OpenList

Planning application FW25A/0531E

South Dublin Routing 4 No.2 Limited intends to apply for planning permission at a site at Orion Business Park…

Orion Business Park, North-West Business Park, Ballycoolin, D15XE2N

Decision

Withdrawn

Latest milestone

Decision: WITHDRAW APPLICATION

11 Dec 2025

Application timeline

Key milestones

Key dated milestones from the planning record.

  1. Application received

  2. Application withdrawn

  3. Decision: WITHDRAW APPLICATION

Application details

Planning reference
FW25A/0531E
Council
Fingal County Council
Proposal description
South Dublin Routing 4 No.2 Limited intends to apply for planning permission at a site at Orion Business Park, North-West Business Park, Ballycoolin, D15XE2N. The application relates to development located on a site that will comprise or will be for the purposes of an activity requiring an Industrial Emissions Licence. The application for planning permission relates to an existing and permitted [Permission Ref. FW17A/0167 (for demolition of existing warehouse and construction of 3 no. data centres and associated works), permission Ref. FW18A/0114 (Amendments to the permitted 3 no. data centres and associated works), permission FW24A/0246E (Amendments to permitted plant yards, energy centres, loading areas and ancillary works)] data centre development. Permission is sought for construction of a data centre building [DUB01b] which will result in the amalgamation of the permitted DC2 and DC3 buildings [FW17A/0167 & FW18A/0114] and include the provision of the permitted Energy Centre EC3 [FW24A/0246E]. The data centre building will include data halls, offices, staff areas, storage areas, plant areas, roof plant, solar PV at roof top level and green roof above office space. The building will have a maximum parapet height of 15.07m. The total floor area of the proposed DUB01b is c.22,295 m2. EC3 will have a gfa of c. 1433m2, parapet height of 12.67m and flues height of 28.0m. Permission is also sought for a 10MVA/38kV substation with a maximum height of c.4.5m and gfa of 173m2, substation maintenance access, heat recovery infrastructure, carpark area with c. 57no. carspaces including 3no. accessible car spaces, and 24 no. EV car parking spaces with charge points. A total of 48no. covered bicycle spaces are also proposed. Permission is also sought for all landscaping (including biodiversity area), drainage, waste storage area, internal and external accessways. The development will be completed within five years of the date of the permission being sought.
Location / address
Orion Business Park, North-West Business Park, Ballycoolin, D15XE2N
Application type
Permission
Received / registered
8 Dec 2025
Council decision
WITHDRAW APPLICATION
Council decision date
11 Dec 2025

Location context

Nearby sold prices

OpenList shows sold-price context only where a reliable proximity, Eircode or locality relationship can be established.

Explore sold prices
No reliable nearby sold-price match is available for this record. OpenList does not infer an exact property match from an address alone.