Major residential
6 shown57-Dwelling Residential Development, Station Road, Leixlip
a residential development of 57 dwellings, as follows;- 12 no. 3-storey, 4-bedroom semidetached houses; 9 no. 3-storey 3-bedroom terraced houses; 6 no. 3-storey, 3-bedroom end of terrace houses; 3 no. 1-bedroom 2-Storey units in converted stone barn, 15 no. 2-Bed apartments and 12 no. 1-Bed Apartments in 2 no. 3-storey apartment blocks; with bicycle and refuse stores; site and infrastructural works including foul and surface water drainage, water services, landscaping, planting, boundary walls, roads, carparking, bicycle stands and pathways; new pedestrian access from Station Road and new road access from Knockaulin Estate. Revised by Significant Further Information which consists of revised design of houses, apartments and ancillary buildings, revised layout including removal of one house and revised car parking and public open space and relocation of pedestrian entrance on Station Road.
ActivePre-validationStation Road , Leixlip , Co. Kildare · 23 Sept 2026
125-Unit Residential Development, Confey, Leixlip
A Large-Scale Residential Development (LRD) on a site of approximately 4.26 hectares (gross) at lands located in the townland of “Confey”, Leixlip, Co. Kildare. The main development site is bounded to the north by R149 road, Confey GAA Club to the west, Royal Canal to the south and agricultural lands to the east. The application site also includes a section of the Royal Canal towpath extending from Cope Bridge to the south-western boundary of the site to facilitate surface improvement works. The proposed development will consist of 125 no. residential units comprising 81 no. houses, 22 no. duplex units and 22 no. apartments. The proposed housing will comprise of 56 no. 3-bedroom houses and 25 no. 4-bedroom houses, in a mix of detached, semi-detached, terraced and end-of-terrace dwellings ranging in height from 1 to 3 storeys. The proposed duplex accommodation will comprise of 11 no. 2-bedroom units and 11 no. 3-bedroom units, provided in 11 no. buildings ranging in height from 1 to 3 storeys. The proposed apartment accommodation will comprise of 5 no. 1-bedroom units and 17 no. 2-bedroom units, provided in a single apartment building ranging in height from 4 to 5 storeys. All residential units will be provided with private amenity space in the form of private rear gardens and/or balconies, as appropriate. The development will also provide public and communal open space, including a linear park parallel to the Royal Canal. The proposed development will be served by two new vehicular access points from the R149 and a new pedestrian access via the Royal Canal. The development will also include 175 no. car parking spaces and 384 no. cycle parking spaces, public, communal and private open spaces, landscaping, boundary treatments, waste management and cycle storage areas, 2 no. ESB substations; Sustainable Drainage Systems (SuDS) areas, and all associated site development works, site services and infrastructure, including connections to the Uisce Éireann water supply and wastewater networks.
Confey , Leixlip , Co. Kildare · 30 Jul 2026
237-Home Residential Development, Leixlip Demesne
Large-Scale Residential Development (LRD) at a site of c. 14.3 hectares. The application site is principally bounded by: Celbridge Road (R404) and Back Gate Lodge, Celbridge, Leixlip, Co. Kildare W23E0F6 to the west; the existing residential developments of Leixlip Park and Wogansfield to the north; the M4 Motorway to the south; and by agricultural lands to the east. The development will consist of the: (1) Construction of 237 No. residential units ranging in height from two-three storeys comprising 30 no. two-bedroom houses (c.86.8sq.m each), 124 no. three-bedroom houses (ranging in area from c.103sq.m to 114sq.m each), 13 No. four-bedroom houses (ranging from c. 151sq.m to 168sq.m) , 20 No. one-bedroom apartments (ranging in area from c.56.6sq.m each), 22 No. two-bedroom duplex apartments (ranging in area from c. 86.9sq.m to 89.0sq.m) and 22 No. three-bedroom duplex apartments (ranging in area from c.127sq.m to 139sq.m each); (2) Construction of a two storey creche (c.278sq.m in area) with associated external play area (c.85.8sq.m. in area); (3) Provision of public open space (totalling c.7.71 ha of which c.5.61 ha comprises strategic amenity space), communal open space (serving the duplex apartments) (c. 570sq.m), and private open space (in the form of private garden areas serving the houses and terraces/balconies serving the apartments/duplexes); and (4) Provision of vehicular, cyclist and pedestrian access/egress and associated circulation routes (including the construction of a fourth arm to the existing three arm junction on the Celbridge Road (R404) opposite the entrance to the existing Barnhall Meadows residential development and pedestrian and cyclist access to the north-east of the site providing access to the existing residential development known as Leixlip Park). The development will also consist of: (5) 303 No. car parking spaces (including 31 No. car parking spaces for visitors and 12 No. car parking spaces serving the proposed créche): (6) Electric vehicle (EV) charging infrastructure; (7) 355 No. bicycle parking spaces (including 17 No. bicycle parking spaces serving the proposed créche and 160 No. bicycle parking spaces serving the proposed strategic amenity/public open space); (8) Bicycle storage; (9) Bin storage; (10) 3 No. ESB substations; (11) Undergrounding and diversion of the existing 20kV and 38kV overhead power lines; (12) Equipped play areas; (13) Photovoltaic roof panels; (14) Boundary treatments (including gates, piers, railings, walls and openings to the former demesne wall); (15) Provision of lighting; (16) All hard and soft landscaping; (17) Provision of Sustainable Urban Drainage systems (SuDs); and (18) All other associated site excavation, infrastructural and site development works above and below ground, changes in level (including the relocation of artificially raised ground from construction of the M4 to create an enlarged berm to the southern boundary of the site bounding the M4 Motorway) and associated retaining features, and associated site servicing (foul and surface water drainage and water supply). An Environmental Impact Assessment Report has been prepared in respect of the proposed development and submitted with this LRD application
Granted with conditionsLeixlip Demesne , Leixlip , Co. Kildare · 12 May 2023
construction of 65 No. residential units comprising 52 no. duplex/apartment units (9 no. 1 bed units, 29 no. 2 bed units and 14 no. 3 bed units) in 3 no. three storey Apartment/Duplex blocks (Blocks A, B and C), and 1 no. five storey Apartment block (Block D); 6 no. three bed, two storey, semi-detached houses (House Type M1); 6 no. four bed, two storey, semi-detached houses (House Types D and D1); and 1 no. four bed, two storey, detached house (House Type D4). Vehicular and pedestrian access, together with drainage and infrastructure, are integrated with the adjoining residential development (Westfield) permitted under Kildare County Council (KCC) Ref. 16/282 (An Bord Pleanála Ref. PL09.247909), as amended by KCC Refs. 17/1374 and 18/662. The proposed development also includes a pedestrian/cyclist only connection to the R449 to the west, and a pedestrian connection to Green Lane to the south; ancillary exterior bin and bike storage (71 No. bicycle spaces) for the duplex/apartment blocks; public open space (total of 1,914 sqm); internal roads; car parking (85 no. spaces); infrastructure; boundary treatments; and, all associated site and development works on a site measuring approximately 1.18ha
Refusedin the Townland of Collinstown , Junction of R449 and Green Lane , Leixlip · 26 May 2021
a residential development of 57 dwellings, as follows;- 12 no. 3-storey, 4-bedroom semidetached houses; 9 no. 3-storey 3-bedroom terraced houses; 6 no. 3-storey, 3-bedroom end of terrace houses; 3 no. 1-bedroom 2-Storey units in converted stone barn, 15 no. 2-Bed apartments and 12 no. 1-Bed Apartments in 2 no. 3-storey apartment blocks; with bicycle and refuse stores; site and infrastructural works including foul and surface water drainage, water services, landscaping, planting, boundary walls, roads, carparking, bicycle stands and pathways; new pedestrian access from Station Road and new road access from Knockaulin Estate. Revised by Significant Further Information which consists of revised design of houses, apartments and ancillary buildings, revised layout including removal of one house and revised car parking and public open space and relocation of pedestrian entrance on Station Road.
Granted with conditionsStation Road , Leixlip , Co. Kildare · 13 May 2021
a residential development of 63 dwellings as follows: 12 no. 3-storey, 4-bedroom semi-detached houses; 4 no. 3-storey, 3-bedroom semi-detached houses; 6 no. 3-storey, 3-bedroom terraced houses; 2 no. 2 storey, 3-bedroom end of terrace houses; Renovation and conversion of existing stone barns to 3 no. 1-bedroom, 2 storey units; a 5-storey apartment block containing 36 apartments comprising 26 no. 2-bedroom apartments and 10 no. 1-bedroom apartments with bicycle and refuse stores; site and infrastructural works including foul and surface water drainage, water services, landscaping, planting, boundary walls, roads, carparking, bicycle stands and pathways; new road access to Station Road including associated road markings
RefusedSite at Station Road , Leixlip , Co. Kildare · 30 Oct 2020
