Planning application 2660530

110kV Substation and Grid Connections at Clonin

Clonin, Coolcor, Rhode, Co. Offaly

Current status

Invalid or incomplete

Latest milestone · Application received

8 Oct 2026

Council record

This application has reached a completed planning stage. New email alerts are no longer available. Existing subscribers can review their saved alerts. My alerts

Planning data and alerts may be delayed or incomplete. Verify important updates and deadlines with the council. Data limitations.

Application timeline

  1. Application received

Development history

OpenList matches council records and compares their descriptions; links are not council-confirmed.

OpenList context

Why this application matters

Grid infrastructure

The scheme would extend the existing Derryiron 110kV transmission node with an EirGrid control building, air-insulated switchgear and a neighbouring independent power producer compound.

Underground connections

Two underground 110kV connections are proposed: one to the Derryiron transmission node and one to an underground cable in the L10093-2 public road previously consented through An Bord Pleanála.

Linked energy development

The IPP compound would connect underground to a permitted energy-storage development, while a new spine road and foul sewer would also serve that development and another permitted scheme.

Site works

Works include removal of a disused medium-voltage substation, a new access road, drainage, landscaping, lighting, security fencing and a temporary construction compound.

OpenList context is an AI-assisted interpretation of public planning records. Application status and formal decisions are shown separately from this editorial context.

Application details

Planning reference
2660530
Council
Offaly County Council
Proposal description
The following: (i) EirGrid compound comprising EirGrid control building and external Air Insulated Switchgear (AIS), (ii) Independent Power Producer (IPP) compound, adjoining the north-western area of the proposed substation, comprising IPP control building, external grid transformer and AIS, and an underground electrical connection to the energy storage development permitted under planning application Ref. 2460289, (iii) underground 110kV electrical connection from the proposed substation to the existing Derryiron 110kV transmission node, including cabling in the public road (L10093-2), (iv) underground 110kV electrical connection from the proposed substation to underground transmission cable in the public road (L10093-2) consented under ABP-309491-21, (v) new vehicular access road (“spine road”) connecting to the RGEP road network, providing access to the proposed 110kV substation, revised access arrangements to the development permitted under planning application Ref. 2460289, and planning application Ref. 20238, (vi) new foul sewer line, serving the proposed 110kV substation and the development permitted under planning applications Ref. 2460289 and Ref. 20238, discharging to the existing local public network, (vii) removal of existing disused medium voltage substation and ancillary items, and (viii) all associated civil engineering and electrical engineering works, including underground electrical cables and ducting, temporary construction compound, surface water and foul water drainage, landscaping, lighting and security fencing
Location / address
Clonin, Coolcor, Rhode, Co. Offaly
Applicant
Rhode LDES Limited
Application type
PERMISSION
Received / registered
8 Oct 2026