Planning application 2660902
Solar PV Farm at Lisbrien, Nenagh
Lisbrien, Nenagh, Co. Tipperary
Application timeline
Key milestones
Key dated milestones from the planning record.
Application received
OpenList context
Why this application matters
Scale and equipment
The 6.9-hectare solar farm would provide 22,500 sq m of ground-mounted PV arrays, with frames up to 4.7 metres high, four inverter units and two control cabins.
Grid connection and access
Infrastructure includes a 33kV connector cable network, underground cabling and ducting, an internal access track, drainage, security fencing and CCTV. An existing field entrance would be upgraded for construction and operational access.
Site planning history
A solar array of up to 22,500 sq m with two control cabins and four inverter units previously received conditional permission at Lisbrien. A later application to extend that permission was refused.
Operational lifetime
The proposed solar farm is intended to operate for 40 years, followed by decommissioning and reinstatement of the site.
OpenList context is an AI-assisted interpretation of public planning records. Application status and formal decisions are shown separately from this editorial context.
Application details
- Planning reference
- 2660902
- Council
- Tipperary County Council
- Proposal description
- RED III the development and operation of a solar photovoltaic (PV) farm with a total site area of 6.9 hectares comprising of the following – i) construction and operation of 22,500 sqm. of solar PV arrays on ground-mounted metal frames, with a maximum overall height of 4.7 metres, ii) Internal underground trenching, electrical cabling and ducting between the solar PV arrays and electrical invertor units, iii) 4 no. electrical invertor units, iv) use and upgrading of 1 no. existing field access point for construction and operational access to the site.1 no. temporary laydown area, v) 2 no. control cabins, vi) 33kV connector cable network, joint bays and associated works, vii) Internal access track, drainage works, security fencing, CCTV, and all associated ancillary site development works, viii) The decommissioning of the solar farm and reinstatement of the site at the end of its operational life - the application seeks a 10-year permission with an operational lifetime of 40 years
- Location / address
- Lisbrien, Nenagh, Co. Tipperary
- Application type
- PERMISSION
- Received / registered
- 15 Sept 2026
- Valid date
- 15 Sept 2026
Location context
Nearby sold prices
Recent Property Price Register sales in Nenagh. Distances are not shown because the sale records do not contain reliable coordinates.
€347,000
50 BROOKVILLE GREEN, NENAGH, TIPPERARY
Sold 30 Oct 2026
Locality match
€143,000
ST CONLON'S ROAD, NENAGH, CO TIPPERARY
Sold 23 Oct 2026
Locality match
€327,000
CARRIGAHORIG, NENAGH, TIPPERARY
Sold 15 Oct 2026
Locality match
€165,000
LISDUFF, NENAGH, CO TIPPERARY
Sold 8 Oct 2026
Locality match
€442,000
MONAREE, NENAGH, CO TIPPERARY
Sold 8 Oct 2026
Locality match
€130,000
15 CONNOLLY ST, NENAGH, TIPPERARY
Sold 24 Sept 2026
Locality match