Residential development
6 shownfor the construction of 16 no. dwelling houses comprising of the following; 10 no. 3 Bed Semi-Detached 2 storey houses, 4 no. 3 Bed Terraced 2 storey houses, 1 no. 4 Bed Detached 2 and a half storey house, and 1 no. 2 Bed Bungalow; Provision of vehicular access into the site via the existing housing estate at Eallagh to the west with reservation for possible future vehicular access onto the N84 to the east; Provision of new pedestrian connectivity on to the N84, with provision of a new footpath to connect with the existing footpath further to the north towards the town centre, together with the provision of dropped kerbs at existing vehicular entrances along the N84; Provision of ducting to facilitate public lighting along the proposed footpath at the edge of the N84; Provision of car parking to include EV parking and ducting to all spaces for future EV charging points; Provision of a centrally located communal open space area, private open space areas, landscaping, footpaths, raised crossing point, bicycle stands, public lighting, groundworks and revised boundary treatments; Connection to watermain, relocation of existing sewer and storm water network on site and connection to same, together with all ancillary site works and services
Headford , Eallagh , Co. Galway · 30 Jul 2026
for change of house type for 17no. dwellings (Nos. 02-18) from previously permitted 3 storey units to 2 storey units, granted under Pl. Reg. Ref. 19/1001 and extended under Pl. Reg. Ref 25/125. Retention of works to date - these dwellings to be completed in accordance with the revised house design and all associated site and development works
Headford , Siúlóid Fhursa , Co. Galway. · 29 May 2026
for 21 No. residential units, comprising of 16 No. 3 Bedroom semi-detached dwellings, 04 No. 4 bedroom semi-detached dwellings, 01 No. 4 bedroom detached dwellings, with connection of all units to existing water supply, public sewer, storm water sewer. The provision of temporary construction site access route with site compound and all ancillary site services. Gross floor space of proposed works: 3044 sqm
Headford , · 27 May 2025
for the following: 1. The construction of 28 no. residential units, comprising of 22 no. 3-bed houses and 6 no. 4-bed houses. 2.Extension of internal Cúl na Coirre pedestrian and vehicular access (currently under construction) to service the proposed development. 3.Provision of all associated surface water and foul drainage services, provision of an attenuation tank and sustainable drainage solutions (SuDS), connections and all associated site works and ancillary services. Gross floor space of proposed works: 3183.96 sqm
Headford , Cul na Coirre , Co. Galway · 18 Oct 2024
for the following: 1.The construction of 28 no. residential units, comprising of 22 no. 3-bed houses and 6 no. 4-bed houses. 2.Extension of internal Cúl na Coirre pedestrian and vehicular access (currently under construction) to service the proposed development. 3.Provision of all associated surface water and foul drainage services, provision of an attenuation tank and sustainable drainage solutions (SuDS), connections and all associated site works and ancillary services. Gross floor space of proposed works: 3,183.96 sqm
Headford , Cúl na Coirre , Co. Galway · 20 Sept 2024
for the A.The construction of 16 no. houses. These houses to consist of: 8 no. 3 bedroom semi-detached two storey units, 6 no. 3-bedroom mid-terrace two storey units, 1 no. 2 bedroom single storey bungalow and 1 no. 4 bedroom detached two storey unit. B. The provision of a vehicular access point off Galway Road (N84), C. Central communal open space area, D. Internal road, raised pedestrian crossing and pedestrian connectivity via the existing Eallagh estate, E. Public realm landscaping & new boundary treatments, F. Connection to watermain, relocation of existing sewer and storm water network on site and connection to same, together with all ancillary site works and services.Gross floor space of proposed works 1894 sqm.
Eallagh , Headford , Co. Galway · 10 Nov 2022