OpenList

Planning application 22622

A 10-YEAR PERMISSION AND 40 YEAR OPERATION FOR A SOLAR FARM ON 3 NO. LAND PARCELS AS DESCRIBED HEREIN…

THE TOWNLANDS OF DOVEHILL GORTNAMUCK, CURRAGHMORE (EGLISH BY) AND FREAGH, CO. OFFALY

Current status

Withdrawn

Latest milestone

Application received

5 Dec 2022

Application timeline

Key milestones

Key dated milestones from the planning record.

  1. Application received

Application details

Planning reference
22622
Council
Offaly County Council
Proposal description
A 10-YEAR PERMISSION AND 40 YEAR OPERATION FOR A SOLAR FARM ON 3 NO. LAND PARCELS AS DESCRIBED HEREIN: WEST PARCEL (DOVEHILL TOWNLAND) C. 119.25 HECTARES, CENTRAL PARCEL (GORTNAMUCK & CURRAGHMORE (EGLISH BY) TOWNLANDS) C. 42.2 HECTARES AND EAST PARCEL (GORTNAMUCK & FREAGH TOWNLANDS) C. 16.07 HECTARES; A ROUTE CORRIDOR OF 3.5 HECTARES FOR AN UNDERGROUND INTERNAL ELECTRICAL CABLE CONNECTING THE WEST AND CENTRAL PARCELS TO THE EAST PARCEL CONSISTING OF C. 3,859M UNDERGROUND CABLING WITHIN THE CORRIDOR OF THE L6042 'RATH ROAD' PUBLIC ROAD. THE TOTAL SITE AREA FOR THE PROPOSED DEVELOPMENT IS C. 181.02 HECTARES AND CONSISTS OF THE FOLLOWING;1,070,756 SQ. METRES OF SOLAR PHOTOVOLTAIC PANELS ON GROUND MOUNTED STEEL FRAMES; INVERTER / TRANSFORMER STATIONS; UNDERGROUND POWER AND COMMUNICATION CABLES AND DUCTS; BOUNDARY SECURITY FENCING; 2 NO. MEDIUM VOLTAGE (MV) CONTROL BUILDINGS; NEW INTERNAL ACCESS TRACKS ASSOCIATED DRAINAGE INFRASTRUCTURE; SITE ENTRANCES TO THE L6042 'RATH ROAD' PUBLIC ROAD; 54 NO. CCTV/ LIGHTING POSTS AND ALL ASSOCIATED SITE SERVICES AND WORKS. INSTALLATIONS OF INTERNAL NETWORK CABLE COMPRISE TRENCHING FOR AN UNDERGROUND MEDIUM VOLTAGE ELECTRICAL CABLE AND ASSOCIATED JOINT BAYS AND INFRASTRUCTURE, FOR A DISTANCE OF APPROXIMATELY 3,859 METRES IN LENGTH ALONG THE L6042 'RATH ROAD' PUBLIC ROAD AND APPROXIMATELY 661.5 METRES WITHIN THE SOLAR FARM LANDS. THE PROPOSED SOLAR FARM WILL BE BROKEN INTO 2 NO. SEPARATE PHASES. 'PHASE 1' WILL CONSIST OF THE DEVELOPMENT OF THE SOLAR PV ARRAYS LOCATED IN THE EAST PARCEL (C. 16.07 HA), CENTRAL PARCEL (C. 42.2 HA) AND THE WEST PARCEL (C. 52.67 HA). 'PHASE 2' OF THE SOLAR FARM WILL CONSIST OF THE DEVELOPMENT OF THE REMAINDER OF THE SOLAR PV ARRAYS IN THE WEST PARCEL COVERING A SITE AREA OF C. 66.58 HA. AS PART OF A SEPARATE STRATEGIC INFRASTRUCTURE DEVELOPMENT (SID) PLANNING APPLICATION, PROVISION OF A 110KV ELECTRICAL SUBSTATION WITH ELECTRICAL CONTROL BUILDING, ASSOCIATED COMPOUND WITH PALISADE FENCE AND 2 NO. OVERHEAD LINE MASTS, WHICH IS TO BE LOCATED IN THE EAST PARCEL, WILL BE LODGED WITH AN BORD PLEANÁLA IN DUE COURSE
Location / address
THE TOWNLANDS OF DOVEHILL GORTNAMUCK, CURRAGHMORE (EGLISH BY) AND FREAGH, CO. OFFALY
Application type
PERMISSION
Received / registered
5 Dec 2022

Location context

Nearby sold prices

Recent Property Price Register sales in Co Offaly. Distances are not shown because the sale records do not contain reliable coordinates.

Explore sold prices