Large residential
3 shownfor the construction of 91No. residential units, comprising 15No. 1-bed apartments, 09No. two-bed apartments, 59No. 3-Bed two-storey terraced houses and 08No. 4-bed two-storey semi-detached houses plus the construction of 01No. creche building. The development will include the establishment of new vehicular and pedestrian access from the public road (Clover Avenue), along with all associated site development works, landscaping, open spaces, boundary treatments, service provisions, connections to public drains, and all ancillary site works
Clover Avenue , Abbeylands , Ferrybank · 25 May 2026
for the construction of 61No. residential units, comprising 09No. 1-bed apartments, 06No. two-bed apartments, 38No. 3-Bed two-storey terraced houses and 08No. 4-bed two-storey semi-detached houses. The development will include the removal of existing rising walls and floor slabs built as part of an earlier planning permission, the establishment of new vehicular and pedestrian access from the public road (Clover Avenue), along with all associated site development works, landscaping, open spaces, boundary treatments, service provisions, connections to public drains, and all ancillary site works
Clover Avenue , Abbeylands , Ferrybank Co. Kilkenny · 13 May 2026
for a development of 72 no. residential units. The proposed development (namely Phase 4 of an overall masterplan) consists of: (i) 54 no. house units, comprised of: 18 no. 3-Bed 2-storey semi-detached houses, 28 no. 4-bed 3-storey semi-detached houses, 6 no. 4-bed 2-storey semi-detached houses, and 2 no. 2-bed 2-storey terraced houses; (ii) 1 no. 3-storey apartment block comprising of 9 no. 2-bed own-door apartment units and 9 no. 1-bed own-door apartment units; (iii) continuation of pedestrian and vehicular routes from the adjoining residential development (namely Phase 2 of masterplan); (iv) 1 no. new pedestrian access point from the proposed South - North Access Road (once completed); (v) new foul sewer, storm water drainage, and potable water mains infrastructure with connection to pipework under construction of adjoining development (namely Phase 2 of masterplan); (vi) landscaping and boundary treatments; (vii) car parking and bicycle parking; (viii) public lighting; and (ix) all other associated site works
Abbeygate , Ferrybank , Co. Kilkenny · 16 Jan 2026