OpenList

Planning application 2660170

Permission for amendments to previously permitted solar PV farm (RCC Pl.

Taduff East, Athlone, Co. Roscommon.

Decision

Granted with conditions

Latest milestone

Decision: Conditional

4 Nov 2026

Application timeline

Key milestones

Key dated milestones from the planning record.

  1. Application received

  2. Further information requested

  3. Further information received

  4. Decision: Conditional

OpenList context

Why this application matters

Solar Park Amendment

The proposal amends the permitted TDC Community Solar Park under RCC reference PD/21/350 at Taduff East, Athlone, adding ground-mounted solar PV arrays across about 1.98 hectares.

Energy Infrastructure

Works include a transformer/inverter station, underground electrical cabling and ducting, security fencing and associated ancillary site works, forming part of the solar park’s operating infrastructure.

Long-Term Renewable Use

The solar installation is proposed with a 30-year operational life and includes decommissioning and site reinstatement at the end of operation.

Wider Project Assessment

A Natura Impact Statement assesses construction and operation alongside the integral infrastructure of the consented solar park, including access tracks, drainage, landscaping, CCTV, fencing and temporary construction facilities.

OpenList context is an AI-assisted interpretation of public planning records. Application status and formal decisions are shown separately from this editorial context.

Application details

Planning reference
2660170
Council
Roscommon County Council
Proposal description
Permission for amendments to previously permitted solar PV farm (RCC Pl. Ref. PD/21/350), within the townland of Taduff East, Athlone, Co. Roscommon. The proposed development will comprise of: • The addition of solar PV arrays on ground mounted steel frames, with a maximum overall height of 3m, over an area of c. 1.98ha; •1 no. transformer/inverter station; • Internal underground electrical cabling and ducting between the solar PV arrays and inverter/transformer station; • And all associated ancillary site development works and services, including security fencing; • The decommissioning and reinstatement of the solar farm at the end of its operational life. Planning permission is sought for a period of 10 years with an operational life of 30 years from the date of commissioning. A Natura Impact Statement (NIS) accompanies this Planning Application. The NIS assesses the construction and operation of the proposed development, as well as the integral elements of the wider project infrastructure of the consented TDC Community Solar Park (RCC Pl. Ref. PD/21/350), comprising solar PV arrays, inverter and transformer stations, underground cabling and ducting, temporary construction compound, fencing, CCTV, access tracks, site drainage and landscaping, all of which are essential infrastructure associated with the operation of the proposed development. This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413). The planning application is subject to Section 34D of the Planning and Development Act 2000, as amended. When a notice issues in accordance with Section 34D(b), the provisions of Article 26A of the Planning and Development Regulations 2001 to 2025 shall apply. The proposed development is within the townland of

The proposal text available to OpenList may be incomplete. Check the official application record for full details.

Location / address
Taduff East, Athlone, Co. Roscommon.
Application type
PERMISSION
Received / registered
17 Apr 2026
Valid date
29 May 2026
Council decision
Conditional
Council decision date
4 Nov 2026