Planning application 2560611
Develop the following within Co.
Kilmullen Ullard or Controversyland Clonanny Lea and Loughmansland Glebe, Portarlington, Co. Laois
Appeal decision
Grant permission with conditions
Council status: APPLICATION FINALISED
Latest milestone
Appeal decision: Grant permission with conditions
22 Jul 2026
Application timeline
Key milestones
Council and An Coimisiún Pleanála milestones.
Application received
Decision: REFUSED
Appeal lodged with An Coimisiún Pleanála
Official An Coimisiún Pleanála dataView appeal caseAppeal decision: Grant permission with conditions
Official An Coimisiún Pleanála dataView appeal case
Application details
- Planning reference
- 2560611
- Council
- Laois County Council
- Proposal description
- Develop the following within Co. Laois: • Linear arrays of solar PV panels on ground mounted steel supported structures with associated cabling and ducting (including onsite control and switch gear room and underground cable grid connection to the Bracklone 110kV substation); • 2 no. proposed single storey inverter stations; • A co-located Battery Energy Storage System (BESS) park (including 16 no. containers with cells and 4 no. containers with PCS and inverters) with associated security fencing and gates; • Site Perimeter fencing; • 1 no. new site entrance with palisade double security gates; • 1 no. temporary construction compound/carpark/material storage area with associated temporary site offices, parking areas and security fencing; • 1 no. temporary and 1 no. permanent steel storage containers; • Site access tracks including passing and turning bays; • On-site pole mounted CCTV cameras; • 1 no. temporary construction stage Moby Dick type wheel wash systems; • 1 no. Concrete wash out locations (within temporary construction compound); and • All associated and ancillary works The proposed solar farm development spans a total site area measuring 60.36 ha, of which 37.66 ha is located in Co. Kildare and 22.7 ha is located in Co. Laois. Permission is sought for a period of 10 years with an operational period of 40 years. The total capacity of Solar PV on the site is estimated to be 32 MW. An Appropriate Assessment Screening Report (AASR) and Natura Impact Statement (NlS) has been prepared for this development and submitted with this planning application. The development is covered by the provisions of the (RED III) Renewable Energy Directive III (Directive (EU) 2023/2413 ). The planning application is subject to section 34D of the Planning and Development Act, 2000, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply.
- Location / address
- Kilmullen Ullard or Controversyland Clonanny Lea and Loughmansland Glebe, Portarlington, Co. Laois
- Application type
- PERMISSION
- Received / registered
- 23 Sept 2025
- Council status
- APPLICATION FINALISED
- Council decision
- REFUSED
- Council decision date
- 30 Dec 2025
- Appeal lodged
- 29 Jan 2026
- Appeal decision
- Grant permission with conditions
- Appeal decision date
- 22 Jul 2026
Location context
Nearby sold prices
Recent Property Price Register sales in Portarlington. Distances are not shown because the sale records do not contain reliable coordinates.
€311,000
98 RAILWAY MEWS, PORTARLINGTON, LAOIS
Sold 2 Sept 2026
Locality match
€301,000
SESKIN LANE, PORTARLINGTON, LAOIS
Sold 27 Aug 2026
Locality match
€450,000
BISHOPSWOOD, PORTARLINGTON, CO LAOIS
Sold 17 Aug 2026
Locality match
€225,000
13 SAINT PATRICK'S TERRACE, PORTARLINGTON, CO. LAOIS
Sold 13 Aug 2026
Locality match
€339,207
70 Coill An Easpaig, Portarlington, Laois
Sold 11 Aug 2026
Locality match
€274,000
19 BALLYMORRIS COURT, PORTARLINGTON, LAOIS
Sold 7 Aug 2026
Locality match
