Planning application 2360338
For works proposed at O’Devoy (O’Deevy) roundabout comprising active travel infrastructure improvements to include the…
A c. 2.98 Ha site at Summerhill Portlaoise Co. Laois. The site is generally bound to the north by Aghnaharna Drive to the east by the Holy Family School Road and to the west and south by undeveloped agricultural lands., Portlaoise, Laois
Application timeline
Key milestones
Key dated milestones from the planning record.
Application received
Application details
- Planning reference
- 2360338
- Council
- Laois County Council
- Proposal description
- For works proposed at O’Devoy (O’Deevy) roundabout comprising active travel infrastructure improvements to include the introduction of new shared pedestrian/cycle areas on the southern side of the Southern Circular Road and Aghnaharna Drive and improved pedestrian and cycle crossing facilities across the site access arm of this junction. Proposal for the removal of the redundant western arm of the roundabout to the southeast at the Holy Family School Road and the provision of new active travel infrastructure incorporating a two-way cycle track with the adjoining footpath along the eastern boundary which transitions to a shared pedestrian / cycle facility to the north as it approaches the O’Kelly roundabout, and continues on the southern side of Aghnaharna Drive on the western arm of this roundabout. Wastewater will be pumped via a rising main to discharge into the existing 450mm public wastewater sewer to the north-east at the O’Kelly roundabout. Potable water supply will be provided through a new connection to the existing 400mm public watermain on Aghnaharna Drive. A pumping station is proposed southwest of the main development site. The development site area, roadworks, water and drainage works, and pumping station will provide a total application site area of c. 3.39 Ha. The development will consist of: a 2 No. storey Neighbourhood Centre (1,484 sq m) principally comprising a retail unit 361 sq m), a creche (289 sq m), refuse storage (23 sq m) and cycle storage (65 sq m) at ground floor level and office floorspace (746 sq m) at ground and first floor level; the provision of 57 No. houses (comprising of: 5 No. detached dwellings (three-storey 5-bed); 3 No. semi-detached corner dwellings (two-storey 4-bed); 29 No. semi-detached dwellings (two-storey 4-bed); 20 No. edge house t-shape dwellings (two-storey 4-bed); and 5 No. 3 No. storey duplexes comprising 5 No. 2-bed units and 5 No. 3-bed units. The development will also include: a new Link Road through the site, providing vehicular entrance/exit to the site via O’Devoy (O’Deevy) roundabout; roof plant at the Neighbourhood Centre; ancillary car parking spaces; public open space; boundary treatments; hard and soft landscaping; sub-stations; lighting; and all associated site and development works above and below ground.
- Location / address
- A c. 2.98 Ha site at Summerhill Portlaoise Co. Laois. The site is generally bound to the north by Aghnaharna Drive to the east by the Holy Family School Road and to the west and south by undeveloped agricultural lands., Portlaoise, Laois
- Application type
- PERMISSION
- Received / registered
- 30 Aug 2023
Location context
Nearby sold prices
Recent Property Price Register sales in Portlaoise Laois. Distances are not shown because the sale records do not contain reliable coordinates.
