OpenList

Planning application 20972

A ten year planning permission for a renewable energy development with a 40-year operational life (from the date of…

Farranrory Upper Farranrory Lower Coolnashinnagh and Gortnasmuttaun, Co. Tipperary

Decision

CONDITIONAL

Construction status

Construction commenced

Latest milestone

Works commenced

31 Mar 2025

Application timeline

Key milestones

Planning, appeal and official building-control milestones.

  1. Application received

  2. Decision: CONDITIONAL

  3. Final grant

  4. Works commenced

    Official NBCO/BCMS data

Application details

Planning reference
20972
Council
Tipperary County Council
Proposal description
A ten year planning permission for a renewable energy development with a 40-year operational life (from the date of commissioning of the renewable energy development). The entirety of the development constitutes the provision of a 9-turbine wind farm and all associated works on lands in both Counties Tipperary and Kilkenny. This development comprises part of an overall development for which planning permission is also sought for a 38kV substation in the townland of Killeen, Co. Kilkenny. A separate planning application will be made for an underground grid connection to Tipperary County Council and to Kilkenny County Council. The proposed development will constitute the provision of the following: • Construction of up to 9 turbines each with a maximum overall ground to blade tip height of up to 150 metres and associated foundations and hardstand areas; • Construction of new site entrances and upgrade of existing site entrances; • Internal wind farm underground power and communications cabling; • Upgrade of existing access tracks and provision of new site access roads; • Removal of existing Meteorological Masts and construction of 1 new Meteorological Mast for monitoring wind speeds with a maximum height of up to 85 metres; • Site drainage network • Construction of a new temporary site compound for use during construction; • Two Borrow Pits • Construction of a new on-site 38kV substation The planning application will be accompanied by an Environmental Impact Assessment Report (EIAR) and Natura Impact Statement
Location / address
Farranrory Upper Farranrory Lower Coolnashinnagh and Gortnasmuttaun, Co. Tipperary
Application type
PERMISSION
Received / registered
1 Sept 2020
Council decision
CONDITIONAL
Council decision date
24 Feb 2021
Final grant date
30 Mar 2021

Location context

Nearby sold prices

OpenList shows sold-price context only where a reliable proximity, Eircode or locality relationship can be established.

Explore sold prices
No reliable nearby sold-price match is available for this record. OpenList does not infer an exact property match from an address alone.