Planning application 1926

A thirty year planning permission for an additional four (4) wind turbines to an existing fifteen (15) turbine windfarm.

Townlands detailed above

Decision

CONDITIONAL

Latest milestone

Final grant

28 May 2020

Application timeline

Key milestones

Key dated milestones from the planning record.

  1. Application received

  2. Decision: CONDITIONAL

  3. Appeal lodged

  4. Final grant

Application details

Planning reference
1926
Council
Leitrim County Council
Proposal description
A thirty year planning permission for an additional four (4) wind turbines to an existing fifteen (15) turbine windfarm. The proposed development will constitute the following: (a) the construction of four (4) wind turbines with hub heights of up to 92 metres with an overall height of up to 150 metres to blade tip.; (b) the construction of crane hardstand areas located beside each turbine; (c) the construction of two (2) 20 Kv substation buildings with associated electrical plant, equipment and security fences; (d) Internal windfarm underground cabling; (e) the construction of new site access tracks and the provision of upgraded access roads; (f) Installation of a drainage system for the proposed hardstand and road areas; (g) Underground grid connection approximately five (5) Km in length, predominantly along existing public road network; (h) all associated site development and ancillary works. The planning application is accompanied by an Environmental Impact Assessment Report (EIAR) and by a Natura Impact Statement in lieu of a thirty year planning permission for an additional six(6) wind turbines to an existing fifteen (15) turbine windfarm in the townlands of Lackagh, Tullynamoyle, Gowlaun and Altavra, Killarga, County Leitrim. The grid connection to Corderry Substation will be located in the townlands of Knockacullion, Tawnahoney, Lisnagowan, Tawnylea, Derrintawny, Shivdelagh, Cloonagh, Drumduffy and Corderry, Killarga County Leitrim. The proposed development will constitute the following: (a) the construction of six (6) wind turbines with hub heights of up to 92 metres with an overall height of up to 150 metres to blade tip.; (b) the construction of crane hardstand areas located beside each turbine; (c) the construction of two (2) 20 Kv substation buildings with associated electrical plant, equipment and security fences; (d) Internal windfarm underground cabling; (e) the construction of new site access tracks and the provision of upgraded access roads; (f) Installation of a drainage system for the proposed hardstand and road areas; (g) Underground grid connection approximately five (5) Km in length, predominantly along existing public road network; (h) all associated site development and ancillary works. The planning application is accompanied by an Environmental Impact Assessment Report (EIAR) and by a Natura Impact Statement.
Location / address
Townlands detailed above
Application type
PERMISSION
Received / registered
8 Feb 2019
Council decision
CONDITIONAL
Council decision date
10 Dec 2019
Final grant date
28 May 2020
Appeal lodged
14 Jan 2020

Location context

Nearby sold prices

OpenList shows sold-price context only where a reliable proximity, Eircode or locality relationship can be established.

Explore sold prices
No reliable nearby sold-price match is available for this record. OpenList does not infer an exact property match from an address alone.