OpenList

Planning application 26101

The construction of 67 no. residential units, a new single storey crèche, single storey health centre and a 3 storey…

Tyone, Nenagh, Co. Tipperary

Decision

UNCONDITIONAL

Latest milestone

Decision: UNCONDITIONAL

17 Sept 2026

Application timeline

Key milestones

Key dated milestones from the planning record.

  1. Application received

  2. Decision: UNCONDITIONAL

OpenList context

Why this application matters

Development scale

The scheme provides 67 homes alongside a single-storey crèche, single-storey health centre and three-storey 90-bed nursing home. Housing comprises 55 houses and bungalows plus a two-storey apartment building containing 12 apartments.

Housing mix

The residential element includes one- and two-bedroom semi-detached and terrace bungalows; two-storey two-, three- and four-bedroom houses; and 8 one-bedroom and 4 two-bedroom apartments.

Site access and infrastructure

At Tyone, Nenagh, the layout includes internal roads and footpaths, a distributor road north and east of the development, pedestrian/cycle access from Tyone Road to the west, and vehicular access from Ormond Drive to the south. Works also include drainage, services, an ESB medium-voltage substation, landscaping and boundary treatments.

OpenList context is an AI-assisted interpretation of public planning records. Application status and formal decisions are shown separately from this editorial context.

Application details

Planning reference
26101
Council
Tipperary County Council
Proposal description
The construction of 67 no. residential units, a new single storey crèche, single storey health centre and a 3 storey, 90 bed nursing home. The residential units will consist of: 5 no. 1-bed semi-detached bungalows, 5 no. 2 bed semi-detached bungalows, 13 no. 2 bed mid-terrace bungalows, 2 no. 2 storey 4-bed semi-detached houses, 2 no. 2 storey 4-bed mid terrace houses, 14 no. 2 storey 3 bed semi-detached houses, 14 no. 2 storey 2 bed mid-terrace houses and 1 no. apartment building consisting of: 8 no. 1-bed apartments and 4 no. 2-bed apartments over 2 storeys, located as follows, (2 no. 2 bed and 4 no. 1 bed apartments on ground floor, 2 no. 2 bed and 4 no. 1 bed apartments on first floor), the proposed development will also include new internal roadways and footpaths, a proposed new distributor road to the north and east of proposed development, pedestrian/cycle access off the existing Tyone Road to the west of the site, vehicular access from the existing Ormond Drive, south of proposed site, new vehicular and pedestrian access, new boundary treatments, landscaping, drainage, site services including new ESB Medium Voltage (MV) substation building and all ancillary site works
Location / address
Tyone, Nenagh, Co. Tipperary
Application type
EXTENSION OF DURATION
Received / registered
27 Jul 2026
Council decision
UNCONDITIONAL
Council decision date
17 Sept 2026

Location context

Nearby sold prices

Recent Property Price Register sales in Nenagh. Distances are not shown because the sale records do not contain reliable coordinates.

Explore sold prices