Planning application 2660230

(RED 111) a 38kV hybrid grid connection cable and is intended to connect the permitted Ballyboughlin Solar Park (Pl.

Townlands of Lehinch Kilcoursey Kilbride Aghamore Raheen and Clara, near Clara, Co. Offaly

Current status

Further information requested

Latest milestone

Further information requested

31 Jul 2026

Application timeline

Key milestones

Key dated milestones from the planning record.

  1. Application received

  2. Further information requested

OpenList context

Why this application matters

Grid connection infrastructure

The proposal provides a 38kV hybrid connection between the existing Clara 38kV Substation and the permitted Ballyboughlin Solar Park. It comprises approximately 4.5km of underground cable along public roads and 0.898km of overhead cable.

Associated works

The route crosses the townlands of Lehinch, Kilcoursey, Kilbride, Aghamore, Raheen and Clara. Associated infrastructure includes five joint bays, 38kV ducting and cabling, and related site development and enabling works.

Linked solar project

The connection is integral to the permitted Ballyboughlin Solar Park (Pl. Ref. 24/60338), a circa 14MW solar photovoltaic farm off Curragh Road (L20171) in Clara.

Environmental assessment

A Natura Impact Statement accompanies the application and assesses construction and operation of the grid connection together with integral elements of the wider solar park infrastructure.

OpenList context is an AI-assisted interpretation of public planning records. Application status and formal decisions are shown separately from this editorial context.

Application details

Planning reference
2660230
Council
Offaly County Council
Proposal description
(RED 111) a 38kV hybrid grid connection cable and is intended to connect the permitted Ballyboughlin Solar Park (Pl. Ref. 24/60338) to the existing Clara 38kV Substation. The proposed development will consist of: The laying of a 38kV underground electrical grid connection cable (c.4.5km in length), utilising public roads, and the construction of an overhead electrical grid connection cable (c. 0.898km in length), from the existing Clara 38kV substation to the permitted Ballyboughlin Solar Park (Pl. ref. 24/60338). The proposed development includes all associated site development and site enabling works and ancillary infrastructure, including 5 no. joint bays and 38kV underground ducting and cabling. A Natura Impact Statement (NIS) accompanies this Planning Application. The NIS assesses both the construction and operation of the Proposed Development, as well as integral elements of the wider project infrastructure, comprising the permitted Ballyboughlin Solar Park (Pl. Ref. 24/60338) which consists of the construction and operation of c. 14MW solar photovoltaic (PV) farm located off Curragh Road (L20171) in the townland of Clara, near Clara, Co. Offaly and all associated works. This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413) and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act 2000, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply
Location / address
Townlands of Lehinch Kilcoursey Kilbride Aghamore Raheen and Clara, near Clara, Co. Offaly
Application type
PERMISSION
Received / registered
29 Apr 2026