Wind farms
2 shownpermission to erect a 850 kW wind turbine located in the northern area of our existing plant, with a hub height of 65 metres and a blade radius of 26 metres, together with underground ducting connecting to the existing ESB substation and all associated site works. A Natura Impact Assessment (NIS) will be submitted to the Planning Authority in connection with the application described above. This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413). Significant further information received relates to submitted revised CEMP, Ornithology report, Revised Natura Impact report, Water framework compliance assessment and Updated planning report.
Dundrumman , Scotstown , Co. Monaghan · 25 Nov 2025
permission to erecting a 850kW Wind Turbine, located at the North area of our existing plant; the Wind Turbine will be installed with a hub height of 65 meters and a blade radius of 26 meters, with underground ducting connecting to the existing ESB substation and all associated site works. A Natura Impact Assessment (NIS) will be submitted to the Planning Authority in connection with the application described above, Significant Further Information received relates to submitted, Assessment of landscape & Visual Impact, Proposed Wind Turbine Development Photomontage report, Shadow Flicker Report, Noise Assessment, Veon Ecology Letter, 4 letters of consent from neighbour dwellings, revised site layout plan, revised site location map, revised record map
Dundrumman , Scotstown , Co. Monaghan · 4 Sept 2024

