Planning application WEB3293/26
35-Bedroom Hostel and 4 Apartments, High Street
1-3 High Street, Dublin 8, D08 R990
Current status
Application registered
Next key date
Decision due
10 November 2026
New email alerts are unavailable for this application. Monitoring here relies on the national planning dataset, which can lag council decisions by weeks or longer. Check the official council record for updates and deadlines. Existing subscriptions remain active and can be managed in My alerts.
Application timeline
Key milestones
Key dated milestones from the planning record.
Application received
Decision due
Target dateCurrent decision target recorded by the council.
OpenList context
Why this application matters
Reuse and visitor accommodation
The scheme would repurpose the vacant office building from lower ground to fourth-floor level as a 35-bedroom tourist hostel of about 1,852 sq m, providing 224 bedspaces.
Rear residential extension
A new three- to four-storey rear extension of about 570 sq m would provide four two-bedroom apartments, each with a private balcony. The extension replaces the rear car-park boundary walls and railings.
Access and supporting facilities
Hostel access would use the existing High Street entrance, while the apartments would have separate pedestrian access from St. Michael’s Close. The proposal includes 31 cycle spaces across separate hostel and resident stores, green roofs and roof-mounted PV panels.
Related site consent
A separate social-housing exemption certificate was granted for a 35-bedroom tourist hotel with 224 bedspaces and four two-bedroom apartments at 1–3 High Street.
OpenList context is an AI-assisted interpretation of public planning records. Application status and formal decisions are shown separately from this editorial context.
Application details
- Planning reference
- WEB3293/26
- Council
- Dublin City Council
- Proposal description
- CHANGE OF USE: Cruisevale Limited intend to apply for permission for development at 1-3 High Street, Dublin 8, D08 R990. The development will consist of: a) The change of use of the existing building across all levels (lower ground floor to fourth floor level) from vacant office use to tourist hostel accommodation use; b) Internal demolition works and the reconfiguration of the existing vacant office building to accommodate a 35 no. bedroom tourist hostel (approx. 1,852 sqm) accommodating 224 no. bedspaces in a mixture of accessible and 3-12 no. person bedrooms from first to fourth floor level. c) The hostel development will comprise a reception / lobby area (with pedestrian access via the existing building entrance located off High Street) (approx. 109 sqm), luggage storage room (approx. 6 sqm), staff office (approx. 6 sqm), guest kitchen (approx. 24 sqm), guest dining room / lounge area (approx. 55 sqm), guest laundry facility (approx. 34 sqm) and staff lounge and changing rooms (approx. 49 sqm) all at ground floor level. Additional amenities including a bicycle store (approx. 16 sqm) providing for 20 no. bicycle parking spaces for guests and employees, plant room (approx. 32 sqm), storage (approx. 28 sqm), an ancillary BOH room (18 sqm) and a bin store (approx. 15 sq. m) will be provided at the lower ground floor level together with the introduction of a new fire exit along St. Michael's Close; d) The demolition of the rear car park boundary walls and railings and the construction of a 3-4 storey extension (approx. 570 sqm) to the rear of the existing building to accommodate 4 no. 2-bedroom residential apartment units located across the ground to third floor level, each with an associated private open space in the form of a balcony. Separate pedestrian access to the residential apartment units is proposed at lower ground floor level via St. Michael's Close. A bicycle store (approx. 30 sqm) providing for 11 no. bicycle parking spaces for residents, a plant room (approx. 20 sqm) and a residents bin store (approx. 11 sqm) will also be located on the lower ground floor level. The development will also provide for all associated site development works and infrastructure works including green roofs, roof plant, PV panels, boundary treatments, site services and connections for foul drainage, surface water infrastructure and water supply.
- Location / address
- 1-3 High Street, Dublin 8, D08 R990
- Applicant
- Cruisevale Limited
- Agent
- Brock McClure
- Application type
- Permission
- Received / registered
- 16 Sept 2026
- Ward / district
- LEA SOUTH WEST INNER CITY, WARD MERCHANTS QUAY A
- Grid reference
- 715035.2161, 733958.3265
Application location
Approximate map position from available planning location data.
Location context
Nearby sold prices
Recent Property Price Register sales in Dublin 8. Distances are not shown because the sale records do not contain reliable coordinates.
€917,000
38 MOUNTSHANNON RD, DUBLIN 8, DUBLIN
Sold 6 Nov 2026
Locality match
€337,500
14 MARKS ALLEY WEST, DUBLIN 8, DUBLIN
Sold 4 Nov 2026
Locality match
€700,000
8 PARKGATE ST, DUBLIN 8, DUBLIN
Sold 30 Oct 2026
Locality match
€330,000
49 THOMAS ST, DUBLIN 8, DUBLIN
Sold 29 Oct 2026
Locality match
€650,000
35 REUBENS ST, DUBLIN 8, DUBLIN
Sold 29 Oct 2026
Locality match
€650,000
57 TYRCONNELL RD, DUBLIN 8, DUBLIN
Sold 23 Oct 2026
Locality match
