Planning application 2660511
Bord na Móna Powergen Ltd., intend to apply for permission for proposed minor temporary…
Lecarrow Crossmolina Abbeytown Knockalegan Glebe Gortskeddia Ballina Abbeyhalfquarter Knocknalyre and Bunree, Lecarrow Crossmolina Abbeytown Knockalegan Glebe Gortskeddia Ballina Abbeyhalfquarter Knocknalyre and Bunree, Co. Mayo
Current status
Further information requested
Latest milestone
Further information requested
24 Aug 2026
Application timeline
Key milestones
Key dated milestones from the planning record.
Application received
Further information requested
OpenList context
Why this application matters
Purpose and route
Works would facilitate turbine-component deliveries to the permitted Oweninny Wind Farm Phase 3. The 188km turbine delivery route starts at Killybegs Harbour and passes through Donegal, Sligo, Leitrim and Mayo.
Mayo works
The Mayo elements cover 5.87 hectares at selected locations across Lecarrow, Crossmolina, Abbeytown, Knockalegan, Glebe, Gortskeddia, Ballina, Abbeyhalfquarter, Knocknalyre and Bunree, rather than the full route.
Crossmolina infrastructure
Permanent works at Crossmolina include a roughly 2.7km dual-purpose access and public amenity track, a new River Deel bridge crossing, lighting and sustainable drainage.
Temporary delivery measures
Measures for abnormal indivisible loads include temporary load-bearing surfaces, access points and a construction compound, alongside temporary alterations to street furniture, walls, vegetation and lighting. Temporary work areas would be reinstated.
OpenList context is an AI-assisted interpretation of public planning records. Application status and formal decisions are shown separately from this editorial context.
Application details
- Planning reference
- 2660511
- Council
- Mayo County Council
- Proposal description
- Bord na Móna Powergen Ltd., intend to apply for permission for proposed minor temporary and permanent works to facilitate the delivery of turbine components to the permitted Oweninny Wind Farm Phase 3 (Ref. PA16.316178). The Turbine Delivery Route (TDR) will originate at the port of entry at Killybegs Harbour, Co. Donegal, runs through Co. Sligo, Co. Leitrim and terminate at the consented Oweninny Wind Farm Phase 3 site, Co. Mayo. The total length of the TDR is c.188km of which c.65km is within Co. Donegal, c.57km in Co. Sligo, and c.36km in Co. Mayo. Minor temporary and permanent works are not proposed along this entire route but only at select locations. The total area of the works proposed in Co. Mayo is 5.87 Hectares (Ha). The proposed development within Co. County Mayo comprises both temporary and permanent works located in the townlands Lecarrow, Crossmolina, Abbeytown, Knockalegan, Glebe, Gortskeddia, Ballina, Abbeyhalfquarter, Knocknalyre and Bunree. The works are required to accommodate delivery of Abnormal Indivisible Loads (AIL) and will consist of: • Laying of temporary load bearing surfaces at 6 No. locations • Temporary modification to street furniture (traffic lights, bench, junction boxes, wall and part of a bridge parapet/railing) at 1No. location • Temporary removal of street lighting, bollard and tree removal at 1No. location. • Temporary removal of a wall and gate, berm regarding, hedge trimming and temporary modification to street furniture at 1No location. • Temporary removal of wall and vegetation as well as temporary modifications to street furniture at 1No. location • Temporary entrance to be constructed at 3 No. locations • Construction of a dual-purpose permanent access and public amenity track of approx. 2.7km at Crossmolina, Co. Mayo • Construction of permanent bridge crossing of the River Deel at Crossmolina, Co. Mayo • Installation of permanent lighting along the access and amenity track at Crossmolina, Co. Mayo • Installation of permanent sustainable drainage system along the access and amenity track at Crossmolina, Co. Mayo • Installation of temporary construction compound to include site offices, welfare facilities and car parking at Crossmolina Co. Mayo. • Reinstatement of all temporary works areas to previous condition • All associated and ancillary works required for the accommodation works and construction for the TDR. Permission is sought for a period of 10 years. Separate applications wil
- Location / address
- Lecarrow Crossmolina Abbeytown Knockalegan Glebe Gortskeddia Ballina Abbeyhalfquarter Knocknalyre and Bunree, Lecarrow Crossmolina Abbeytown Knockalegan Glebe Gortskeddia Ballina Abbeyhalfquarter Knocknalyre and Bunree, Co. Mayo
- Application type
- PERMISSION
- Received / registered
- 30 Jun 2026
- Valid date
- 30 Jun 2026
Location context
Nearby sold prices
Recent Property Price Register sales in Crossmolina. Distances are not shown because the sale records do not contain reliable coordinates.
€180,000
16 LECARROW DRIVE, CROSSMOLINA, BALLINA
Sold 6 Nov 2026
Locality match
€255,000
45 DEERPARK, CROSSMOLINA, MAYO
Sold 14 Oct 2026
Locality match
€268,000
WOODVILLE, CROSSMOLINA, MAYO
Sold 29 Sept 2026
Locality match
€180,000
TUBBERMORE, CROSSMOLINA, CO MAYO
Sold 23 Sept 2026
Locality match
€55,000
RATHNAMAGH, CROSSMOLINA, MAYO
Sold 3 Sept 2026
Locality match
€70,000
CLOONORAGH, CROSSMOLINA, CO MAYO
Sold 16 Jul 2026
Locality match