OpenList

Planning application 2660511

Derryarkin Materials Recovery Facility

Derryarkin, Rhode, Co. Offaly, R35 X397

Current status

Invalid or incomplete

Latest milestone

Application received

29 Sept 2026

Council record

This application has reached a completed planning stage. New email alerts are no longer available. Existing subscribers can review their saved alerts. My alerts

Application timeline

Key milestones

Key dated milestones from the planning record.

  1. Application received

Development history

OpenList matches council records and compares their descriptions; links are not council-confirmed.

OpenList context

Why this application matters

Facility scale

The scheme would replace 1,417 m² of agricultural sheds and structures with a materials recovery facility designed to accept and process up to 90,000 tonnes of household, commercial and industrial, and construction and demolition waste each year. The main processing building would extend to about 2,850 m² and rise to 13 metres, alongside a 396 m² two-storey administration building.

Site operations

The proposed operational layout includes a new entrance, weighbridge, truck set-down and parking areas, external waste bays, skip and bin storage, a concrete yard, fuel storage and a below-grade truck loading bay. Staff parking would provide 24 spaces, including disabled parking and EV charging.

Water and energy infrastructure

Roof-mounted solar panels would cover 737 m². Separate drainage systems are proposed for uncontaminated runoff and for contaminated runoff and washwater, with a 436.8 m³ attenuation tank, continuous water-quality monitoring, shut-off controls and a 78 m³ contaminated-water collection tank.

Earlier site proposal

An earlier proposal for the same Derryarkin facility included phased waste acceptance: up to 50,000 tonnes annually under a waste facility permit in its first phase, increasing to 90,000 tonnes annually under an industrial emissions licence in a later phase. That earlier proposal was refused on appeal.

OpenList context is an AI-assisted interpretation of public planning records. Application status and formal decisions are shown separately from this editorial context.

Application details

Planning reference
2660511
Council
Offaly County Council
Proposal description
The demolition of existing agricultural sheds and structures on-site and the construction and operation of a Materials Recovery Facility (MRF) for the acceptance and processing of up to 90,000 tonnes per annum of household, commercial and industrial (C&I), and construction and demolition (C&D) waste. Elements of the proposed development include the following. (1) The demolition of all existing agricultural sheds and structures on-site (which cover an area of 1,417 m2). (2) The construction and operation of a Materials Recovery Facility, comprising: (a) a site entrance; (b) a weighbridge; (c) truck set down and parking areas; (d) staff parking, comprising 24 parking spaces including disabled parking and electric vehicle (EV) charging; (e) a concrete yard area; (f) a fuel storage area, consisting of a diesel tank and a raised bund wall; (g) external waste storage bays; (h) skip/bin storage areas; (i) a perimeter boundary wall (4 m in height) and perimeter fencing (2.1 m in height), with a hawthorn hedgerow maintained at a height of 4.5 to 5 m and width of 1.5 to 2 m along the southern perimeter of the site; (j) an overground firewater storage tank (5.5 m in diameter and 3.8 m in height, with a maximum capacity of 78 m³); (k) a two-storey Administration Building (7.35 m in height, with an overall floor area of 396 m²); (l) a single storey MRF building (13 m in height, with an overall floor area of ca. 2,850 m² to a maximum height of 13 m), which will include waste storage and processing areas and a separate workshop area; (m) a below grade truck loading bay situated within the MRF building; (n) an on-site ESB sub-station and adjoining electrical room (2.175 m in height, with a combined floor area of 61 m²); (o) solar panels (covering a total area of 737 m²) mounted atop the proposed Administration and MRF building roofs; (p) an on-site wastewater treatment system (for wastewater generated at sanitary facilities in the Administration Building), including an associated percolation area and ancillary services; (q) a dedicated drainage system for managing uncontaminated stormwater generated on roof and non-process yard areas on-site, which will include a Continuous Water Quality Monitoring System, an underground stormwater attenuation tank (436.8 m³ in size), a Class 1 By-Pass Separator, a proposed slam shut valve (which can be triggered automatically), a hydrobrake and a proposed manhole gate valve; and (r) a separate, dedicated collection system for managing contaminated stormwater generated at external waste storage bays on site and washwater generated inside the MRF building, which will include an underground contaminated stormwater/washwater collection tank (78m³ in size)
Location / address
Derryarkin, Rhode, Co. Offaly, R35 X397
Applicant
Oxigen Environmental Unlimited Company
Application type
PERMISSION
Received / registered
29 Sept 2026

Location context

Nearby sold prices

Recent Property Price Register sales in Co Offaly. Distances are not shown because the sale records do not contain reliable coordinates.

Explore sold prices