Major residential
3 shown89-Dwelling Residential Development, Summerhill
is sought for the construction of 89no. dwellings as a new residential development comprising of 12no. semi-detached two-storey 4-bedroom houses, 16no. semi-detached two-storey 3-bedroom houses, 17no. terraced two-storey 3-bedroom houses, 3no. two-storey duplex blocks with a total of 12no. ground floor and 12no. first floor 2-bedroom apartments, 5no. two-storey maisonette blocks with a total of 10no. ground floor and 10no. first floor 1-bedroom apartments, together with all associated site works.
ActiveApplication registeredSummerhill , Tramore , Co. Waterford · 26 Sept 2026
Sea Cove Phase 3: 99 Dwellings, Newtown, Tramore
the construction of 99no. dwellings as phase 3 of the Sea Cove residential development comprising of 32no. semi-detached and 5no. detached two-storey 4-bedroom houses, 46no. semi-detached two-storey 3-bedroom houses, 2no. two-storey duplex blocks with a total of 8no. ground floor and 8no. first floor 2-bedroom apartments, together with all associated site works and the omission of a three-storey 6-bedroom detached house (type C1), a two-storey 4-bedroom detached house (type A1) and 2no. three-storey apartment buildings with 11no. units in each as previously approved under original application 22/398 for phase 1 of this development
Granted with conditionsNewtown , Tramore , Co. Waterford · 7 Jul 2025
Strandhill Phase 2: 70 Residential Units
for the construction of Strandhill Phase 2 development consisting of 70 no. residential units comprising of; 14 no. 2 storey 4-Bed semi-detached houses, 28 no. 2 storey 3-Bed semi-detached houses, 4 no. 2-storey 3-Bed terrace houses, 2 no. 3 storey dormer 4-Bed detached houses and 1 no. 4 storey split level apartment block comprising of 6 no. 2-Bed duplex apartments at lower ground floor level and lower first floor level and 8 no. 1 -Bed apartments and 8 no. 2-Bed apartments at upper ground and upper first floor levels. The proposed development will also include internal roadways to connect to Strandhill Phase 1, currently under construction, new pedestrian access, new boundary treatments, landscaping, drainage and all ancillary and associated site works. A Natura Impact Statement (NIS) accompanies this application.
RefusedCrobally Upper , Tramore , Co. Waterford · 21 Aug 2024
