Planning application 2660302

Battery Energy Storage System, Ballyoughter

Ballyoughter, Ballaghaderreen, Co. Roscommon.

Current status

Further information requested

Latest milestone

Further information requested

14 Aug 2026

Application timeline

Key milestones

Key dated milestones from the planning record.

  1. Application received

  2. Further information requested

Development history

OpenList matches council records and compares their descriptions; links are not council-confirmed.

OpenList context

Why this application matters

Battery storage scheme

The proposal is for an enclosed battery energy storage system on a site of up to about 2.33 hectares at Ballyoughter, Ballaghaderreen. It includes up to 44 battery blocks and up to 11 transformer-and-inverter units.

Grid connection

A single-storey 110kV customer substation, control and switch rooms are proposed to connect the facility to the adjoining ESB Tonroe 110kV Electricity Substation. Associated works include electrical cabling, access tracks and an entrance using the existing roadway.

Site infrastructure

The compound would include 2.6-metre palisade fencing, security gates and CCTV, alongside landscaping and ancillary infrastructure. The stated operational lifespan is 35 years.

Related site history

A substantially matching energy-storage proposal at Ballyoughter was previously refused. Separately, an extension of the existing Tonroe 110kV substation compound, including new 38/20kV transformers and electrical equipment, has received conditional permission.

OpenList context is an AI-assisted interpretation of public planning records. Application status and formal decisions are shown separately from this editorial context.

Application details

Planning reference
2660302
Council
Roscommon County Council
Proposal description
Permission is sought for Grid System Services Limited, applying for a 10-year permission to develop an Energy Storage System, which will connect to the adjoining ESB Tonroe 110kV Electricity Substation. The proposed development will have a projected life span of 35 years. The development will consist of the construction of 1) enclosed battery energy storage system within a site compound on a total of up to c. 2.33 hectare site, to include: 1 no. single storey 110kV customer substation, control and switch rooms; up to 44 battery blocks on concrete support structures including heating, ventilation and air conditioning unit (HVAC units); up to 11 transformer and inverter units; including access tracks and site entrance along existing roadway; associated electrical cabling and ducting; security gates, 2.6m palisade perimeter security fencing; CCTV system; landscaping works and all other associated ancillary infrastructure at
Location / address
Ballyoughter, Ballaghaderreen, Co. Roscommon.
Application type
PERMISSION
Received / registered
22 Jun 2026
Valid date
22 Jun 2026