Planning application 2660902

Solar PV Farm at Lisbrien, Nenagh

Lisbrien, Nenagh, Co. Tipperary

Current status

Invalid or incomplete

Latest milestone

Application received

15 Sept 2026

Application timeline

Key milestones

Key dated milestones from the planning record.

  1. Application received

OpenList context

Why this application matters

Scale and equipment

The 6.9-hectare solar farm would provide 22,500 sq m of ground-mounted PV arrays, with frames up to 4.7 metres high, four inverter units and two control cabins.

Grid connection and access

Infrastructure includes a 33kV connector cable network, underground cabling and ducting, an internal access track, drainage, security fencing and CCTV. An existing field entrance would be upgraded for construction and operational access.

Site planning history

A solar array of up to 22,500 sq m with two control cabins and four inverter units previously received conditional permission at Lisbrien. A later application to extend that permission was refused.

Operational lifetime

The proposed solar farm is intended to operate for 40 years, followed by decommissioning and reinstatement of the site.

OpenList context is an AI-assisted interpretation of public planning records. Application status and formal decisions are shown separately from this editorial context.

Application details

Planning reference
2660902
Council
Tipperary County Council
Proposal description
RED III the development and operation of a solar photovoltaic (PV) farm with a total site area of 6.9 hectares comprising of the following – i) construction and operation of 22,500 sqm. of solar PV arrays on ground-mounted metal frames, with a maximum overall height of 4.7 metres, ii) Internal underground trenching, electrical cabling and ducting between the solar PV arrays and electrical invertor units, iii) 4 no. electrical invertor units, iv) use and upgrading of 1 no. existing field access point for construction and operational access to the site.1 no. temporary laydown area, v) 2 no. control cabins, vi) 33kV connector cable network, joint bays and associated works, vii) Internal access track, drainage works, security fencing, CCTV, and all associated ancillary site development works, viii) The decommissioning of the solar farm and reinstatement of the site at the end of its operational life - the application seeks a 10-year permission with an operational lifetime of 40 years
Location / address
Lisbrien, Nenagh, Co. Tipperary
Application type
PERMISSION
Received / registered
15 Sept 2026
Valid date
15 Sept 2026