Planning application 21403
Amend the design of the approved development (Planning Ref: 19/600239) which comprises consent for the development of a…
Ballyboe, Clonmel, Co. Tipperary
Decision
Granted with conditions
Latest milestone · Final grant
24 Jun 2021
This application has reached a completed planning stage. New email alerts are no longer available. Existing subscribers can review their saved alerts. My alerts
Planning data and alerts may be delayed or incomplete. Verify important updates and deadlines with the council. Data limitations.
Application timeline
Application received
Decision: CONDITIONAL
Final grant
Application details
- Planning reference
- 21403
- Council
- Tipperary County Council
- Proposal description
- Amend the design of the approved development (Planning Ref: 19/600239) which comprises consent for the development of a temporary (30 years) solar farm with an export capacity of 12 MW comprising of photovoltaic panels on ground mounted frames with associated infrastructure including 4 no. inverter housing cabins, 1 no. control building, 1 no. customer cabin (substation), 1 no. DNO substation, temporary construction compound, ducting and electrical cabling, perimeter agricultural fencing, mounted CCTV cameras and internal access tracks subject to 16 conditions. Amendments proposed are: - - Although the height of the solar panels is increased from 2.7m to a maximum 3.2m, the glint and glare impacts will reduce due to advancements in the assessment and software used. The panel tilt angle will change from between 15 and 25 degrees to 15 and 30 degrees; - The number of solar modules will reduce from 39,168 to 30,060 and the number of pile driven poles installed will increase from 2,548 to 4,258; - Although there will be an increase in the number of Inverter Substations from 4 to 6, these have a lower noise output and will therefore result in lower noise impacts; - An increase in CCTV cameras along the perimeter fence from 8 to 12; - Although the road will remain at a width of 3.5m, the point where it connects from the southern to northern lands is moved to use the existing access; - An almost identical footprint which will increase by 0.03% to 4.08%; and – Increase the output from 12MW to 16MW
- Location / address
- Ballyboe, Clonmel, Co. Tipperary
- Application type
- PERMISSION
- Received / registered
- 29 Mar 2021
- Council decision
- CONDITIONAL
- Council decision date
- 21 May 2021
- Final grant date
- 24 Jun 2021
Location context
Nearby sold prices
Recent Property Price Register sales in Clonmel. Distances are not shown because the sale records do not contain reliable coordinates.
€200,000
24 SLIEVENAMON MEWS, CLONMEL, TIPPERARY
Sold 20 Nov 2026
Locality match
€270,000
60 IRISHTOWN, CLONMEL, CO TIPPERARY
Sold 17 Nov 2026
Locality match
€335,000
36 WHEATFIELDS, CLONMEL, CO TIPPERARY
Sold 16 Nov 2026
Locality match
€45,000
26 HIGHFIELD GROVE, CLONMEL, TIPPERARY
Sold 12 Nov 2026
Locality match
€330,000
KILMORE, CLONMEL, TIPPERARY
Sold 6 Nov 2026
Locality match
€300,000
13 ARD CAOIN, CLONMEL, TIPPERARY
Sold 29 Oct 2026
Locality match
