Planning application LRD6050/24-S3Sub01
20.
Former IDA Centre, Prussia Street, Dublin 7, D07 T868, D07 DP96, D07 YK11
Current status
Application registered
Latest milestone · Application received
10 Sept 2026
New email alerts are unavailable for this application. Monitoring here relies on the national planning dataset, which can lag council decisions by weeks or longer. Check the official council record for updates and deadlines. Existing subscriptions remain active and can be managed in My alerts.
Planning data and alerts may be delayed or incomplete. Verify important updates and deadlines with the council. Data limitations.
Application timeline
Final grant
Application received
Application details
- Planning reference
- LRD6050/24-S3Sub01
- Council
- Dublin City Council
- Proposal description
- 20. The construction of the development shall be managed in accordance with a Construction Management Plan, which shall be submitted to, and agreed in writing with, the planning authority prior to commencement of development. This plan shall provide details of intended construction practice for the development, including: (a) location of the site and materials compound(s) including area(s) identified for the storage of construction refuse, (b) location of areas for construction site offices and staff facilities, (c) details of site security fencing and hoardings, (d) details of on-site car parking facilities for site workers during the course of construction, (e) details of the timing and routing of construction traffic to and from the construction site and associated directional signage, to include proposals to facilitate the delivery of abnormal loads to the site, (f) measures to obviate queuing of construction traffic on the adjoining road network, (g) measures to prevent the spillage or deposit of clay, rubble or other debris on the public road network, (h) alternative arrangements to be put in place for pedestrians and vehicles in the case of the closure of any public road or footpath during the course of site development works, (i) details of appropriate mitigation measures for noise, dust and vibration, and monitoring of such levels, (j) containment of all construction-related fuel and oil within specially constructed bunds to ensure that fuel spillages are fully contained. Such bunds shall be roofed to exclude rainwater, (k) off-site disposal of construction/demolition waste and details of how it is proposed to manage excavated soil, and (l) means to ensure that surface water run-off is controlled such that no silt or other pollutants enter local surface water sewers or drains A record of daily checks that the works are being undertaken in accordance with the Construction Management Plan shall be kept for inspection by the planning authority. Reason: In the interests of amenities, public health and safety.
- Location / address
- Former IDA Centre, Prussia Street, Dublin 7, D07 T868, D07 DP96, D07 YK11
- Applicant
- Lyonshall Limited
- Received / registered
- 10 Sept 2026
- Final grant date
- 18 Sept 2024
- Ward / district
- LEA NORTH INNER CITY, WARD ARRAN QUAY E
- Grid reference
- 313999, 235266
Application location
Approximate map position from available planning location data.
Location context
Nearby sold prices
Recent Property Price Register sales in Dublin 7. Distances are not shown because the sale records do not contain reliable coordinates.
€429,000
74 FAUSSAGH AVE, DUBLIN 7, DUBLIN
Sold 13 Nov 2026
Locality match
€585,000
21 ORMOND SQ, DUBLIN 7, DUBLIN
Sold 6 Nov 2026
Locality match
€548,000
70 CHANCERY ST, DUBLIN 7, DUBLIN
Sold 5 Nov 2026
Locality match
€602,000
33 GLENDHU RD, DUBLIN 7, DUBLIN
Sold 23 Oct 2026
Locality match
€550,000
168 OXMANTOWN RD, DUBLIN 7, DUBLIN
Sold 16 Oct 2026
Locality match
€761,000
3 ARDPATRICK RD, DUBLIN 7, DUBLIN
Sold 15 Oct 2026
Locality match
