OpenList

Planning application 2660634

Loan Battery Energy Storage System

Within the townland of Loan, Castlecomer, Co. Kilkenny

Current status

Application registered

Next key date

Decision due

30 September 2027

Application timeline

Key milestones

Key dated milestones from the planning record.

  1. Application received

  2. Decision due

    Target date

    Current decision target recorded by the council.

OpenList context

Why this application matters

Energy storage facility

A battery energy storage system is proposed on an approximately 2.02-hectare site in the townland of Loan, with capacity of up to 20MW peak and a stated 40-year operational life.

Infrastructure and grid connection

The scheme includes 32 battery units, eight transformers, control and switchgear buildings, water tanks and underground cabling. A 33kV cable would connect the on-site switchgear to the substation serving the adjacent solar farm.

Access and site works

Access would use an existing point from the R426 southeast of the site, upgraded for safe vehicle movements. Works also include access tracks, fencing and gates, CCTV and lighting posts, a temporary construction compound and landscaping.

Local energy context

A separate proposal in Loan provides for a single 4.26MW wind turbine and a connection to the Castlecomer 38kV substation, indicating other renewable-energy infrastructure is proposed in the same townland.

OpenList context is an AI-assisted interpretation of public planning records. Application status and formal decisions are shown separately from this editorial context.

Application details

Planning reference
2660634
Council
Kilkenny County Council
Proposal description
For development. The development will consist of a 10-year permission for the construction of a Battery Energy Storage System (BESS) on a site of approximately 2.02 hectares. It will comprise 32 no. battery energy storage system units, 8 no. transformers, 1 no. control room, 1 no. switchgear, 1 no. storage container, 2 no. water tanks, underground cabling (including a 33 kV grid connection cable from the on-site switchgear to the substation serving the adjacent solar farm (Planning Reference: 16276)), fencing with access gates, 4 no. closed-circuit television (CCTV) posts, 5 no. lighting posts, 1 no. temporary construction compound, new and upgraded access tracks, and associated landscaping and ancillary works. Access to the Application Site will be provided via an existing access point off the R426, located to the southeast of the Application Site. The access point will be upgraded to facilitate safe entry and exit for traffic. The development will have an operational capacity of up to 20-megawatt peak and is designed to have an operational lifetime of 40 years. This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413) and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act 2000, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply
Location / address
Within the townland of Loan, Castlecomer, Co. Kilkenny
Application type
PERMISSION
Received / registered
2 Oct 2026
Valid date
2 Oct 2026

Location context

Nearby sold prices

Recent Property Price Register sales in Castlecomer. Distances are not shown because the sale records do not contain reliable coordinates.

Explore sold prices