recent sale prices and wider local market trends.
Sales activity
Limited data
Across last 12 months
Across last 12 months
Median price
€195,000
Across last 12 months
Price change
Limited data
Not enough recent sales for a reliable price comparison
Last sale
2 Jul 2026
Market prices
Use these signals to compare local property prices, price change and recent market activity in Knock against nearby parts of Mayo.
Price distribution
Most homes in Knock sold between €140,000 and €207,000 across last 12 months.
Recent register entries
2 Jul 2026
KNOCK, Mayo
Sold price
€170,000
8 Jun 2026
KNOCK, Mayo
Sold price
€121,000
5 Jun 2026
KNOCK, Mayo
Sold price
€195,000
29 Apr 2026
KNOCK, Mayo
Sold price
€140,000
12 Dec 2025
KNOCK, Mayo
Sold price
€195,000
4 Dec 2025
KNOCK, Mayo
Sold price
€90,000
1 Dec 2025
KNOCK, Mayo
Sold price
€232,000
31 Oct 2025
KNOCK, Mayo
Sold price
€195,000
Development activity
Recent applications matched by the area name in the published application address. This does not imply a link to any sold property shown above.
2660568
14 Jul 2026
The development will consist of the following: 1) Construction of a housing development with a total of 28 no. dwellings in terrace configurations, consisting of 3 no. 2-bed single-storey units, 15 no. 3-bed two-storey units, 10 no. 4-bed three-storey units. 2) Associated development and works including pedestrian and vehicular access, all hard and soft landscaping, internal roads and footpaths, cycle and car parking, public and private amenities and open spaces, boundary treatments, public lighting, and all other ancillary works above and below ground including connections to water supply, surface water infrastructure, wastewater infrastructure and utilities.
Mount Gordon , Knockaphunta , Castlebar Co. Mayo
26153
8 Jul 2026
construct a summer house in the rear garden that will be ancillary to the main dwelling house together with all ancillary site works and services
Drum , Ballyhaunis Road , Knock
2660541
6 Jul 2026
Planning permission for 1) change of house design to that granted under previous planning permission P23/356, and 2) to construct new domestic shed along with all ancillary works.
Knockfarnaght , Lahardane Ballina , Co. Mayo.
2660537
4 Jul 2026
The construction of a single two-storey detached dwelling house, domestic garage, sewage treatment system and all associated site works at the above address.
Knockanour , Turlough , Castlebar
2660511
30 Jun 2026
Bord na Móna Powergen Ltd., intend to apply for permission for proposed minor temporary and permanent works to facilitate the delivery of turbine components to the permitted Oweninny Wind Farm Phase 3 (Ref. PA16.316178). The Turbine Delivery Route (TDR) will originate at the port of entry at Killybegs Harbour, Co. Donegal, runs through Co. Sligo, Co. Leitrim and terminate at the consented Oweninny Wind Farm Phase 3 site, Co. Mayo. The total length of the TDR is c.188km of which c.65km is within Co. Donegal, c.57km in Co. Sligo, and c.36km in Co. Mayo. Minor temporary and permanent works are not proposed along this entire route but only at select locations. The total area of the works proposed in Co. Mayo is 5.87 Hectares (Ha). The proposed development within Co. County Mayo comprises both temporary and permanent works located in the townlands Lecarrow, Crossmolina, Abbeytown, Knockalegan, Glebe, Gortskeddia, Ballina, Abbeyhalfquarter, Knocknalyre and Bunree. The works are required to accommodate delivery of Abnormal Indivisible Loads (AIL) and will consist of: • Laying of temporary load bearing surfaces at 6 No. locations • Temporary modification to street furniture (traffic lights, bench, junction boxes, wall and part of a bridge parapet/railing) at 1No. location • Temporary removal of street lighting, bollard and tree removal at 1No. location. • Temporary removal of a wall and gate, berm regarding, hedge trimming and temporary modification to street furniture at 1No location. • Temporary removal of wall and vegetation as well as temporary modifications to street furniture at 1No. location • Temporary entrance to be constructed at 3 No. locations • Construction of a dual-purpose permanent access and public amenity track of approx. 2.7km at Crossmolina, Co. Mayo • Construction of permanent bridge crossing of the River Deel at Crossmolina, Co. Mayo • Installation of permanent lighting along the access and amenity track at Crossmolina, Co. Mayo • Installation of permanent sustainable drainage system along the access and amenity track at Crossmolina, Co. Mayo • Installation of temporary construction compound to include site offices, welfare facilities and car parking at Crossmolina Co. Mayo. • Reinstatement of all temporary works areas to previous condition • All associated and ancillary works required for the accommodation works and construction for the TDR. Permission is sought for a period of 10 years. Separate applications wil
Lecarrow Crossmolina Abbeytown Knockalegan Glebe Gortskeddia Ballina Abbeyhalfquarter Knocknalyre and Bunree , Lecarrow Crossmolina Abbeytown Knockalegan Glebe Gortskeddia Ballina Abbeyhalfquarter Knocknalyre and Bunree , Co. Mayo