Planning application F25A/1210E
Dublin Airport Eastlands Phase 1 Cargo Relocation
Lands within and to the east of Dublin Airport to include part of the
Decision
GRANT TIME EXT (3 months) AI
Council status: Registered
Latest milestone
Further information requested
24 Feb 2026
Application timeline
Key milestones
Key dated milestones from the planning record.
Application received
Further information requested
OpenList context
Why this application matters
Phase 1 scope
The 15.11-hectare first phase would relocate four existing South Apron occupiers into replacement Eastlands facilities: an An Post storage and sorting building, Border Inspection Post, Revenue office and airport mortuary.
Cargo development land
The scheme would service three future bellyhold-cargo plots, each about 159.5m by 120m, with 38kV substations and utility connections. It also safeguards a separate plot for a future screening and logistics facility.
Airport connection
A fully bonded airside bridge across the R132 would link Eastlands to the South Apron, while a new left-in/left-out R132 junction would provide landside access.
Operational infrastructure
Proposed works include HGV staging, internal roads, walking and cycling routes, shared parking, drainage and landscaping. The replacement buildings would incorporate roof-mounted solar photovoltaic panels.
OpenList context is an AI-assisted interpretation of public planning records. Application status and formal decisions are shown separately from this editorial context.
Application details
- Planning reference
- F25A/1210E
- Council
- Fingal County Council
- Proposal description
- Planning Permission for lands within and to the East of Dublin Airport, to include part of the airfield in the area of the South Apron, part of the Swords Road R132, and lands to the East of the Swords Road R132, in an area known as 'Eastlands', in the townlands of Corballis, Commons, Cloghran and Toberbunny. Permission is sought for a period of 10 years, for Phase 1 of a cargo relocation project, on a site of 15.11 hectares (ha). Phase 1 will include: 1. Relocation of 4 no. existing occupiers (from the South Apron) to 4 no. replacement facilities (Plot A): i. A postal storage and sorting building (with gross external floor area (GEFA) of circa 1,510 sqm) on behalf of An Post, with landside yard, vehicle loading docks, a bonded yard and solar photovoltaic panels at roof level. ii. Border Inspection Post (BIP) for processing goods from non-EU countries (with GEFA of c. 2,320 sqm) with landside yard, vehicle loading docks, a bonded yard and solar photovoltaic panels at roof level. iii. A Revenue office building (with GEFA of c. 2,035 sqm); 76 no staff parking spaces, 18 no. operational van spaces and solar photovoltaic panels at roof level, 12 no. customer parking spaces. iv. An Airport Mortuary for receiving, holding, transferring deceased persons (with GEFA of c. 200 sqm) with 6 no. mourner parking spaces and solar photovoltaic panels at roof level; v. Shared parking infrastructure: 26 no. staff spaces; 11 no. motorcycle parking spaces, a Cycle shelter (52 no. spaces), an access footpath and cycleway and a dedicated HGV staging area for the new Cargo units; 2. Provision of 3 no. serviced sites to include: 3 no. for future bellyhold cargo buildings (Plots B, C and D) and associated 3 no. 38 kV substations; all utilities, including water connections, communications, and power (Plots B, C, and D each measuring c. 159.5m x 120m), all internal roads, footpaths and cycleways; 3. A safeguarded area for daa screening and logistics facility (Plot E measuring c. 159.5m x 80m); 4. A new left in, left out priority junction on Eastern Side of R132; 2 no. traffic lanes and 1 no. combined footpath & cycleway on one side; 5. All associated infrastructure, including fencing, an airside access bridge spanning the R132 (with a c. 5.3 m high structural clearance, abutments and wing walls along with embankment structure on east side of the R132). This bridge will provide a fully-bonded access between the proposed facilities and the South Apron at Dublin Airport; 6. Construction compounds, temporary welfare facilities, drainage infrastructure, refuse storage, cycle parking shelter, tree and hedgerow removal, hard and soft landscaping and all other associated site work. Planning Permission is being sought for a ten-year period. An Environmental Impact Assessment Report (EIAR) has been prepared in respect of the Proposed Development and will be submitted to the planning authority with the Planning Application.
- Location / address
- Lands within and to the east of Dublin Airport to include part of the
- Application type
- Permission
- Received / registered
- 22 Dec 2025
- Council status
- Registered
- Council decision
- GRANT TIME EXT (3 months) AI
Location context
Nearby sold prices
OpenList shows sold-price context only where a reliable proximity, Eircode or locality relationship can be established.