Planning application FW26A/0358E
The construction, operation and decommissioning of a battery energy storage system (BESS)…
Newtown, North Road, Co. Dublin
Application timeline
Key milestones
Key dated milestones from the planning record.
Application received
Decision due
Target dateCurrent decision target recorded by the council.
OpenList context
Why this application matters
Proposed energy infrastructure
The proposal is for the construction, operation and decommissioning of a battery energy storage system at Newtown on North Road, County Dublin.
Local energy context
Other battery storage schemes have been proposed in Fingal, including a permitted facility at Huntstown Power Station and a separate proposal at Fieldstown.
OpenList context is an AI-assisted interpretation of public planning records. Application status and formal decisions are shown separately from this editorial context.
Application details
- Planning reference
- FW26A/0358E
- Council
- Fingal County Council
- Proposal description
- The construction, operation and decommissioning of a battery energy storage system (BESS), that comprises of one of three battery technology options (Technology Option 1, Technology Option 2 or Technology Option 3). The technology options for the Project comprise of the following parameters: • Technology Option 1: 18 BESS units (4.2 m H × 2.7 m W × 7.6 m L); 9 MV stations (2.8 m H × 2.2 m W × 8.6 m L); Design Layout 1 (Drawing No. 24052-202). • Technology Option 2: 18 BESS units (4.2 m H × 2.5 m W × 6.1 m L); 9 MV stations (2.9 m H × 2.5 m W × 6.1 m L); Design Layout 2 (Drawing No. 24052-203). • Technology Option 3: 16 BESS units (3.2 m H × 2.5 m W × 6.1 m L); 2 MV stations (2.9 m H × 2.5 m W × 12.2 m L); Design Layout 3 (Drawing No. 24052-204) Construction elements for the proposed project include: • Site access track, hardstanding area, foundations for the Battery Energy Storage System (BESS) and Medium Voltage (MV) stations, BESS switch room building, control building, welfare and spare parts building, 38kV transformer and associated bund, earth and Low Voltage (LV) transformer, Distribution System Operator (DSO) substation, associated drainage infrastructure, and all ancillary works; • Installation of BESS units and MV stations; installation of underground power and communications cables between the BESS, MV stations, DSO substation, and control building; • Construction, use, and decommissioning of a temporary site compound to facilitate the works, along with the construction of a new site entrance; • Provision of a grid connection route from the DSO substation to the Finglas 220/38kV substation; and • All associated site works, including site clearance, ancillary development (such as site drainage), installation of security gates and fencing, permanent and temporary signage. The proposed site will be used as a single purpose site as a BESS facility, supporting the decarbonisation of the electrical grid. Permission is sought for the proposed development for a period of 10 years, with an operational period of 40 years.
- Location / address
- Newtown, North Road, Co. Dublin
- Applicant
- Coldwinters Energy Limited
- Agent
- Eimear O'Brien
- Application type
- Permission
- Received / registered
- 21 Sept 2026
- Grid reference
- 711510, 742262
Application location
Approximate map position from available planning location data.
Location context
Nearby sold prices
OpenList shows sold-price context only where a reliable proximity, Eircode or locality relationship can be established.
