Planning application 22314564

Strategic Housing Development at this site to south of the R148 and east of the R158 abutting the M4 Junction 8…

Boycetown , Kilcock , Co. Kildare.

Current status

Withdrawn

Application details

Planning reference
22314564
Council
Kildare County Council
Proposal description
Strategic Housing Development at this site to south of the R148 and east of the R158 abutting the M4 Junction 8 roundabout, Boycetown, Kilcock, Co. Kildare (9.75 hectares). The proposed development (30,839 sqm GFA) will consist of the demolition of a detached, vacant cottage (gfa 69 sqm) and the construction of 272 residential units (149 No. houses, 65 apartments and 58 duplexes), childcare facility and foul pumping station along with associated ancillary works and site works. The 149 No. dwellings consist of: 40 No. 4-bed 2-storey houses, 8 No. 4-bed 3 storey houses, 90 No. 3-bed 2-storey houses,11 No. 2-bed 2-storey houses. The proposed apartments and duplexes are provided in 7 No. blocks ranging in height from 3 to 4 storeys, with the exception of 1 No. Duplex Block (Type N1), which is a 3-storey, end of terrace unit. Block A and Block B contain Rooftop terraces at 4th floor level. The Duplex Blocks (Type J1, J2, J3, J4, K1, L1, M1, N1) are all 3-storey and contain 58 units divided as follows: 6 No. 1-bed ground floor apartments units, 23 No. 2-bed ground floor apartment units, 1 No. 2-bed duplex unit (two-storey unit), 25 No. 3 bed duplex units (two-storey units), 3 No. 4-bed duplex units (two-storey units). The 65 apartments are located within Blocks A, B, C and D divided as follows: 17 No. 1-bed units, 37 No. 2-bed units, 11 No. 3-bed units. Block D also contains a childcare facility (gfa 526.2 sqm) and includes a dedicated outdoor play area (c. 210 sqm). Ancillary works including 1 No. vehicular entrance off the R148 to the north and 1 No. vehicular entrance off the R158 to the west, a spine road which will link with the permitted spine road on the adjoining lands to the south-east under PL09.306826, internal roads, footpaths, cycle lanes, car parking (465 No. spaces), cycle storage/parking (426 No. spaces), 2 No. bus stops, bin storage, public open space, hard and soft landscaping, natural play area, play equipment, boundary treatments, public lighting, 3 No. substations (14 sqm each) and controlled pedestrian crossing on the R148. All associated site and infrastructural works including underground wastewater pump station (a wetwell); welfare building 6.25sqm and 3 m in height; 472m of 125mm OD rising main and 250m of gravity sewer along the R148; an underground emergency storage tank, capacity 230m³ approx., above ground lifting gantry; valve and flowmeter chambers; a chemical dosing facility for odour control; Passive Carbon Unit;
Location / address
Boycetown , Kilcock , Co. Kildare.
Application type
PERMISSION
Received / registered
7 Sept 2022

Planning timeline

Key dated milestones from the planning record.

  1. Application received

Location context

Nearby sold prices

Recent Property Price Register sales in Boycetown. Distances are not shown because the sale records do not contain reliable coordinates.

Explore sold prices