Planning application 2660511

Bord na Móna Powergen Ltd., intend to apply for permission for proposed minor temporary…

Lecarrow Crossmolina Abbeytown Knockalegan Glebe Gortskeddia Ballina Abbeyhalfquarter Knocknalyre and Bunree, Lecarrow Crossmolina Abbeytown Knockalegan Glebe Gortskeddia Ballina Abbeyhalfquarter Knocknalyre and Bunree, Co. Mayo

Current status

Further information requested

Latest milestone

Further information requested

24 Aug 2026

Application timeline

Key milestones

Key dated milestones from the planning record.

  1. Application received

  2. Further information requested

OpenList context

Why this application matters

Turbine delivery route

This application provides for selected accommodation works on the c.188km turbine delivery route from Killybegs Harbour to Oweninny Wind Farm Phase 3. The Mayo portion of the route is c.36km, with works proposed only at selected locations across Lecarrow, Crossmolina, Abbeytown, Knockalegan, Glebe, Gortskeddia, Ballina, Abbeyhalfquarter, Knocknalyre and Bunree; the Mayo works area totals 5.87ha.

Oweninny Phase 3 consent

The works are intended to enable delivery of abnormal indivisible turbine-component loads to the permitted Oweninny Wind Farm Phase 3, referenced PA16.316178. The delivery route also passes through Donegal, Sligo and Leitrim before reaching the Mayo wind-farm site.

Permanent Crossmolina infrastructure

In addition to temporary route modifications and reinstatement, the proposal includes a permanent dual-purpose access and public amenity track of about 2.7km at Crossmolina, a permanent River Deel bridge crossing, permanent lighting and sustainable drainage. A temporary construction compound with offices, welfare facilities and parking is also proposed at Crossmolina.

OpenList context is an AI-assisted interpretation of public planning records. Application status and formal decisions are shown separately from this editorial context.

Application details

Planning reference
2660511
Council
Mayo County Council
Proposal description
Bord na Móna Powergen Ltd., intend to apply for permission for proposed minor temporary and permanent works to facilitate the delivery of turbine components to the permitted Oweninny Wind Farm Phase 3 (Ref. PA16.316178). The Turbine Delivery Route (TDR) will originate at the port of entry at Killybegs Harbour, Co. Donegal, runs through Co. Sligo, Co. Leitrim and terminate at the consented Oweninny Wind Farm Phase 3 site, Co. Mayo. The total length of the TDR is c.188km of which c.65km is within Co. Donegal, c.57km in Co. Sligo, and c.36km in Co. Mayo. Minor temporary and permanent works are not proposed along this entire route but only at select locations. The total area of the works proposed in Co. Mayo is 5.87 Hectares (Ha). The proposed development within Co. County Mayo comprises both temporary and permanent works located in the townlands Lecarrow, Crossmolina, Abbeytown, Knockalegan, Glebe, Gortskeddia, Ballina, Abbeyhalfquarter, Knocknalyre and Bunree. The works are required to accommodate delivery of Abnormal Indivisible Loads (AIL) and will consist of: • Laying of temporary load bearing surfaces at 6 No. locations • Temporary modification to street furniture (traffic lights, bench, junction boxes, wall and part of a bridge parapet/railing) at 1No. location • Temporary removal of street lighting, bollard and tree removal at 1No. location. • Temporary removal of a wall and gate, berm regarding, hedge trimming and temporary modification to street furniture at 1No location. • Temporary removal of wall and vegetation as well as temporary modifications to street furniture at 1No. location • Temporary entrance to be constructed at 3 No. locations • Construction of a dual-purpose permanent access and public amenity track of approx. 2.7km at Crossmolina, Co. Mayo • Construction of permanent bridge crossing of the River Deel at Crossmolina, Co. Mayo • Installation of permanent lighting along the access and amenity track at Crossmolina, Co. Mayo • Installation of permanent sustainable drainage system along the access and amenity track at Crossmolina, Co. Mayo • Installation of temporary construction compound to include site offices, welfare facilities and car parking at Crossmolina Co. Mayo. • Reinstatement of all temporary works areas to previous condition • All associated and ancillary works required for the accommodation works and construction for the TDR. Permission is sought for a period of 10 years. Separate applications wil
Location / address
Lecarrow Crossmolina Abbeytown Knockalegan Glebe Gortskeddia Ballina Abbeyhalfquarter Knocknalyre and Bunree, Lecarrow Crossmolina Abbeytown Knockalegan Glebe Gortskeddia Ballina Abbeyhalfquarter Knocknalyre and Bunree, Co. Mayo
Application type
PERMISSION
Received / registered
30 Jun 2026