Planning application LB201276
The development will consist of permission to amend the design of the approved development (planning reference…
Causetown, Stackallen, Navan Co Meath
Application timeline
Key milestones
Key dated milestones from the planning record.
Application received
Decision: CONDITIONAL
Final grant
Application details
- Planning reference
- LB201276
- Council
- Meath County Council
- Proposal description
- The development will consist of permission to amend the design of the approved development (planning reference: LB171475) for an energy storage facility to provide services to the national grid system on the 2.8ha site, Comprising battery containers, combined power conversion system and transformer units, associated electrical infrastructure, fencing, access track, CCTV, ecologically beneficial landscaping, and associated ancillary development on lands in Causestown, Stackallen, Navan, Co. Meath., subject to 17 conditions. Amendments proposed are: - Two phases of development, proposed with the combined capacity of no more than 100MW. - Increase the life of the permission from 5 to 10 years to facilities phase 2. - Amend condition 11 of parent consent (Planning Ref: LB171475) to specify that any remedial road works if required as a result of the development shall be focused on the L3411 from Entrance A to N51 junction. - Amend condition 12 of parent consent (Planning Ref: LB171475) To allow for construction works to be carried out between 0700 and 1900 Monday to Friday and 0800 and 1600 on Saturday. - Increase from 24 to 33 smaller battery containers. 31 of which are orientated in a northwest to southeast direction, with the other two in the southeast corner oriented in an east-northeast to west-southwest direction. - Change from 24 large combined Power Conversion System (PCS) and transformer units to 40 much smaller individual PCS and transformer units. These will no longer be housed in containers but are externally mounted. - Addition of four Low Voltage (LV) cabinets. - Revised layout and size of the grid connection and compliance equipment within the storage area: - Change from a 500m3 underground surface water storage tank to a surface water storage pond, with stock proof fence and gate; - Spare parts container moved from the east to the southwest corner of the ESF compound; - Additional small section of temporary access track and cable trench in west corner for grid related works; - Increase in length of the Modular substation within the ESF. - Removal of Grid transformer off site to be relocated within the associated Grid Connection infrastructure (subject to separate planning application). - Addition of 2No. CCTV Cameras (a total of 7No. CCTV Cameras within the site). - Addition of 5 Security Light Columns
- Location / address
- Causetown, Stackallen, Navan Co Meath
- Application type
- PERMISSION
- Received / registered
- 15 Sept 2020
- Council decision
- CONDITIONAL
- Council decision date
- 11 Jan 2021
- Final grant date
- 23 Feb 2021
Location context
Nearby sold prices
Recent Property Price Register sales in Stackallen. Distances are not shown because the sale records do not contain reliable coordinates.
€280,000
FRENCH LANE, STACKALLEN, NAVAN
Sold 14 May 2025
Locality match
€390,000
ROBINHILL, STACKALLEN, NAVAN
Sold 4 Dec 2024
Locality match
€400,000
CURNIANGHANSTOWN, STACKALLEN, NAVAN
Sold 2 Aug 2022
Locality match
€160,000
FRENCH LANE, STACKALLEN, NAVAN
Sold 20 Jul 2022
Locality match
€248,000
FRENCH LANE, STACKALLEN, SLANE
Sold 2 Mar 2022
Locality match
€122,500
RUSHWEE, STACKALLEN, SLANE
Sold 20 Feb 2018
Locality match