Planning application 2561367
Six (6) wind turbines with a tip height of 158m, a rotor diameter of 136m and all associated foundations…
Within the townlands of Ballynisky Graigoor Ballyegny More Kilbradran Ballysteen Dunmoylan, Carrons and Lisbane, Co. Limerick
Current status
Under appeal
Latest milestone
Appeal lodged with An Coimisiún Pleanála
22 Apr 2026
Application timeline
Key milestones
Council and An Coimisiún Pleanála milestones.
Application received
Decision: REFUSED
Appeal lodged with An Coimisiún Pleanála
Official An Coimisiún Pleanála dataView appeal case
OpenList context
Why this application matters
Wind farm scale
The proposal is for six wind turbines, each up to 158m tip height with 136m rotor diameters, across townlands including Ballynisky, Graigoor, Ballyegny More, Kilbradran, Ballysteen, Dunmoylan, Carrons and Lisbane.
Grid connection and operations
A 38kV on-site substation would link the turbines through underground electrical and communications cabling, with either a 2.54km underground connection to Carrons substation or a loop-in to the existing on-site 38kV overhead line. The substation includes separate client-side and ESB entrances and accommodation for control, switchgear, ESB and storage rooms.
Site access and civil works
The scheme includes about 3.4km of new access tracks, upgrades to about 470m of existing tracks, permanent access from the L1219, and a 9m clear-span bridge over the Ahacronane River with a relief culvert. It also provides a permanent 90m meteorological mast and two material-storage areas with combined capacity of about 39,300m³.
Assessment and delivery route
An Environmental Impact Assessment Report and Natura Impact Statement address construction, operation and decommissioning. Turbine-delivery works are identified along the route from Foynes port via the L6188, N69, L1222, L1220 and L1219 to the site entrance.
OpenList context is an AI-assisted interpretation of public planning records. Application status and formal decisions are shown separately from this editorial context.
Application details
- Planning reference
- 2561367
- Council
- Limerick City and County Council
- Proposal description
- Six (6) wind turbines with a tip height of 158m, a rotor diameter of 136m and all associated foundations and hardstanding areas. A 38kV on-site substation compound containing a substation building, associated electrical equipment and transformers with separate client side and ESB entrances. The building will contain a control room, switchgear room, ESB room and store room, underground electrical and communications cabling between the wind turbines and on-site substation. Grid Connection Option A: 2.54km-long 38kV underground cable connection from the on-site substation to the existing Carrons substation to the west of the site. Grid Connection Option B: Loop into the existing 38kV onsite overhead line via the proposed 38kV substation. A new temporary site entrance off the L1219 local road to the west of the permanent site entrance for the construction phase only. Upgrade of an existing farm entrance and access track off the L1219 local road in the northwest of the site to serve as a permanent site entrance for the wind farm when operational. Approximately 3.4km of new site access tracks with associated turning areas and drainage. This includes approximately 490m of temporary access tracks which will be reinstated following construction. Upgrade of approximately 470m of existing site access tracks. A 9m-long clear span bridge crossing of the Ahacronane River by an internal site access track to the northwest of turbine T1 and an associated 1.5m x 1.0m relief culvert. A permanent meteorological mast with a height of 90m, a foundation and hardstand. Two (2) material storage areas with a total capacity of approximately 39,300m3. A temporary construction compound with an area of approximately 1,375m2. All associated site development works, including drainage, diversion or undergrounding of low voltage powerlines, landscaping and revegetation. This planning application is accompanied by an Environmental Impact Assessment Report (EIAR) and Natura Impact Statement (NIS) which have been prepared in respect of the construction, operation and decommissioning of the proposed development, and works to facilitate turbine delivery from the port of Foynes to the wind farm site entrance via L6188, N69, L1222, L1220 and L1219. The Applicant is seeking a 10-year planning permission and 35-year operational life, initiating from the date of full commissioning of the entire wind farm. This development is covered by the provisions of the Renewable Energy Directive III (Di
- Location / address
- Within the townlands of Ballynisky Graigoor Ballyegny More Kilbradran Ballysteen Dunmoylan, Carrons and Lisbane, Co. Limerick
- Application type
- PERMISSION
- Received / registered
- 19 Dec 2025
- Council decision
- REFUSED
- Council decision date
- 27 Mar 2026
- Appeal lodged
- 22 Apr 2026
Location context
Nearby sold prices
Recent Property Price Register sales in Ballysteen. Distances are not shown because the sale records do not contain reliable coordinates.
€164,000
BALLYAGLISH, BALLYSTEEN, ASKEATON
Sold 29 Aug 2025
Locality match
€55,000
BALLINVOHER, BALLYSTEEN, ASKEATON
Sold 7 Oct 2022
Locality match
€70,000
BALLINVOHER, BALLYSTEEN, ASKEATON
Sold 28 Feb 2022
Locality match
€150,000
MICHELSTOWN, BALLYSTEEN, CO. LIMERICK
Sold 11 Mar 2021
Locality match
€260,000
BALLYNORTH, BALLYSTEEN, ASKEATON
Sold 27 Jun 2019
Locality match
€100,000
MICHELSTOWN, BALLYSTEEN, CO. LIMERICK
Sold 29 May 2017
Locality match
