SD16A/0210/FEP

29 Jun 2026

Status: Officer Allocation

SD20A/0283/EP

27 May 2026

Status: Decision

Demolition of existing single storey vacant house, garage and outhouse (total gross floor area (GFA) c.291.2sq.m) and removal of existing temporary construction car park; Construction of a single 1-4 storey Central Administration Building and 2 2-storey (with mezzanine) data centres (DUB14 & DUB15) all to be located west of data centres DUB9, DUB10, DUB12 & DUB13 within the MS campus; The Central Administration Building (c.6.03m to c.19.85m high) will comprise central office administration, with staff cafeteria, staff gym and reception (GFA c.3,520sq.m), with provision of PV panels on the roof; each data centre (c.15.6m high to parapet height and c.18.65m to top of roof plant) will include data halls, admin blocks (comprising offices, canteen, loading dock, storage and ancillary areas) and a variety of mechanical and electrical plant areas/structures including Modular Electrical Rooms (MERs), battery rooms and transformer areas. GFA of DUB14 is c.28,072sq.m and GFA of DUB15 is c.28,173sq.m (c.56,246sq.m in total); DUB14 will also include 21 diesel generators and associated sub-stations (E-houses) and 11 mechanical flues (each c.30.75m high); Provision of a gas generator compound (to serve DUB15) containing 20 generators, 5 E-houses and 5 flues (c.25m max height); Provision of a Gas Networks Ireland gas skid including 3 kiosk buildings; Expansion of existing electrical sub-station compound (originally granted under SD07A/0632) to provide 3 additional transformer bays. 3 E-houses and 1 control room, 2 auxiliary transformers; 2 sprinkler tank and pump house areas, 1 additional rainwater harvesting plant; Provision of 168 permanent car parking spaces and 40 cycle parking spaces; Provision of additional western access to the MS campus (to serves the Central Administration Building) from the Business Park estate road (including bridge over the Griffeen River) with existing temporary access to be extinguished; Physical integration with the remainder of the existing MS campus (including internal access roads and landscaping) with associated modifications to the western boundary of the DUB09/DUB10/DUB12/DUB13 data centre development as permitted under SD16A/0088; Provision of a new temporary construction car park (with 802 car spaces, shuttle bus stop and shelter) on site north of the main entrance to the business park; Total gross floor area of the development will be c.59,766sq.m; All associated site development works, drainage and services provision, landscaping, boundary treatments (including security fencing) and associated works; An Environmental Impact Assessment Report (EIAR) has been submitted with this application; The application relates to a development which comprises an activity requiring an integrated pollution prevention and control (IE) licence.

South Dublin County Council

Grange Castle Business Park, Nangor Road, Clondalkin, Dublin 22

Application type: Extension Of Duration Of PermissionDecision: Grant Extension of Duration of Permission
View application details

SD20A/0309/EP

27 Apr 2026

Status: Decision

Provision of 4 new information and communications technology (ICT) Facility buildings and associated development at the subject site, superseding elements of the extant planning permissions on site (Reg. Ref.: SD18A/0068 and Reg, Ref.: SD19A/0185). The application site is subject to an EPA Industrial Emissions Licence (Ref. No,: P1113-01) relating to the Energy Centre permitted on site, The single storey Energy Centre, gas pressure reduction station, and 110kV Gas Insulated Switchgear (GIS) substation permitted under Reg, Ref.: SD18AI0068 and Reg. Ref.: SD19AI0185 will be constructed as previously approved and are not affected by the current application. The proposed development will comprise the following: The construction of 4 ICT Facility buildings (ICT Facilities 1, 2, 3, and 4) with a combined total gross floor area {GFA) of c. 47,564.5 sq.m, Each ICT Facility building includes associated external plant areas, totalling c, 20,649.5 sq,m, ICT Facilities 1, 2, and 3 will be located in the eastern portion of the site, and each comprise a GFA of c. 15,196 sq.m (including ancillary office and administration space) over part two and part three levels with a maximum height of c, 25 metres and a parapet height of c, 19.5 metres, Each of the ICT Facilities will include an associated external plant area of c, 6,624 sq,m, ICT Facility 4 will be located in the southern portion of the site and comprises a GFA of c, 1,976.5 sq,m (including ancillary office and administration space) over two levels with a maximum height of c, 15 metres and a parapet height of c. 10.5 metres, This ICT Facility includes an associated external plant area of c. 777.5sq.m, Each ICT Facility building will accommodate ICT equipment halls, associated electrical and mechanical plant rooms, loading bays, maintenance and storage space, office administration areas, and screened plant. Construction of internal road network and circulation areas, footpaths, provision of 153 no. car parking spaces and 54 no, cycle parking spaces. Connections to vehicular access routes, roads, services and permitted infrastructure relating to the Energy Centre and 110kV GIS substation permitted under Reg, Ref.: SD18A/0068 and Reg, Ref.: SD19A/0185. Provision of emergency generators with associated flues, water storage tanks and associated pump rooms (comprising 150 sq,m in total) to serve each of the proposed ICT Facility Buildings. Hard and soft landscaping and planting, lighting, and all associated works, including underground foul and storm water drainage network, boundary treatments and security fencing, attenuation areas, and utility cables.

South Dublin County Council

3-4, Crag Avenue, Clondalkin Industrial Estate, Clondalkin, Dublin 22

Application type: Extension Of Duration Of PermissionDecision: Grant Extension of Duration of Permission
View application details

SD20A/0324/EP

15 Apr 2026

Status: Registered Application

Demolition of existing two storey dwelling of 'Bulmer' and associated outbuildings and demolition of the existing single storey house of 'Little Acre' and its associated garage and other buildings; demolition of single storey stable building on the overall site; construction of 2 two storey Information Communication Technology (ICT) facilities each with three storey plant levels and associated ancillary development which will have a gross floor area of 30,518sq.m on an overall site of 8.2 hectares; 1 two storey ICT facility (building A) will be located to the south-east of the site and will have a gross floor area of 15,196sq.m including 18 emergency generators located at ground and first floor level within a compound to the north-eastern side of the ICT facility with associated flues that will be 25m in height and will be grouped in four groups of four and 1 group of two flues (18 flues overall); 1 two storey ICT facility (building B) will be located to the north-west of Building A and centrally within the overall site and will have a gross floor area of 15,196sq.m including 18 emergency generators located at ground and first floor level within a compound to the north-eastern side of the ICT facility with associated flues that will be 25m in height and will be grouped in four groups of four and 1 group of two flues (18 flues overall); each of the two ICT facilities will include data storage rooms, associated electrical and mechanical plant rooms, loading bays, maintenance and storage spaces, office administration areas; 2 pump rooms of 25sq.m each (4 overall - 100sq.m) plus water storage tanks and plant as well as a separate house generator that will provide emergency power to the admin and ancillary spaces; each generator will also include a diesel belly tank with a single refuelling area to serve the proposed emergency generators; 1 temporary and single storey substation (26sq.m); ancillary site development works including attenuation ponds and the installation and connection to the underground foul and storm water drainage network and installation of utility ducts and cables; other ancillary site development works will include hard and soft landscaping throughout the site, lighting, fencing, signage, central services road, security gate, sprinkler tank house and 80 car parking spaces and 17 sheltered bicycle parking spaces; the development will be enclosed with landscaping to all frontages including a wetland to the south-east and will be accessed from the Peamount Road (R120) located within the townland of Milltown on lands that contain the 2 residential properties of 'Little Acre' and 'Bulmer' as well as agricultural lands and buildings which are located to the north of the Peamount Road and the lands to the north and within the overall site are subject to a concurrent application for a Power Generation Facility under Reg. SD20A/0058; An Environmental Impact Assessment Report (EIAR) is included with the application.

South Dublin County Council

Within the townland of Milltown, located to the north of Peamount Road (R120), Newcastle, Co. Dublin

Application type: Extension Of Duration Of PermissionDecision: Grant Extension of Duration of Permission
View application details

SD21B/0201/EP

8 Apr 2026

Status: Decision

SD20A/0295/EP

2 Apr 2026

Status: Decision

Amendments and modifications to the permitted data centre development granted under Reg. Ref. SD18A/0134 - ABP Ref. ABP-302813-18 and the temporary substation permission granted under SD19A/0300 to include: Demolition of the two storey dwelling of Weston House; single storey dwelling and outbuildings/ stables of Weston Lodge; and the single storey dwelling and converted garage of Kent Cottage. Retention of sprinkler tank and pump house to the south-west of Building A Data Centre to replace 4 sprinkler tanks; Retention of 40kW(p) PV panels on the roof of Building A Data Centre; Retention of revised size of northern attenuation pond and loss of permitted landscaping to its south; Retention of ramped access to rear of temporary substation permitted under SD19A/0300; Retention of revised flue arrangement for Building A Data Centre from 2 associated flues per generator to 1 associated flue per generator (16 in total) and grouped into 8 towers of two flues each (each 20m high); Retention of revised position of security fence to north, west and south of Building A Data Centre; and retention and modifications of landscape berm along Baldonnel Road and to east of Weston House. Development will consist of new works to include: Modifications of permitted vehicular entrance to the data centre to include a new single storey guard house (37sq.m) and two internal entrance gates; Modification to car parking so that the permitted entrance to the parking area from the east is closed off; Modifications of flue arrangement for Building B Data Centre from 2 associated flues per generator to 1 associated flue per generator (16 in total) and grouped into 8 towers of two flues each (each 20m high); Modifications to permitted landscape scheme to north and south of Building A Data Centre; Removal of roadside entrance to Erganagh House (demolished), Kent Cottage, and the former scaffolding yard; and removal of roadside entrance to Weston House and its replacement with a new agricultural gate and fence to be erected to facilitate access for maintenance and security purposes only all on a site of 9.7Ha located within lands in the Grange Castle South Business Park and the residential properties of Weston House, Kent Cottage and Weston Lodge as well as the former scaffolding yard on land within the townlands of Aungierstown and Ballybane; Ballybane; and Milltown and bounding Baldonnel Road to the west and south and Grange Castle South access road to the north, Baldonnel, Dublin 22.

South Dublin County Council

Townlands within Grange Castle South Business Park, Baldonnel, Dublin 22

Application type: Extension Of Duration Of PermissionDecision: Grant Extension of Duration of Permission
View application details

SDZ21A/0023/EP

20 Jan 2026

Status: Decision

455 residential units (including a mixture of 2 and 3 storey semi-detached and terraced houses, and duplex units and apartments in 3 and 4 storey blocks), new internal roads and footpaths, site access, public open space, car parking, cycle stores, landscaping, bin stores, foul and surface water drainage, boundary walls and fences, ESB substations and all associated site development works. Private and semi-private open space to serve the proposed units will be provided in the form of balconies, terraces and gardens; including revisions to the permitted / under construction Celbridge Link Road (part of Loop Road 3), permitted under Reg. Ref SDZ17A/0009, associated with the provision of access to the development, parallel parking bays, and public lighting; 58 two bed, two storey, terraced houses (Type E1, E2, E3, J1 & J2); 6 three bed, two storey, semi-detached houses (Type 11); 190 three bed, two storey, terraced houses (Type A 1, A2, A3, B1, 82, C1, C2, C3, D1, D2, F1, F2, 11 & 12); 5 three bed, three storey, terraced houses (Type H); 6 four bed, two storey, terraced houses (Type K1, K2); 7 apartment Blocks (Blocks B, D, E, G, H, I & K) containing 111 apartments/duplexes including 32 one bed apartments, 22 two bed and 57 three bed duplex apartments over 3 storeys; 4 apartment Blocks (Blocks A, C, J & L) containing 37 apartments/duplexes including 8 no. one bed apartments, 29 three bed duplex apartments over 4 storeys; 1 apartment Block (Block F) containing 42 apartments including 2 one bed apartments and 40 two bed apartments over 4 storeys on a site located to the south of Tubber Lane, in the north-west of the Adamstown SDZ lands and to the west and south-west of the permitted/under construction Tubber Lane Phase 2 development (Reg. Ref: SDZ19A/0008, as amended under Reg. Ref: SDZ20A/0014).

South Dublin County Council

Tubber Lane, Adamstown, Lucan, Co. Dublin.

Application type: Extension Of Duration Of PermissionDecision: Grant Extension of Duration of Permission
View application details

SD20A/0340/EP

5 Jan 2026

Status: Decision

SD19A/0332/EP

19 Dec 2025

Status: Decision

SD19A/0393/EP

12 Dec 2025

Status: Decision

New educational campus of 2 new school buildings to be delivered on a phased basis including the demolition/removal of the existing 4 four storey educational/former short stay residential blocks (golf apartments) on the site; provision of 1 part three storey, 1000 pupil post primary school including 4 classroom special educational needs unit with a gross floor area of 11,331sq.m including a sports hall and all ancillary teacher and pupil facilities; 1 two storey 16 classroom primary school and 2 classroom special educational needs unit; a general purpose hall and all ancillary teacher and pupils facilities with a gross floor area of 2,820sq.m; vehicular access to the site will be from the existing Fortunestown Lane entrance, which is to be widened; fire tender and delivery access will be from the existing entrance to the northwest of the site, via Fortunestown Lane; cycle and pedestrian access to the site will be from a new entrance on Fortunestown Lane; provision of bicycle and scooter parking; new pedestrian crossing at Saggart Lakes Road, vehicle drop off/set down areas; internal access roads; hard and soft play areas; piped infrastructure and ducting; plant, landscaping and boundary treatments; PV panels; external courtyards; disabled car parking spaces; ESB substation and 1 substation access door to the site boundary wall on Fortunestown Lane; ancillary ramps and stairs; signage; 1 attenuation tank; flood mitigation measures; SUD's; changes in level and all associated site development and excavation works above and below ground.

South Dublin County Council

Fortunestown Lane, Saggart, Co. Dublin

Application type: Extension Of Duration Of PermissionDecision: Grant Extension of Duration of Permission
View application details

SHD3ABP-308398-20/EP

3 Oct 2025

Status: Decision

(i) Demolition of the existing industrial buildings, (ii) construction of: (a) 252 'build-to-rent' apartments in a two to nine storey development. Each apartment has associated private open space in the form of a ground floor terrace or a balcony and has access to 613sq.m of internal communal amenity space (including a concierge and management facilities, communal gym, flexible meeting rooms, library/co-working space, lounge, cinema/multimedia room and external covered game area); 1792sq.m of external communal amenity space at first and second floor levels; and a 65sq.m external covered communal amenity area at first floor level. The development is served by an under-croft carpark accessible from the south-western corner of the site providing a total of 73 parking spaces (including 58 standard spaces, 10 go-car spaces and 5 mobility impaired user parking spaces) and 500 bicycle spaces at ground floor level (372 resident spaces and 128 visitor spaces); and (b) 2 commercial units (comprising of a 95sq.m unit accommodating a café/restaurant and a 145sq.m unit accommodating Class 1, 2 and 8 uses as per the Planning and Development Regulations, 2001-2019, as amended) and a 275sq.m crèche, with associated 86sq.m play area, at ground floor level; (iii) road, junction and streetscape upgrade works along Fourth Avenue and Cookstown Road, including the installation a signalized junction at the intersection of Fourth Avenue and Cookstown Road; (iv) Construction of a temporary access road along the southern site boundary; and (v) associated site and infrastructural works are also proposed which include: foul and surface water drainage; attenuation tanks; lighting; landscaping; boundary treatment; plant areas; ESB substations; and all associated site development works.

South Dublin County Council

Units 66 & 67 Fourth Avenue, Cookstown Industrial Estate, Tallaght, Dublin 24

Application type: Extension Of Duration Of PermissionDecision: Grant Extension of Duration of Permission
View application details

SHD3ABP-309916-21/EP

29 Sept 2025

Status: Decision

Demolition of the existing industrial and commercial office buildings totalling c.4,628sqm; Construction of a Build-to-Rent Housing Development comprising 170 apartment units and crèche arranged in 2 blocks across 4-7 storeys over basement car park (total gross floor area c.13,880sq.m excluding basement); The residential development consists of: 9 x1 bedroom studio apartments; 94 x1 bedroom/2 person apartments; 2 x2 bedroom/3 person apartments; 34 x2 bedroom/4 person apartments; 24 x2 bedroom/4 person duplex apartments and 7 x3 bedroom/5 person apartments with north, south, east and west facing terraces/balconies throughout; Internal communal amenity spaces at ground and fourth floor levels comprising reception, gym, lounge, cinema/tv room, events rooms and ancillary areas; External communal open space including children's play areas and informal amenity spaces at ground floor level between Blocks A and B; Communal roof garden at fourth floor level - total external communal open space c.1,005sq.m; Public open space at ground floor level to the east and south of Block B totalling c.1095sq.m; 1 creche with associated outdoor play area at ground floor level; 73 car parking spaces comprising 64 basement spaces, 4 accessible parking spaces and 5 visitor spaces at surface level; 354 bicycle spaces comprising 264 resident spaces at basement level and 90 visitor spaces at ground floor level; Reconfiguration/removal of existing car parking to the north of the site and access road resulting in a total of 28 car spaces serving the adjoining site; All associated plant including heating centres, gas room, water storage room, break tank room, comms room and bin storage at basement level, ESB substation and switch room at ground level and circulation spaces and stair and lift cores throughout; Vehicular/pedestrian access to the east from Belgard Road. All existing vehicular entrances serving adjoining sites maintained. Fire/emergency and refuse vehicle access and pedestrian access to the south from Colbert's Fort; All associated site development and infrastructural works, services provision, foul and surface water drainage, extension to the foul network, access roads/footpaths, lighting, landscaping and boundary treatment works.

South Dublin County Council

Glen Abbey Complex, Belgard Road, Cookstown Industrial Estate, Dublin 24, D24 W2XA

Application type: Extension Of Duration Of PermissionDecision: Grant Extension of Duration of Permission
View application details

SHD3ABP-308088-20/EP

16 Sept 2025

Status: Decision

SDZ20A/0020/EP

9 Sept 2025

Status: Decision

Demolition of 3 existing dwelling houses in addition to 9 farm structures and outbuildings and the construction of 113 residential units comprising 70 two storey dwelling houses (comprising 61 three bed units and 9 four bed units ranging in size from 109sq.m to 148sq.m); 30 duplex units (comprising 16 two bed units and 14 three bed units ranging in size from 94sq.m to 110sq.m) and 13 apartments (comprising 8 one bed units and 5 two bed units ranging in size from 50sq.m to 73sq.m); duplexes and apartments will be accommodated in 3 four storey blocks which will include balconies/terraces facing north-west and south-east; the development will consist of the demolition of 4,701sq.m of existing gross floor area (730sq.m habitable and 3,971sq.m non-habitable) and the construction of 11,917sq.m gross floor area; vehicular access from the subject lands to Adamstown Way to the south and to Tandy's Lane to the north; a vehicular connection will also be provided to the north-western boundary of the site to allow for a future vehicular connection to Adamstown Park (pending the future development of adjacent third party lands to the north-west); internal routes including new north-south avenues linking Tandy's Lane with Adamstown Way and an east-west avenue which will link to Adamstown Park (pending the future development of adjacent lands); pedestrian connections from the subject lands to Adamstown Park along Tandy's Lane and to Adamstown Way; 145 car parking spaces including on-curtilage and on-street spaces; bicycle parking; bin storage; plant; sedum roofs; solar/photovoltaic panels; boundary treatments; lighting; hard and soft landscaping including 833sq.m public open space and 737sq.m communal open space; changes in levels and all other associated site works above and below ground on lands on a 2.41 Ha site at Tandy's Lane incorporating the dwelling's Carrig (Eircode K78 D348), Coolmore (Eircode K78 XH33) and an unnamed dwelling (Eircode K78 X780) all at Tandy's Lane and are bounded generally to the north-east by Tandy's Lane (with Tandy's Lane Park beyond) to the south-east by Finnstown House Hotel (Protected Structure) and to the south-west and north-west by undeveloped lands; Adamstown Way is located further to the south and Adamstown Park is located further to the west; the application is made in accordance with the Adamstown Planning Scheme 2014 (as amended) and relates to a proposed development with the Adamstown Strategic Development Zone with lands located within the St. Helen's Development Area.

South Dublin County Council

Tandy's Lane, Finnstown, Lucan, Co. Dublin

Application type: Extension Of Duration Of PermissionDecision: Grant Extension of Duration of Permission
View application details

Applications by area

Top South Dublin localities in the imported the latest year.

Dublin 226
Co. Dublin5
Dublin 245
Dublin 164
Dublin 121
Dublin 141

Monthly registrations

Recent application volume by registration month.

Sept 20256
Oct 20252
Nov 20251
Dec 20253
Jan 20262
Mar 20261
Apr 20264
May 20261
Jun 20261
Jul 20261

Areas in Jul 2026

Localities with the most applications in the latest registration month.

Dublin 241

Status in Jul 2026

Current status mix for applications registered in the latest month.

Officer Allocation1

Types in Jul 2026

Most common application types registered in the latest month.

Extension Of Duration Of Permission1

Planning activity and trends

Based on the latest 12 months of imported planning data for this council.

Applications

22

Latest registered

6 Jul 2026

Most active area

Dublin 22

Most common type

Extension Of Duration Of Permission

Latest month apps

1

Month change

0

Monthly trend

Jul 2026

0

02356Sept 25Mar 26Jul 26

Area overview

Dublin 22 accounts for 27%

Dublin 2227%
Co. Dublin23%
Dublin 2423%
Dublin 1618%
Dublin 125%
Dublin 145%

Status mix

Decision accounts for 86%

Decision86%
Officer Allocation9%
Registered Application5%

Application types

Extension Of Duration Of Permission accounts for 100%

Extension Of Duration Of Permission100%