Quarrying & extraction
2 shownfor the backfill and restoration of a former quarry void on a 3.1-hectare site using imported uncontaminated soil and stone from greenfield sites (which is managed as non-waste by-product in accordance with the EPA National By-product Decision). The development includes provision for temporary infrastructure including a site office, weighbridge, wheelwash and concrete slab for on-site re-fuelling
An Chreig Bhuí , Claregalway , Co. Galway · 12 Jun 2026
for the extraction of rock from an area consisting of 4.35 hectares which was previously subject to rock extraction and all associated facilities/works to a final floor level of 4 mOD; Lateral extension of the existing permitted quarry area over a greenfield area of c.6.1 ha. area to a final floor level of 4 mOD; Restoration of the application area to natural habitat after uses following completion of extraction; All related ancillary development and associated site works including processing (crushing, screening and washing) and stockpiling of materials; provision of landscaped screening berms and all other related activities; The proposed development is within an overall application area of c. 12 hectares and is for a total period of 25 years. The planning application is accompanied by an Environmental Impact Assessment Report
Ardgaineen , Claregalway , Co. Gawlay · 27 Aug 2025

