Planning application SDZ23A/0015
Amendments to the Phase 2 residential development permitted under Reg.
Tubber Lane, Adamstown, Lucan, Co. Dublin.
Decision
Grant Permission
Construction status
Construction commenced
Latest milestone
Works commenced (phase 2 of 2)
27 Sept 2023
Application timeline
Key milestones
Planning, appeal and official building-control milestones.
Application received
Decision: Grant Permission
Final grant
Works commenced (phase 2 of 2)
Official NBCO/BCMS data
Application details
- Planning reference
- SDZ23A/0015
- Council
- South Dublin County Council
- Proposal description
- Amendments to the Phase 2 residential development permitted under Reg. Ref.: SDZ19A/0008, as amended under Reg. Ref.: SDZ20A/0014, currently under construction, at a site located in the Tubber Lane Development Area within the Adamstown SDZ area; The application site, which includes an extension of the site boundary of the parent permission to encompass additional car parking, is located to the south of Tubber Lane Road, in the north-west of the Adamstown SDZ lands; The proposed development relates to amendments to the permitted apartment Block C and Block E to provide for an additional 10 apartments (5 to each block), resulting in a total of 52 apartments within Block C and Block E (26 to each block) consisting of provision of 1 additional floor to the permitted 3 storey corners of Block C and Block E (increasing the building height at the corners from the permitted 3 storeys to 4 storeys facing the Celbridge Link Road and Adamstown Drive); Amendments to the permitted floor layout of Blocks C and Block Eat ground and upper floors, including a minor increase in the permitted building footprints and a reconfiguration of the permitted units, to provide for 16 one bed units and 36 two bed units, in lieu of the permitted 10 one bed units, 28 two bed units, and 4 three bed units; Associated amendments to the permitted building facades, including alterations to fenestration and balconies, elevational materials and finishes; Revisions to the permitted bike and bin storage arrangements, including the provision of external standalone bin and bike stores; Associated amendments to the site layout, open space and landscaping to provide for car and cycle parking, foul and surface water drainage, and all services necessary to facilitate the development; All associated site development and ancillary works; The proposed amendment will increase the total number of residential units within the permitted Phase 2 residential development, as amended, from 162 units to 172 units.
- Location / address
- Tubber Lane, Adamstown, Lucan, Co. Dublin.
- Application type
- SDZ Application
- Received / registered
- 27 Apr 2023
- Council decision
- Grant Permission
- Council decision date
- 21 Jun 2023
- Final grant date
- 21 Jun 2023
Location context
Nearby sold prices
Recent Property Price Register sales in Adamstown. Distances are not shown because the sale records do not contain reliable coordinates.
€440,529
3 Herons Lock Rise, Adamstown, Lucan
Sold 31 Aug 2026
Locality match
€502,202
81 Adamstown Way, Adamstown, Lucan
Sold 31 Aug 2026
Locality match
€502,203
15 Redford Grove, Adamstown, Lucan
Sold 28 Aug 2026
Locality match
€407,489
207 Adamstown Way, Adamstown, Lucan
Sold 26 Aug 2026
Locality match
€440,529
12 Redford Way, Adamstown, Lucan
Sold 26 Aug 2026
Locality match
€385,000
26 Redford Avenue, Adamstown, Lucan
Sold 20 Aug 2026
Locality match

