Planning application 2660445

Blundelstown–Mullingar 110kV Overhead Line Refurbishment

Located along the Blundelstown – Mullingar 110 kilovolt (kV) overhead line (OHL), commencing within Blundelstown in the townland of Harlockstown Co. Meath, and extending to the existing Mullingar 110kV substation in the townland of Irishtown Cou

Current status

Further information requested

Next key date

Decision due

18 October 2026

Application timeline

Key milestones

Key dated milestones from the planning record.

  1. Application received

  2. Further information requested

  3. Decision due

    Target date

    Current decision target recorded by the council.

OpenList context

Why this application matters

Route and scale

Refurbishment is proposed along 24.2km of the Blundelstown–Mullingar 110kV overhead line, from the Westmeath boundary at Grange More to the existing Mullingar 110kV substation at Irishtown.

Network upgrades

Works include restringing the circuit conductors, fibre wrap, seven replacement steel towers and 73 replacement pole-sets or poles. Replacement structures would broadly match existing dimensions, with towers up to 0.5m and poles up to 3m taller.

Access and construction

The scheme includes a temporary construction compound at Aghadaugh, temporary works to tracks and access routes, vegetation maintenance, foundation repairs and upgrades to retained structures. One temporary access route would be within the curtilage of Millerstown House, a protected structure.

OpenList context is an AI-assisted interpretation of public planning records. Application status and formal decisions are shown separately from this editorial context.

Application details

Planning reference
2660445
Council
Westmeath County Council
Proposal description
Development which will consist of refurbishment works to 24.2 kilometres (km) of OHL; comprising provision of fibre wrap; replacement of 7 no. steel towers; replacement of 73 no. pole-sets/poles; replacement of 9 no. pole-set cross arms only; refurbishment work to 19 no. wooden pole-sets; and the treatment and painting of 2 no. steel towers. These structures (No’s. 182-299) and the associated OHL lie between where the OHL crosses the border into County Westmeath in the townland of Grange More, to where the OHL ties-in to the existing Mullingar 110kV substation in the townland of Irishtown, crossing the County Westmeath townlands of Grange More, Craddanstown, Joristown Lower, Priesttown, Clonreagh, Corbetstown, Higginstown, Hodgestown, Millerstown, Corbally, Edmondstown, Clonlost, Clonickilvant, Ballycor, Aghadaugh, Killynan (Cooke), Mountrobert, Macetown, Rathconnell, Clonsheever, Culleen Beg, Robinstown (Levinge), Ballyglass and Irishtown. The Proposed Development also includes 1 no. temporary Construction Compound in the townland of Aghadaugh. The refurbishment works in County Westmeath will consist of: the replacement (‘restringing’) of the existing OHL circuit conductor wires; the installation of fibre wrap; replacement of 7 no. steel towers and 73 no. wooden pole-sets/poles with similar dimensions and heights as the existing (replacement towers will be no more than 0.5m taller than existing and replacement pole-sets/poles will be no more than 3m taller than existing); installation of replacement parts on towers and pole-sets; foundation refurbishment / strengthening and recapping / clearing of shear blocks; treatment and painting of towers to be retained; all associated site development works, including temporary works areas; clearance of shear block bases; vegetation maintenance works; ancillary site preparation works, site clearance and levelling at the 1 no. temporary construction compound; temporary works to existing tracks and new temporary access routes to each structure, one of which is within the curtilage of Millerstown House (protected structure RPS No. 020-050), in the townland of Millerstown; and all associated works required to facilitate the Proposed Development A Natura Impact Statement (NIS) will be submitted to the Planning Authority with the application.
Location / address
Located along the Blundelstown – Mullingar 110 kilovolt (kV) overhead line (OHL), commencing within Blundelstown in the townland of Harlockstown Co. Meath, and extending to the existing Mullingar 110kV substation in the townland of Irishtown Cou
Application type
PERMISSION
Received / registered
24 Aug 2026
Valid date
24 Aug 2026