Major residential
3 shown99-Apartment Mixed-Use Development, Greenhills Road
(1) Demolition of all existing industrial and warehouse structures on site (579.1 sq.m) and associated site clearance works; (2) Construction of part 6, part 7, part 10 storey over basement mixed use block providing 99 no. apartments, comprising 49 no. one-bed units and 50 no. two-bed units, with balconies on all elevations; (3) Provision of a commercial unit (148.2sqm) fronting onto Greenhills Road at ground floor level along with a designated set down area/loading bay; (4) Provision of 87.2 sq.m of designated indoor residential amenity space at the ground floor level; (5) Provision of 1,127 sq.m of Communal Open Space to the rear of the site; (6) An access ramp to facilitate vehicular access to the basement car park which will provide 38 no. car parking spaces; A further 2 no. accessible car parking spaces are provided at ground level, resulting in a total of 40 no car parking spaces; (7) A total of 204 no. bicycle parking spaces (comprising 150 no. long stay and 54 no. short stay) at ground and basement level; (8) Provision of 68m of footpath along the Greenhills Road frontage, and a pedestrian crossing across the Greenhills Road; (9) All enabling and associated site development and works including landscaping, footpaths, boundary treatments, lighting, water and utility services and connections, bin stores, plant and all ancillary development and works above and below ground.
RefusedConcrete Pumping Ltd, Greenhills Road, Walkinstown, Dublin 12 · 28 Jul 2026
588-Apartment Mixed-Use Development, Former Chadwicks Site, Walkinstown
i. The demolition of the former Chadwicks Builders Merchant development comprising 1 no. two storey office building and 9 no. storage/warehouse buildings ranging in height from 3m - 9.9m as follows: Building A (8,764 sq.m.), Building B (1,293 sq.m.), Building C (two-storey office building) (527 sq.m.), Building D (47 sq.m.), Building E (29 sq.m.), Building F (207 sq.m.), Building G (101 sq.m.), Building H (80 sq.m.), Building I (28 sq.m.), and Building J (44 sq.m.), in total comprising 11,120 sq.m.; (ii) the construction of a mixed-use residential and commercial development comprising 588 no. residential apartment units (291 no. one-beds, 238 no. two-beds and 59 no. three-beds), 1 no. 570.91 sq.m. (443 sq.m. indoor space) childcare facility and 6 no. no. commercial/retail units in 4 no. blocks (A-D) ranging in height from 5 to 12 storeys as follows: a. Block A comprises 170 no. apartments (103 no. 1 bed-units, 59 no. 2 bed-units and 8 no. 3- bed units) measuring 8 storeys in height. b. Block B comprises 197 no. apartments (89 no. 1 bed-units, 92 no. 2 bed-units and 16 no. 3 bed-units) measuring 10 storeys in height. c. Block C comprises 81 no. apartments (44 no. 1-bed units, 16 no. 2-bed units and 21 no. 3-bed units) measuring 12 storeys in height. d. Block D comprises 140 no. apartments (55 no. 1 bed-units, 71 no. 2 bed-units and 14 no. 3 bed-units) measuring 8 storeys in height. All apartments will be provided with private balconies/terraces; (iii) provision of indoor communal residential amenity (614.14 sq.m.) at ground and first floors of Block A, B & C, ; (iv) the construction of 1 no. childcare facility comprising 443 sq.m. with dedicated outdoor play area (128 sq.m.) located at ground floor of Block B; (v) the construction of 6 no. commercial units at ground floor level of Blocks A, B and D, and 1 no. commercial unit at first floor level of Block A as follows: Block A has 1 no. unit at ground floor comprising 455.8 sq.m. and 1 no. unit at first floor level comprising 160.79 sq.m., Block B has 1 no. unit at ground floor comprising 190.96 sq.m. and Block D has 4 no. units at ground floor comprising 361.6 sq.m., 232.3 sq.m., 238 sq.m. and 174.9 sq.m.; (vi) the construction of 4 no. vehicular entrances; a primary entrance via vehicular ramp from the north (access from Greenhills Road) and 3 no. secondary entrances from the south for access, emergency access and services (access from the existing road to the south of the site) with additional pedestrian accesses proposed along Greenhills Road; (vii) provision of 270 no. car parking spaces comprising 240 no. standard spaces (including 6 no. car club spaces) and 13 no. mobility spaces, and 8 no. motorbike spaces located at surface level and within undercroft car parks within Blocks A, B , C and D, 17 no. commercial/ unloading/ drop-off parking spaces at ground level; (viii) provision of 1,269 no. bicycle parking spaces comprising 952 no. residents' bicycle spaces, 10 no. cargo/accessible bicycle spaces in 14 no. bicycle storerooms in surface and undercroft parking areas and 307 no. visitors' bicycle spaces located externally at ground floor level throughout the development; (ix) provision of outdoor communal amenity space (3,130.3 sq.m) comprising landscaped courtyards that include play areas, seating areas, grass areas, planting and scented gardens located on podiums at first floor level; provision of communal amenity roof gardens in Block A & B with seating area and planting (746.1 sq.m.) and inclusion of centrally located public open space (6,650 sq.m.) adjacent to Blocks A, B, C and D comprising grassed areas, planting, seating areas, play areas, water feature, flexible use space and incidental open space/public realm; (x) provision of toucan crossing and all associated road markings and signage from the subject site to a new footpath on northern side of Greenhills Road; (xi) development also includes landscaping and infrastructural works, foul and surface water drainage, bin storage, ESB substations, plant rooms, pv panels, boundary treatments, internal roads, cycle paths and footpaths and all associated site works to facilitate the development. This application is accompanied by an Environmental Impact Assessment Report (EIAR).
GrantedLands located at the former Chadwicks Builders Merchant site, South of Greenhills Road, North of the existing access road serving Greenhills Industrial Estate,, Greenhills Industrial Estate, Walkinstown, Dublin 12, D12 HD51, D12 N523,, D12 C602 · 28 Oct 2025
436-Apartment Mixed-Use Development, Parkmore Industrial Estate
The development will comprise the following: Demolition of existing commercial/industrial buildings on site (c.6,711 sq.m in total). Provision of a mixed use, residential and commercial/employment development (c.49,275 sq.m GFA excluding undercroft) within 4 no. blocks ranging in height from 6 to 10 storeys. The development will provide 436 no. apartments (all with individual private open spaces) consisting of: 2 no. studios, 180 no. 1-beds, 158 no. 2-beds and 96 no. 3-beds. The development will also include: internal residential amenity spaces (c.375.3 sq.m in total); community library (c.352.1 sq.m); creche (c.359.1 sq.m), and 4 no. commercial/employment units (c.1,226.6 sq.m) comprising 2 office/co-working units (c.435.8 sq.m in total), medical centre (with ancillary pharmacy)(c.674.1 sq.m) and café (c.116.7 sq.m). • Block A - 9 to 10 storeys in height and will provide 81 no. residential units. • Block B - 9 to 10 storeys in height and will provide 137 no. residential units • Block C - 8 to 10 storeys in height and will provide 85 no. residential units • Block D - 6 storeys in height and will provide 133 no. residential units. Upgrades to the western side of the Parkmore Estate Road and along the Long Mile Road and Robinhood Road to provide a variety of pedestrian/ cyclist access points to the development and with vehicular access provided from the Estate Road with associated upgrades to the Estate entrance. The development will also include 173 no. car parking spaces within 2 no. undercroft car parks on site and including 12 no. parking spaces (for the commercial units) along the Long Mile Road frontage. Provision of 1,040 cycle parking spaces. Provision of public and communal open spaces, landscaping, boundary treatments, plant areas, waste management areas, and services provision (including ESB substations), and all associated works required to enable this development including connection to the Uisce Eireann network. A Natura Impact Statement (NIS) has been prepared in respect of the proposed development.
GrantedUnits 16-21A-B, Parkmore Industrial Estate, Longmile Road, Walkinstown, Dublin 12 · 5 Jun 2025