Planning application 2660555
Carrickcarnan Logistics and Warehousing Business Park
Lands at, Carrickcarnan Townland, County Louth
Application timeline
Key milestones
Key dated milestones from the planning record.
Application received
OpenList context
Why this application matters
Proposed business park
Five logistics and warehousing buildings are proposed at Carrickcarnan, each with associated office space, parking, landscaping and fencing.
Access and site infrastructure
The scheme would use the existing Centrepoint Business Park entrance and provide a new internal road, lighting, an ESB substation, service networks and raised site levels.
Water and drainage
Water supply is proposed from an on-site well. Wastewater infrastructure includes a treatment works, pumping station and rising main discharging via an outfall at Flurry Bridge; surface-water measures include attenuation ponds and an oil interceptor before discharge to the adjacent watercourse.
Environmental assessment
A Natura Impact Statement accompanies the proposal, which includes works close to the Flurry River and associated watercourses.
OpenList context is an AI-assisted interpretation of public planning records. Application status and formal decisions are shown separately from this editorial context.
Application details
- Planning reference
- 2660555
- Council
- Louth County Council
- Proposal description
- Permission will consist of the construction of a business park which will include for the following works: 1. The proposed development will consist of 5no. buildings providing for logistics and warehousing units each with associated offices, parking, landscaping, fencing and site works. 2.The use of the existing entrance that serves Centrepoint Business Park with connection onto same and provision of new roadway within the site. 3.Ancillary works will also include for provision of a well for water supply. 4. A proposed on-site treatment works for wastewater is also incorporated to include a pumping station and rising main which will discharge all treated effluent from the site with outfall connecting to the Flurry River at Flurry Bridge. 5. Provision of associated on-line storage ponds and attenuation as part of the surface water system along with provision of an oil interceptor prior to discharge to the adjacent watercourse. 6. All ancillary site development/construction works to include for infilling and raising of ground levels, internal roads, parking areas, hard and soft landscaping, street lighting, foul, water and service networks to include provision of an ESB substation. A Natura Impact Statement (NIS) has been prepared and accompanies this application.
- Location / address
- Lands at, Carrickcarnan Townland, County Louth
- Application type
- PERMISSION
- Received / registered
- 12 Aug 2026
- Valid date
- 12 Aug 2026
Location context
Nearby sold prices
OpenList shows sold-price context only where a reliable proximity, Eircode or locality relationship can be established.
