2561367

19 Dec 2025

Status: APPEALED

six (6) wind turbines with a tip height of 158m, a rotor diameter of 136m and all associated foundations and hardstanding areas. A 38kV on-site substation compound containing a substation building, associated electrical equipment and transformers with separate client side and ESB entrances. The building will contain a control room, switchgear room, ESB room and store room, underground electrical and communications cabling between the wind turbines and on-site substation. Grid Connection Option A: 2.54km-long 38kV underground cable connection from the on-site substation to the existing Carrons substation to the west of the site. Grid Connection Option B: Loop into the existing 38kV onsite overhead line via the proposed 38kV substation. A new temporary site entrance off the L1219 local road to the west of the permanent site entrance for the construction phase only. Upgrade of an existing farm entrance and access track off the L1219 local road in the northwest of the site to serve as a permanent site entrance for the wind farm when operational. Approximately 3.4km of new site access tracks with associated turning areas and drainage. This includes approximately 490m of temporary access tracks which will be reinstated following construction. Upgrade of approximately 470m of existing site access tracks. A 9m-long clear span bridge crossing of the Ahacronane River by an internal site access track to the northwest of turbine T1 and an associated 1.5m x 1.0m relief culvert. A permanent meteorological mast with a height of 90m, a foundation and hardstand. Two (2) material storage areas with a total capacity of approximately 39,300m3. A temporary construction compound with an area of approximately 1,375m2. All associated site development works, including drainage, diversion or undergrounding of low voltage powerlines, landscaping and revegetation. This planning application is accompanied by an Environmental Impact Assessment Report (EIAR) and Natura Impact Statement (NIS) which have been prepared in respect of the construction, operation and decommissioning of the proposed development, and works to facilitate turbine delivery from the port of Foynes to the wind farm site entrance via L6188, N69, L1222, L1220 and L1219. The Applicant is seeking a 10-year planning permission and 35-year operational life, initiating from the date of full commissioning of the entire wind farm. This development is covered by the provisions of the Renewable Energy Directive III (Di

Limerick City and County Council

within the townlands of Ballynisky Graigoor Ballyegny More Kilbradran Ballysteen Dunmoylan , Carrons and Lisbane , Co. Limerick

Application type: PERMISSIONDecision: REFUSED
View application details

Applications by area

Top Limerick localities in the imported the latest year.

Carrons and Lisbane1

Monthly registrations

Recent application volume by registration month.

Dec 20251

Areas in Dec 2025

Localities with the most applications in the latest registration month.

Carrons and Lisbane1

Status in Dec 2025

Current status mix for applications registered in the latest month.

APPEALED1

Types in Dec 2025

Most common application types registered in the latest month.

PERMISSION1

Planning activity and trends

Based on the latest 12 months of imported planning data for this council.

Applications

1

Latest registered

19 Dec 2025

Most active area

Carrons and Lisbane

Most common type

PERMISSION

Latest month apps

1

Month change

+1

Monthly trend

Dec 2025

n/a

00111Dec 25

Area overview

Carrons and Lisbane accounts for 100%

Carrons and Lisbane100%

Status mix

APPEALED accounts for 100%

APPEALED100%

Application types

PERMISSION accounts for 100%

PERMISSION100%