Planning application 2660580
Ballyteige Battery Energy Storage Facility
Ballyteige Little, and Ballyteige Big, Co.Offaly
Application timeline
Key milestones
Key dated milestones from the planning record.
Application received
Decision due
Target dateCurrent decision target recorded by the council.
OpenList context
Why this application matters
Energy storage scheme
A battery energy storage system is proposed across a 16.26-hectare site in the townlands of Ballyteige Little and Ballyteige Big, centred on an electrical compound with battery storage enclosures, power-conversion equipment and auxiliary transformers.
Grid connection
The scheme includes an indicative buried 33kV cable, including a watercourse crossing, linking the facility to the switch room at an approved substation.
Site infrastructure
Works include an upgraded entrance, new and upgraded access tracks, crane hardstanding, attenuation pond, fire tanks, fencing, gates, lighting and CCTV, together with landscaping and electrical ducting.
Assessment and lifespan
A Natura Impact Statement accompanies the proposal. Construction permission is sought for 10 years, with operation proposed for 40 years from commissioning.
OpenList context is an AI-assisted interpretation of public planning records. Application status and formal decisions are shown separately from this editorial context.
Application details
- Planning reference
- 2660580
- Council
- Offaly County Council
- Proposal description
- An electricity storage facility comprising a Battery Energy Storage System (BESS) within a total site area of 16.26ha. The development will include one electrical compound, battery storage enclosures (BSEs), power conversion systems on concrete support structures, auxiliary transformers, spares containers, LV switchgear room, aggregation panel with LV pillars, compound fencing, attenuation pond, fire tanks, indicative buried 33kV buried cable with watercourse crossing to switch room in approved substation under ACP reference 323988, upgraded entrance, new and upgraded access tracks, crane hardstanding, associated electrical ducting, stock fencing, gates, lighting /CCTV poles and system, landscaping works, all other ancillary and miscellaneous site works including site clearance. This application seeks a 10-year permission from the date of grant for construction of the Proposed development and an operational life of 40 years from the date of commissioning of the Proposed Development. A Natura Impact Statement (NIS) has been submitted with this application.
- Location / address
- Ballyteige Little, and Ballyteige Big, Co.Offaly
- Applicant
- Ballyteige Solar Limited
- Application type
- PERMISSION
- Received / registered
- 6 Nov 2026
Location context
Nearby sold prices
Recent Property Price Register sales in Co Offaly. Distances are not shown because the sale records do not contain reliable coordinates.
€180,000
KILLURIN, CO. OFFALY, R35 A384
Sold 18 Jun 2026
Locality match
€206,000
48 CARRAIG EAN, CO. OFFALY, OFFALY
Sold 26 Feb 2026
Locality match
€164,000
54 CARRAIG EAN, CO. OFFALY, OFFALY
Sold 5 Jul 2023
Locality match
€20,000
54 Carraig Ean, Co. Offaly, Offaly
Sold 13 Jul 2017
Locality match
€20,000
58 Carraig Ean, Co. Offaly, Offaly
Sold 13 Jul 2017
Locality match