Planning application 2157
A ten-year planning permission and a thirty- year operational life, from the date of commissioning…
Townlands as above.
Appeal decision
Grant Permissions with Conditions
Council status: APPLICATION FINALISED
Latest milestone
Appeal decision: Grant Permissions with Conditions
29 Aug 2023
Application timeline
Key milestones
Council and An Coimisiún Pleanála milestones.
Application received
Decision: REFUSED
Appeal lodged with An Coimisiún Pleanála
Official An Coimisiún Pleanála dataView appeal caseAppeal decision: Grant Permissions with Conditions
Official An Coimisiún Pleanála dataView appeal case
Application details
- Planning reference
- 2157
- Council
- Leitrim County Council
- Proposal description
- A ten-year planning permission and a thirty- year operational life, from the date of commissioning, for an additional four (4) wind turbines to the nineteen (19) turbine Tullynamoyle windfarm (15 existing turbines and 4 consented turbines) in the townlands of Tullinloughan, Lackagh, Tullynamoyle and Gowlaun, County Leitrim. An underground grid connection to Corderry Substation will be located in the townlands of Tullinwannia, Tullynasharragh, Gubaderry, Tullinwillin, Gortahork, Mullaghmore, Leamaskally, Cornmarve, Drumlumman Glebe, Drumillion, Drumany Glebe, Belhavel, Corrasra and Corderry, Killarga, County Leitrim.The proposed development will constitute the provision of the following: 1. The construction of four (4) wind turbines with maximum hub heights of 92 metres and maximum overall heights of 155 metres to blade tip. 2. The construction of crane hardstand areas located beside each turbine. 3. The construction of one (1) 20kv substation building, 2 No. container units and associated electrical plant for grid stabilisation. 4. Internal windfarm underground cabling including one stream-crossing by overhead line. 5. The construction of new site access tracks and the provision of upgraded access roads. 6. Installation of a drainage system for the proposed hardstand and road areas. 7. Underground grid connection to Corderry 110kv substation, approximately 9.5km in length, along the existing public road network. 8. All associated site development and ancillary works. The planning application will be accompanied by an Environmental Impact Assessment Report (EIAR) and by a Natura Impact Statement.
- Location / address
- Townlands as above.
- Application type
- PERMISSION
- Received / registered
- 29 Mar 2021
- Council status
- APPLICATION FINALISED
- Council decision
- REFUSED
- Council decision date
- 2 Feb 2022
- Appeal lodged
- 1 Mar 2022
- Appeal decision
- Grant Permissions with Conditions
- Appeal decision date
- 29 Aug 2023
Location context
Nearby sold prices
OpenList shows sold-price context only where a reliable proximity, Eircode or locality relationship can be established.
No reliable nearby sold-price match is available for this record. OpenList does not infer an exact property match from an address alone.