Planning application 2561367

Ballynisky Wind Farm, County Limerick

Within the townlands of Ballynisky Graigoor Ballyegny More Kilbradran Ballysteen Dunmoylan, Carrons and Lisbane, Co. Limerick

Current status

Under appeal

Latest milestone

Appeal lodged with An Coimisiún Pleanála

22 Apr 2026

Application timeline

Key milestones

Council and An Coimisiún Pleanála milestones.

  1. Application received

  2. Decision: REFUSED

  3. Appeal lodged with An Coimisiún Pleanála

    Official An Coimisiún Pleanála dataView appeal case

Development history

OpenList matches council records and compares their descriptions; links are not council-confirmed.

OpenList context

Why this application matters

Wind farm scale

The proposal comprises six wind turbines, each with a 158m tip height and 136m rotor diameter, across townlands including Ballynisky, Carrons and Lisbane in County Limerick.

Grid connection

A 38kV on-site substation would connect the turbines by underground electrical and communications cabling, with alternatives to link to Carrons substation or the existing on-site 38kV overhead line.

Access and river crossing

Works include about 3.4km of new access tracks, upgrades to about 470m of existing tracks, and a 9m clear-span bridge over the Ahacronane River with a relief culvert.

Environmental assessment

The wind farm, its grid connection and turbine delivery route from Foynes port are accompanied by an Environmental Impact Assessment Report and Natura Impact Statement.

OpenList context is an AI-assisted interpretation of public planning records. Application status and formal decisions are shown separately from this editorial context.

Application details

Planning reference
2561367
Council
Limerick City and County Council
Proposal description
Six (6) wind turbines with a tip height of 158m, a rotor diameter of 136m and all associated foundations and hardstanding areas. A 38kV on-site substation compound containing a substation building, associated electrical equipment and transformers with separate client side and ESB entrances. The building will contain a control room, switchgear room, ESB room and store room, underground electrical and communications cabling between the wind turbines and on-site substation. Grid Connection Option A: 2.54km-long 38kV underground cable connection from the on-site substation to the existing Carrons substation to the west of the site. Grid Connection Option B: Loop into the existing 38kV onsite overhead line via the proposed 38kV substation. A new temporary site entrance off the L1219 local road to the west of the permanent site entrance for the construction phase only. Upgrade of an existing farm entrance and access track off the L1219 local road in the northwest of the site to serve as a permanent site entrance for the wind farm when operational. Approximately 3.4km of new site access tracks with associated turning areas and drainage. This includes approximately 490m of temporary access tracks which will be reinstated following construction. Upgrade of approximately 470m of existing site access tracks. A 9m-long clear span bridge crossing of the Ahacronane River by an internal site access track to the northwest of turbine T1 and an associated 1.5m x 1.0m relief culvert. A permanent meteorological mast with a height of 90m, a foundation and hardstand. Two (2) material storage areas with a total capacity of approximately 39,300m3. A temporary construction compound with an area of approximately 1,375m2. All associated site development works, including drainage, diversion or undergrounding of low voltage powerlines, landscaping and revegetation. This planning application is accompanied by an Environmental Impact Assessment Report (EIAR) and Natura Impact Statement (NIS) which have been prepared in respect of the construction, operation and decommissioning of the proposed development, and works to facilitate turbine delivery from the port of Foynes to the wind farm site entrance via L6188, N69, L1222, L1220 and L1219. The Applicant is seeking a 10-year planning permission and 35-year operational life, initiating from the date of full commissioning of the entire wind farm. This development is covered by the provisions of the Renewable Energy Directive III (Di
Location / address
Within the townlands of Ballynisky Graigoor Ballyegny More Kilbradran Ballysteen Dunmoylan, Carrons and Lisbane, Co. Limerick
Application type
PERMISSION
Received / registered
19 Dec 2025
Valid date
19 Dec 2025
Council decision
Refused
Council decision date
27 Mar 2026
Appeal lodged
22 Apr 2026