Planning application F05A/1428/E1
The development will consist of the construction of a 3 to 7storey building on the site of existing surface carpark to…
Lands At Former Celestica Factory, Swords, Co. Dublin
Current status
Application registered
Latest milestone
Decision: GRANT EXTENSION OF DURATION OF PERM.
12 Sept 2012
Application timeline
Key milestones
Key dated milestones from the planning record.
Application received
Decision: GRANT EXTENSION OF DURATION OF PERM.
Application details
- Planning reference
- F05A/1428/E1
- Council
- Fingal County Council
- Proposal description
- The development will consist of the construction of a 3 to 7storey building on the site of existing surface carpark to south of existing factory (unoccupied) comprising 4 blocks surrounding 2 no. internal courtyards all over a 2 storey basement. The building will comprise: a 4 to 5 storey over basement south-west block comprising science and technology enterprise offices (3564sq.m.) with terrace and setback to west elevation at 3rd floor level and to south elevation at 4th floor level, cafe (290sq.m.), 2 no. retail units (250 & 290 sq. m.), associated signage; a 5 storey over basement south block comprising science and technology enterprise offices (4350sq.m.) with terrace and set back to south elevation at 4th floor level, 2 no. retail units (290sq.m. each), associated signage; a 4 to 7 storey over basement south-east block comprising science & technology enterprise offices (5169sq.m.) with terrace and set back to east elevation to third and sixth floor levels, 1 no. retail unit (290 sq.m.), associated signage; a 3 storey over basement north block comprising science & technology enterprise offices (3663sq.m.); a 2 storey basement with associated vents comprising plantrooms, car-parking (15560sq.m.) for 490 cars entered via new access road to north of proposed building adjacent to existing unoccupied factory. The development includes the construction of a new access road with on-street carparking to the west and north of the proposed building to be connected via a new site entrance to the Glen Ellan Road to the south of the site.
- Location / address
- Lands At Former Celestica Factory, Swords, Co. Dublin
- Application type
- Extension Of Duration Of Permission
- Received / registered
- 23 Jul 2012
- Council decision
- GRANT EXTENSION OF DURATION OF PERM.
- Council decision date
- 12 Sept 2012
Location context
Nearby sold prices
Recent Property Price Register sales in Swords. Distances are not shown because the sale records do not contain reliable coordinates.
€520,000
44 SANDFORD WOOD, SWORDS, DUBLIN
Sold 18 Sept 2026
Locality match
€415,000
8 BOROIMHE ALDER, SWORDS, CO DUBLIN
Sold 11 Sept 2026
Locality match
€520,000
16 GARTAN DR, SWORDS, DUBLIN
Sold 2 Sept 2026
Locality match
€385,000
203 ST WERBURGHS, SWORDS, CO DUBLIN
Sold 1 Sept 2026
Locality match
€400,000
153 GLASMORE PARK, SWORDS, CO. DUBLIN
Sold 26 Aug 2026
Locality match
€525,000
10 HIGHFIELD CRESCENT, SWORDS, DUBLIN
Sold 26 Aug 2026
Locality match
