6 shownfor a solar farm to be installed over restored landfill with an export capacity of approximately 4.5MW comprising photovoltaic panels on concrete ballast supported frames, construction of and connection to a new single-storey ESB Sub-Station / Switch Room building, installation of 3 No. transformers, ducting & electrical cabling and all associated ancillary works and services
Granted with conditionsBrownstown , Kilcullen , Co Kildare. · 11 Oct 2024
Backfilling of a former sand and gravel pit to its former ground level using approximately 1,240,000 tonnes of imported natural inert waste materials and/or suitable by-product materials, principally soil and stone generated by construction and development projects; Establishment and operation of an inert soil waste recovery facility to provide for the recovery through backfilling, of natural inert soil and stone waste; Installation of site infrastructure including site offices, staff welfare facilities, weighbridge (with dedicated office), wheelwash facility, hardstand areas, fuel storage tanks and site access roads; Use of an existing storage shed as a waste inspection and quarantine facility and for storage of plant and equipment; Separation of any intermixed construction and demolition waste (principally concrete, metal, timber, PVC pipes and plastic) inadvertently imported to site prior to removal off-site to authorized waste disposal or recovery facilities; Temporary stockpiling of imported topsoil pending re-use as cover material for the final restoration of the site; Restoration of the final backfilled landform to long-term grassland/agricultural use. The proposed development requires a waste licence from the Environmental Protection Agency. An Environmental Impact Assessment Report (EIAR) will be submitted to the Planning Authority in connection with the application, for development. Revised by significant further information consisting of; Updated information in Environmental Impact Assessment Report (EIAR). Flood Risk Assessment. New on-site Wastewater Treatment System. Surface Water Management. Road Condition Survey, Road Safety Audit and Sightline Assessment. Invasive Species Management Plan
Granted with conditionsUsk , Kilcullen , Co. Kildare. · 21 Aug 2019
Backfilling of a former sand and gravel pit to its former ground level using approximately 1,240,000 tonnes of imported natural inert waste materials and/or suitable by-product materials, principally soil and stone generated by construction and development projects; Establishment and operation of an inert soil waste recovery facility to provide for the recovery through backfilling, of natural inert soil and stone waste;Installation of site infrastructure including site offices, staff welfare facilities, weighbridge (with dedicated office), wheelwash facility, hardstand areas, fuel storage tanks, and site access roads;Use of an existing storage shed as a waste inspection and quarantine facility and for storage of plant and equipment; Separation of any intermixed construction and demolition waste (principally concrete, metal, timber, PVC pipes and plastic) inadvertently imported to site prior to removal off-site to authorized waste disposal or recovery facilities; Temporary stockpiling of imported topsoil pending re-use as cover material for the final restoration of the site; Retoration of the final backfilled landform to long-term grassland/agricultural use. The proposed development requires a waste licence from the Environmental Protection Agency
Invalid or incompleteUsk , Kilcullen , Co.Kildare · 14 Aug 2019
A solar farm to be installed over restored landfill with an export capacity of approximately 3MW comprising photovoltaic panels on ground mounted frames, connection to existing single-storey ESB Sub- Station / switch room building, installation of 3 No. transformers, ducting and underground electrical cabling and all associated ancillary works and services. Revised by significant further information consisting of; construction management plan detailing construction techniques
Granted with conditionsBrownstown and Carnalaway , Kilcullen , Co. Kildare · 10 Aug 2018
solar farm to be installed over restored landfill with an export capacity of approximately 3MW comprising photovoltaic panels on ground mounted frames, connection to existing single-storey ESB Sub-Station/switch room building, installation of 3 No. transformers, ducting and underground electrical cabling and all associated ancillary works and services at KTK landfill
Invalid or incompleteBrownstown , Kilcullen , Co. Kildare. · 24 Jul 2018
(i) establishment of an inert soil waste recovery facility to provide for the importation of approximately 1,200,000 tonnes of natural inert waste materials, principally excess soil, stone and / or broken rock to backfill the pit void to former ground level and improve lands currently in agricultural use. The development will be carried out on a phased basis and will be completed within 8 years; (ii) share use, with the existing Kilsaran concrete manufacturing and waste facilities, of existing site and services infrastructure including site office, staff welfare facilities, weighbridge (with dedicated office), wheelwash, hardstand areas, fuel storage tanks and site access; (iii) use of section of existing concrete block curing shed as a waste inspection and quarantine facility; and (iv) temporary stockpiling of topsoil pending re-use as cover material for final restoration of the site. The proposed development requires a waste licence from the Environmental Protection Agency. An Environmental Impact Statement (now referred to as an Environmental Impact Assessment Report (EIRA)) will be submitted
Granted with conditionsHalverstown , Kilcullen , Co. Kildare · 23 Apr 2018