Planning application SD21A/0241
Demolition of the abandoned single storey dwelling and associated outbuilding (206sqm)…
In the townlands of Ballybane & Kilbride within Profile Park, Clondalkin, Dublin 22
Appeal decision
Appeal withdrawn S.140(1)(a)
Construction status
Construction commenced
Latest milestone · Construction commenced
30 Dec 2024
New email alerts are unavailable for this application. Monitoring here relies on the national planning dataset, which can lag council decisions by weeks or longer. Check the official council record for updates and deadlines. Existing subscriptions remain active and can be managed in My alerts.
Planning data and alerts may be delayed or incomplete. Verify important updates and deadlines with the council. Data limitations.
Application timeline
Planning, appeal and official building-control milestones.
Application received
Decision: Grant Permission
Appeal lodged with An Coimisiún Pleanála
Official An Coimisiún Pleanála dataView appeal caseAppeal decision: Appeal withdrawn S.140(1)(a)
Official An Coimisiún Pleanála dataView appeal caseFinal grant
Construction commenced
Official NBCO/BCMS dataConstruction commenced
Official NBCO/BCMS dataConstruction commenced
Official NBCO/BCMS dataConstruction commenced
Official NBCO/BCMS data
Application details
- Planning reference
- SD21A/0241
- Council
- South Dublin County Council
- Proposal description
- Demolition of the abandoned single storey dwelling and associated outbuilding (206sqm); construction of 2 two storey data centers with plant at roof level of each facility and associated ancillary development which will have a gross floor area of 40,589sq.m consisting of 1 two storey data center (Building 11) which will be located to the south of the site and will have a gross floor area of 24,667sq.m. including 22 emergency generators located at ground floor level within a compound to the western side of the data center with associated flues that will be 22.3m in height; 1 two storey data center (Building 12) which will be located to the north of the site, and to the immediate north of Building 11 and will have a gross floor area of 12,915sq.m including 11 emergency generators located at ground floor level within a compound to the western side of the data center with associated flues that will be 22.3m in height; each of the two data centers will include data storage rooms, associated electrical and mechanical plant rooms, loading bays, maintenance and storage spaces, office administration areas, and plant including PV panels at roof level as well as a separate house generator for each facility which will provide emergency power to the admin and ancillary spaces; each generator will include a diesel tank and there will be a refuelling area to serve the proposed emergency generators; the overall height of each data center apart from the flues and plant at roof level is c. 14.23m above the finished floor level; the overall height of each data center apart from the flues and plant at roof level is c. 14.23m above the finished floor level; single storey step-up substation (38sq.m) as well as 2 single storey switch substations (121sq.m); AGI Gas Regulator compound that include 3 single storey buildings (134sq.m); construction of a gas powered generation plant in the form of a 13m high single storey building with a gross floor area of 2,714sq.m that will contain 10 gas generators with associated flues that will be 25m in height, and grouped in pairs and threes; the Gas Plant will be located to the west of Building 11; ancillary site development works, that will include reorientation of the Baldonnel Stream, biodiversity management initiatives, attenuation ponds and the installation and connection to the underground foul and storm water drainage network, and installation of utility ducts and cables, that will include the drilling and laying of ducts and cables under the internal road network within Profile Park; other ancillary site development works will include hard and soft landscaping, lighting, fencing, signage, services road, entrance gates, sprinkler tanks and pump room; a temporary gas powered generation plant within a fenced yard containing 21 generator units in containers, each with associated flues (each 25m high), 12 transformers and 10 containers of controls to be located to the west of, and associated with the first phase of Building 11, and will be required for a period of up to 2 years if connection to the national grid is delayed; this temporary plant will not be built if the connection to the national grid is in place prior to the operation of Building 11 at this site that includes an abandoned single storey residential property on the New Nangor Road (R134), Dublin 22; and on land within the townlands of Ballybane and Kilbride within Profile Park, Clondalkin, Dublin 22 on an overall site of 8.7 hectares.
- Location / address
- In the townlands of Ballybane & Kilbride within Profile Park, Clondalkin, Dublin 22
- Application type
- Permission
- Received / registered
- 21 Mar 2022
- Council decision
- Grant Permission
- Council decision date
- 16 May 2022
- Final grant date
- 19 Jul 2022
- Appeal lodged
- 13 Jun 2022
- Appeal decision
- Appeal withdrawn S.140(1)(a)
- Appeal decision date
- 4 Jul 2022
Location context
Nearby sold prices
Recent Property Price Register sales in Clondalkin Dublin 22. Distances are not shown because the sale records do not contain reliable coordinates.
€286,000
6 GREEN ISLE COURT, CLONDALKIN DUBLIN 22, DUBLIN
Sold 28 Oct 2026
Locality match
€371,000
16 ST JOHNS GATE, CLONDALKIN DUBLIN 22, DUBLIN 22
Sold 2 Oct 2026
Locality match
€341,000
217 CHERRYWOOD PARK, CLONDALKIN DUBLIN 22, DUBLIN
Sold 15 Sept 2026
Locality match
€267,000
21 RATHGEAL DEANSRATH, CLONDALKIN DUBLIN 22, DUBLIN
Sold 7 Sept 2026
Locality match
€305,000
1 ROSEBANK HALL, CLONDALKIN DUBLIN 22, DUBLIN
Sold 31 Aug 2026
Locality match
€289,744
14 GLENFIELD PARK, CLONDALKIN DUBLIN 22, DUBLIN
Sold 31 Jul 2026
Locality match
